Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.1 L+₹5,416 (0.41%)Admitted-Fee/PreQual/Technical/Finance | ₹13.1 L+₹5,416 (0.41%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.4 L+₹32,216 (2.47%)Admitted-Fee/PreQual/Technical/Finance | ₹13.4 L+₹32,216 (2.47%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.4 L+₹32,697.40 (2.50%)Admitted-Fee/PreQual/Technical/Finance | ₹13.4 L+₹32,697.40 (2.50%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹16.2 L+₹3.1 L (23.6%)Admitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹16.2 L+₹3.1 L (23.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P RAGUNATHAN L4 | GOPALAKRISHNAN L5 | BALASUBRAMANIYAN L2 | DHEV & CO L3 | SASIKALA L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Storm Water Drain | ||||||||
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 398 | M3 | 89.49 ₹35,617.02 | 107.94 ₹42,960.12 | 89 ₹35,422 | 89 ₹35,422 | 87 ₹34,626 Lowest |
| 3.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 40 | M3 | 2,148.49 ₹85,939.6 | 2,591.53 ₹1,03,661.2 | 2,100 ₹84,000 | 2,100 ₹84,000 | 2,098 ₹83,920 Lowest |
| 4.00 | Plain Cement Concrete 1:4:8 (One cement, Four sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 40 | M3 | 5,587.54 ₹2,23,501.6 | 6,739.72 ₹2,69,588.8 | 5,456 ₹2,18,240 | 5,850 ₹2,34,000 | 5,454 ₹2,18,160 Lowest |
| 5.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 442 | M2 | 430.01 ₹1,90,064.42 | 518.7 ₹2,29,265.4 | 425 ₹1,87,850 | 455 ₹2,01,110 | 420 ₹1,85,640 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (One Cement, Two sand and Four broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. | 56 | M2 | 6,783.56 ₹3,79,879.36 | 8,181.63 ₹4,58,171.28 | 6,630 ₹3,71,280 | 6,624 ₹3,70,944 Lowest | 6,624 ₹3,70,944 Lowest |
| 7.00 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 111 | M3 | 277.17 ₹30,765.87 | 334.31 ₹37,108.41 | 271 ₹30,081 | 270 ₹29,970 Lowest | 270 ₹29,970 Lowest |
| 8.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 188 | M3 | 1,143.91 ₹2,15,055.08 | 1,379.81 ₹2,59,404.28 | 1,118 ₹2,10,184 | 1,117 ₹2,09,996 Lowest | 1,117 ₹2,09,996 Lowest |
| 9.00Water Supply Arrangements | ||||||||
| 10.00 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers. Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary soil.SS20B TWAD SOR Pg No.192 | 311 | M3 | 112.88 ₹35,105.68 | 136.16 ₹42,345.76 | 111 ₹34,521 | 110 ₹34,210 Lowest | 110 ₹34,210 Lowest |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
21 Aug 2026, 3:00 pmClosed
The Commissioner, Nagapattinam Municipality.
The Commissioner, Nagapattinam Municipality.
Construction of Storm Water Drain and Water Supply Arrangements at Layout for T.S.No.428/2A,3,4,5,6 Ward - 4,Block - 13 in Nagapattinam.
2026_MAWS_692078_4
0070/2026/E1
Open Tender
Civil Works - Others
Item Rate
60 days
Nagapattinam Municipality
Qualification
2 documents required · 2 mandatory
₹0
₹18,500
Yes
21 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Storm Water Drain | |||||
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 398 | M3 | 10 | ₹3,980 |
| 3 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 40 | M3 | 10 | ₹400 |
| 4 | Plain Cement Concrete 1:4:8 (One cement, Four sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 40 | M3 | 10 | ₹400 |
| 5 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 442 | M2 | 10 | ₹4,420 |
| 6 | Plain Cement Concrete 1:2:4 (One Cement, Two sand and Four broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. | 56 | M2 | 10 | ₹560 |
| 7 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 111 | M3 | 10 | ₹1,110 |
| 8 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 188 | M3 | - | - |
| 9Water Supply Arrangements | |||||
| 10 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers. Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary soil.SS20B TWAD SOR Pg No.192 | 311 | M3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_832166.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .