Tender Value
₹53.2 Cr
EMD Value
₹1.1 Cr
Closing Date
28 Aug 2026, 3:00 pmClosed
Yes (up to 3 members)
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
GENERAL
22 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
If JV firms are allowed to participate, Financial eligibility of the JV Firm shall be adjudged based on satisfactory fulfillment of the Para No.17.15.2 of Part-I of IRSGCC-2022 [including upto ACS no.11]
NOTE: If the tender is not accompanied by the certificate(s) in support of financial eligibility as above, the tender shall be rejected. No post-tender correspondence will be entertained.
(a)The tenderer must have successfully completed or substantially completed any of the following categories of works during last 07 (seven) years, ending last day of month previous to the one in which tender is invited[Even though the work might have commenced before the qualifying period]: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
The total value of similar nature of work completed during the qualifying period and not the payments received within qualifying period alone, shall be considered. In case, final Bill of similar nature of work has not been passed and final measurements have not been recorded, the paid amount including statutory deductions will be considered. If final measurements have been recorded and work has been completed with negative variation, then also the paid amount including statutory deductions will be considered. However, if final measurements have been recorded and work has been completed with positive variation but variation has not been sanctioned, original agreement value or last sanctioned agreement value whichever is lower shall be considered for judging eligibility.
In case JV firms are allowed to participate, Technical Eligibility of the JV Firm shall be adjudged based on satisfactory fulfillment of the Para No.17.15.1 of Part-I of IRSGCC- 2022 [including upto ACS no.11]
The works executed by tenderer for any Govt. / Govt. bodies / PSUs and public listed company (as detailed in Note for Para No.10.1 of part-I of IRSGCC 2022 including upto ACS no.11) shall only be considered for fulfilling of Technical Eligibility Criteria.
The work experience certificate shall be in the name and style of the tenderer participating or as per provisions under Clause 17.15 of Part-I of IRSGCC 2022 (including upto ACS no.11) for JV Firm, if eligible to participate. However, in case the tenderer is 1.3.1 submitting the certificate issued to a JV firm of which the tenderer is a member, the credentials proportionate to his share in the JV will be considered. The tenderer shall submit an attested copy of relevant JV Agreement along with the Tender.
The work experience certificate shall be issued by an officer not below the rank of JA Grade or Bill passing Officer in Railways and Bill passing Officer/Executive In-charge of 1.3.2 work in other Govt. / Govt. bodies / PSUs. The certificate should bear the signature and seal of the issuing officer, name of the department etc.
Note for Para No.10.1 of Part-I of IRSGCC (including upto ACS no.11); Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated / registered atleast 5 years prior to the date of closing of tender, shall also be considered provided the work 1.3.3 experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Any "Railway /Metro /Road Bridge work having Steel Composite/Bowstring girder and / or PSC girder in super structure". NOTE: Foot over bridges, pipe line crossing, etc. will not be considered for similar nature of work for eligibility consideration.
43 conditions · 9 needing a document upload
The Bid Security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90 days beyond the bid validity period. Tenderers may refer Para 5 of IRSGCC -2022 -Part-I (including up to ACS no.11) for other details in regard to payment of bid security. The original Bank Guarantee should be delivered in person to Dy.CE/C/Plg./SC, Room no.206A, 2nd floor, Rail Nirman Nilayam, S.C. Railway, Secunderabad -500025. Note: As per ACS no.5 issued by Railway Board vide letter No.2022/CE-I/CT/GCC-2022/Policy dt.20.10.2023, "The original Bank Guarantee should be delivered in person to the oficial nominated as indicated in the tender document before closing date for submission of bids (i.e., excluding the last date of submission of bids (Authority: PCE/SC's lr.no.W.496/Policy/Vol.IX, dt:31.05.2024).
Following documents shall be enclosed
In case of Sole Proprietorship Firm, the documents to be attached with the tender are: (i)An undertaking that he is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which he was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.(ii) All documents in terms of Para 10 of the Tender Form (Second Sheet) of IRSGCC 2022(Including upto ACS no.11)
In case, the tenderer is bidding on behalf of HUF the documents to be attached with the tender are : (i) A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii)An undertaking that the HUF is not blacklisted or debarred by Railways or any other Ministry/Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as member of JV in which the HUF was / is a member. Concealment/wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (iii) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of IRSGCC 2022 (Including upto ACS no.11)
In case, the Tenderer is a Partnership Firm, the following documents shall be submitted: (i)A notarized copy of the Partnership Deed or a copy of the Partnership Deed registered with the Registrar. (ii)A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm.(iii)An undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders/contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP in which they were/are partners/members. Any concealment/wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the General Conditions of Contract.(iv)All other documents as mentioned in Para 18 of the tender form (second sheet) of IRSGCC-2022(Including upto ACS no.11)
In case tenderer is a LLP Firm registered under LLP Act-2008, the following documents shall be submitted: (i)A copy of LLP Agreement (ii)A copy of Certificate of Incorporation (iii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract (v)All other documents in terms of Para 10 of Tender form(2nd sheet) of IRSGCC- April-2022 Part-I(Including upto ACS no.11). (vi) All other documents as per Clause 14 of IRSGCC -April -2022- Part I (including upto ACS no.11)
In case the Tenderer is a Company registered under Companies Act-2013:-The tenderer(s) shall submit the following documents: (i)The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii)A copy of Certificate of Incorporation (iii)A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv)An undertaking that the Company is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which the Company was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (v)All other documents in terms of para 10 of tender form (2nd Sheet) of IRSGCC-2022(Including ACS no.11) (vi) All other documents as per Clause 14 of IRSGCC -April -2022- Part I(including upto ACS no.11)
In case the Tenderer is a Registered Society & Registered Trust, the following documents shall be submitted: (i)A copy of Certificate of Registration (ii)A copy of Memorandum of Association of Society / Trust Deed (iii)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust.(iv) A Copy of rules and regulations of the society (v)All other documents in terms of Para 10 of Tender form(2nd sheet) of IRSGCC- April-2022 Part-I(Including upto ACS no.11). (v) All other documents as per Clause 14 of IRSGCC -April -2022- Part-I(Including upto ACS no.11).
In case JV Firms are allowed to participate: JV firm should upload Memorandum of Understanding [MOU] as per the format attached as annexure to the tender in DOCUMENTS. Submission of all other documents by JV firm / Members of JV should also be as per Cl.No.17.14 of Part-I of IRSGCC-2022(Including upto ACS no.11)
Uploading of other relevant documents connected to the tender; such as Declaration regarding employment of Retired Engineer/ Retired Railway officer, NEFT Form, List of Personnel/Organization, List of Plant/ machinery, (As per the formats attached in the list of Documents whatever attached and remaining in their own format to be submitted)etc
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The successful bidder shall submit "Performance Guarantee" amounting to FIVE percent (5%) of contract value after award of the work. Note: If Bid quoted 5% below the advertised tender value, "Additional Performance Guarantee" amounting to FIVE percent (5%) of contract value shall be submitted after award of the work as per ACS No.11 of IRS GCC-2022.
The General Conditions of Contract governing the performance of the works covered by this tender are the IRS GCC-2022 [including upto ACS no.11]. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the attached documents to the tender for reference. Hard copy of IRSGCC (with up-to-date correction slip) may be perused in the office of the Chief Administrative Officer/ Construction/ South Central Railway / Secunderabad - 500071. The tenderer/s is/are deemed to have kept himself/themselves fully Informed of the provisions of the IRS General conditions of Contract including all corrections and Amendments issued up to date (as on date, IRS GCC-2022 upto ACS no.11 shall be considered) while submission of offer and any claim that he/they is/are not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalised by the Railway and will, therefore, be supplied to the contractor as and when they are finalised on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.
Manual tenders, supporting documents etc., sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
All requisite documents are to be properly submitted online only and the bidders should ensure that the content of the documents uploaded is distinctly legible/readable.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Attestation of documents may be self attested or attested by a Gazetted Officer.
Railway reserves the right to verify the authenticity of the documents/information furnished.
TAXES: if rates of existing GST or cess on GST for Works Contract is increased or any new tax /cess on Works Contract is imposed by Statute after the date of opening of tender but within the original date of completion/date of completion extended under clause 17 & 17A of Part-II of IRSGCC-2022 (including upto ACS no.11) and the Contractor thereupon properly pays such taxes/cess, the Contractor shall be reimbursed the amount so paid. Further, if rates of existing GST or cess on GST for Works Contract is decreased or any tax/cess on Works Contract is decreased / removed by Statute after the date of opening of tender, the reduction in tax amount shall be recovered from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India.
This tender complies with PUBLIC PROCUREMENT POLICY ORDER-2017 dated 19.07.2024. Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
After opening of the tender, any document pertaining to the constitution of sole proprietorship Firm/Partnership Firm/ Registered Company/ Registered Trust/ Registered Society/ HUF/LLP etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e, on internet etc) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in the tender offer submitted{Asper clause no. 14(iv) Part I of IRSGCC 2022 including upto ACS no.11}
As per clause no.5 part I of IRSGCC 2022 (including upto ACS no.11) the details of exemptions/discount of Bid Security payment is as follows:
i) Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security.
iii) Labour Cooperative Societies shall deposit only 50% of Bid Security as mentioned in the tender
SCR Construction Organization - Proposed new BG line works between Manoharabad and Kothapalli Stations - GJWL-LKDM Section - Proposed Construction of new Road over Bridge No. 90/A with approaches on either side comprising 14 x 18.40 m RCC Girder + 1 x 36.00 m Composite Welded Girder (Railway Proper) + 9 x 18.40 m RCC Girder in lieu of existing temporary manned LC No. 2 at Ch: 45190.00 m on Kukunoorpalli and Bobbaipally BT Road between Kodakandla and Lakdaram Stations of Hyderabad Division.
37-CAO-C-SC-2026
37-CAO-C-SC-2026
Open
Works - General
18 Months
Unknown (Unspecified Location)
₹0
₹1.1 Cr
28 Aug 2026
23 Jul 2026
14 Aug 2026
168 items across 5 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 9,68,19,483.11 | ||
| — | 500.00 | — | — | ||
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ1 | — | — | — | 1,10,470 | |
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ2 | — | — | — | 34,90,500 | |
| — | 1100.00 | — | — | ||
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ3 | — | — | — | 3,34,389 | |
| — | 500.00 | — | — | ||
| Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor. Joining with strong nylon rope in one cross and one horizontal pattern of minimum 5mm dia. | — | — | — | 39,640 | |
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. All kinds of soils | — | — | — | 37,92,600 | |
| — | 7500.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Soft rock (not requiring blasting) | — | — | — | 29,07,750 | |
| — | 2100.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Hard rock (requiring blasting) | — | — | — | 14,87,157 | |
| — | 450.00 | — | — | ||
| Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Hard rock (blasting prohibited ) | — | — | — | 4,76,239.5 | |
| — | 1250.00 | — | — | ||
| Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size). | — | — | — | 32,20,762.5 | |
| — | 7000.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | 1,85,27,040 | |
| — | 900.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Abutment & Pier | — | — | — | 24,46,830 | |
| — | 2450.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Wing wall and Return wall | — | — | — | 66,60,815 | |
| — | 1025.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. | — | — | — | 28,23,567.5 | |
| — | 1600.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Approach slab at formation level, Dirt wall/ ballast wall at formation level | — | — | — | 42,92,336 | |
| — | 6000.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra for every increase of 1m or part thereof in the height above 9.0 m | — | — | — | 4,31,880 | |
| — | 3100.00 | — | — | ||
| Providing and fixing Weep Holes in Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge. | — | — | — | 7,18,487 | |
| — | 1250.00 | — | — | ||
| Providing and casting machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in-Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. | — | — | — | 36,39,250 | |
| — | 1000.00 | — | — | ||
| Deduct if Plasticiser has not been used in Design Mix Concrete of any grade as per approved mix design or use of 40mm graded stone aggregate in place of 20mm graded stone aggregate in any grade of concrete. Note: Deduction to be made for quantity of concrete. Deduction for using 40mm graded stone aggregate in place of 20mm graded stone aggregate in any grade of concrete. | — | — | — | -1,83,970 | |
| — | 4000.00 | — | — | ||
| Centering and shuttering including strutting, propping etc. and removal of form for : All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level | — | — | — | 24,23,960 | |
| — | 7600.00 | — | — | ||
| Centering and shuttering including strutting, propping etc. and removal of form for : All types of bridge super-structures, e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level. | — | — | — | 59,90,092 | |
| Centering and shuttering including strutting, propping etc. and removal of form for : Extra for additional height over item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. | — | — | — | 12,92,280 | |
| — | 2800.00 | — | — | ||
| Supplying, spreading and compacting well graded hard stone of 63mm average size (maximum up to 80mm size) in the bottom of foundation of box culverts, bridges etc. including all lead, lift, ascent, descent etc. complete job as per directions of Engineer In-charge. | — | — | — | 30,71,124 | |
| — | 1310.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for cast in-situ Prestressed (Post-tensioned) concrete girder / Box girders/Slabs for different spans including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per drawings, specifications and direction of the Engineer in-charge. Note: 1. Payment for Staging, Shuttering, Cement, reinforcement, HTS cables, sheathing, anchorage cones, stressing of cables and grouting of the ducts shall be made extra under relevant items. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. With Soffit level up to 9m above Bed level | — | — | — | 36,08,657 | |
| — | 1300.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for cast in-situ Prestressed (Post-tensioned) concrete girder / Box girders/Slabs for different spans including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per drawings, specifications and direction of the Engineer in-charge. Note: 1. Payment for Staging, Shuttering, Cement, reinforcement, HTS cables, sheathing, anchorage cones, stressing of cables and grouting of the ducts shall be made extra under relevant items. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. With Soffit level From 9m above Bed Level to12m above Bed Level | — | — | — | 37,21,471 | |
| — | 200.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for cast in-situ Prestressed (Post-tensioned) concrete girder / Box girders/Slabs for different spans including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per drawings, specifications and direction of the Engineer in-charge. Note: 1. Payment for Staging, Shuttering, Cement, reinforcement, HTS cables, sheathing, anchorage cones, stressing of cables and grouting of the ducts shall be made extra under relevant items. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. With Soffit level From 12m above Bed Level to 15m above Bed Level | — | — | — | 6,15,724 | |
| — | 1300.00 | — | — | ||
| Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for cast in-situ Prestressed (Post-tensioned) concrete girder / Box girders/Slabs for different spans including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per drawings, specifications and direction of the Engineer in-charge. Note: 1. Payment for Staging, Shuttering, Cement, reinforcement, HTS cables, sheathing, anchorage cones, stressing of cables and grouting of the ducts shall be made extra under relevant items. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. Extra over USSOR Item no. 031013 for Soffit level beyond 15m above Bed Level for every 1m or part thereof | — | — | — | 93,574 | |
| Cubic | Centimetre | — | — | ||
| Design, manufacturing, supplying and fixing in position elastomeric bearing true to line and level conforming to IS:3400, IS:226, BS-5400 under prestressed concrete girders/ Steel Girders, for Pre-cast as well as cast-in-situ girders as per approved drawing. The rate shall include cost of load test of one no. bearing from Railway approved firms and all fixing materials, equipments, machineries, labour, taxes, loading, unloading, leading, lifting etc. complete. Rates include getting the drawing approved from Railway and cost of inspection during manufacturing from railway approved organization.Note : 1. The rate is for finished item complete and paid only after fixing in position below the girder. 2. The volume shall be as given in the drawing and no deduction shall be made for inserted steel plates etc. | — | — | — | 27,16,080 | |
| — | 300.00 | — | — | ||
| Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge. For 40mm expansion | — | — | — | 18,44,667 | |
| — | 30.00 | — | — | ||
| Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge. For 80mm expansion | — | — | — | 2,53,474.5 | |
| — | 3.00 | — | — | ||
| Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load. For Span design load up to 100 MT | — | — | — | 2,26,997.19 | |
| — | 400.00 | — | — | ||
| Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor's labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading material etc. The load shall be 1.25 times the stipulated design load. Extra for every increase of 1 MT or part thereof over 100 MT in the span design load capacity up to 800 MT | — | — | — | 1,05,372 | |
| — | 500.00 | — | — | ||
| Providing and fixing in position GI Drainage Spouts of required length with Grating in RCC slab and filling bitumen along kerb as shown in drawing with contractor's pipes, bitumen, tools, equipment, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge. 100mm dia. Drainage Spouts | — | — | — | 5,71,250 | |
| — | 1660.00 | — | — | ||
| Supplying and laying 160mm dia. PVC Pipes Class-I, capable for a pressure of 2.5 kg/sqm in footpath of ROB for laying cable with all contractor's materials labour, tools, plant, machinery, vehicles, consumables, lead, lift etc. complete as per specifications and as directed by Engineer in-charge. | — | — | — | 8,72,346.6 | |
| — | 100.00 | — | — | ||
| Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 35 kg each with voids filled with spalls complete as per drawing and Technical Specification. | — | — | — | 1,62,755 | |
| — | 50.00 | — | — | ||
| Providing and laying of Apron with cement concrete blocks cast in-situ and made with nominal mix of 1:2:4 with all material , labour, tools and plants. Note: (1) Payment to be made for concrete only; (2) Cement and shuttering to be paid extra. | — | — | — | 1,26,003.5 | |
| — | 25.00 | — | — | ||
| Providing and laying Pitching with Stone Boulders, weighing not less than 35kg each with voids filled with spalls on slopes, laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item). | — | — | — | 38,211.75 | |
| — | 25.00 | — | — | ||
| Providing and laying Filter Material as per RDSO Specifications underneath pitching in slopes complete as per drawing and Technical Specification. | — | — | — | 69,194.75 | |
| — | 2800.00 | — | — | ||
| Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. | — | — | — | 34,17,736 | |
| — | 1700.00 | — | — | ||
| Providing and fixing of Drainage Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete. | — | — | — | 5,75,110 | |
| — | 3425.00 | — | — | ||
| Providing and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines. | — | — | — | 80,68,341 | |
| — | 2.00 | — | — | ||
| Providing cast in situ bridge number plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts. | — | — | — | 1,488.32 | |
| — | 25.00 | — | — | ||
| Providing cast in-situ plaques for bridge foundations details of size 45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm deep notch over abutment & piers, engraving the letters & figures with CM 1:3 and finished smooth including painting letters and figures with 2 coats of black enamel and plaque with white enamel with all labour, tools, cement, paint, curing etc. as a complete job. | — | — | — | 28,705.5 | |
| — | 40.00 | — | — | ||
| Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2 cement and ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately.(Pipes of 600mm dia and above will be laid using crane/hydra). 1000mm dia. | — | — | — | 2,97,907.2 | |
| — | 2.00 | — | — | ||
| Designing and developing Detailed structural and working Drawings for following items for ROB/RUB/Bridge based on Railway's approved GADs, duly collecting necessary data from Railways and R&B authorities, duly designing members and submission of check plot duly getting proof-checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions in drawings/designs, further submission of original in transparent film paper and soft copy (CD) for Railways approval etc. with contractor's technical expertise and instruments, labour, consumables, repeatedly attending till final approval etc., complete as directed by Engineer in-charge. Open / Pile / Well Foundation for piers/abutments | — | — | — | 48,834.72 | |
| — | 2.00 | — | — | ||
| Designing and developing Detailed structural and working Drawings for following items for ROB/RUB/Bridge based on Railway's approved GADs, duly collecting necessary data from Railways and R&B authorities, duly designing members and submission of check plot duly getting proof-checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions in drawings/designs, further submission of original in transparent film paper and soft copy (CD) for Railways approval etc. with contractor's technical expertise and instruments, labour, consumables, repeatedly attending till final approval etc., complete as directed by Engineer in-charge. RCC Bed Block | — | — | — | 15,185.6 | |
| — | 150.00 | — | — | ||
| — | — | — | 1,60,251 | ||
| — | 1880.00 | — | — | ||
| Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | — | — | — | 11,39,449.2 | |
| — | — | — | 7,95,88,110.59 | ||
| EARTH WORK // General // Earth work by mechanical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift. // All kinds of soil | — | — | — | 69,55,303.5 | |
| — | 2400.00 | — | — | ||
| EARTH WORK // General // Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift: // All kinds of soil | — | — | — | 4,03,716 | |
| — | 5900.00 | — | — | ||
| EARTH WORK // General // Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in- charge. // All kinds of soil | — | — | — | 8,90,162.5 | |
| EARTH WORK // General // Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | — | — | — | 4,30,848 | |
| — | 3000.00 | — | — | ||
| FINISHING // EXTERIOR FINISHING // Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. // On concrete work | — | — | — | 5,99,632.5 | |
| — | 630.00 | — | — | ||
| DISMANTLING AND DEMOLISHING // General // Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. // Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | — | — | — | 13,03,540.88 | |
| — | 30.00 | — | — | ||
| DISMANTLING AND DEMOLISHING // General // Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | — | — | — | 90,556.88 | |
| — | 30.00 | — | — | ||
| DISMANTLING AND DEMOLISHING // General // Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. // In cement mortar | — | — | — | 52,535.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
IRGCC-2022-uptoACS-11updated-13.03.20262.pdf
ATTACHMENT
RevisedlistofApprovedBrands-2026.pdf
ATTACHMENT
Agt_format_for_JV_withACS-3_GCC-2022..pdf
ATTACHMENT
TSSpecialConditionsGeneralwithIRGCC-2022.pdf
ATTACHMENT
PROFORMA_for_BIDCAPACITYcorrected22.08.2022_2.pdf
ATTACHMENT
PublicProcurementPolicy19.07.2024.pdf
ATTACHMENT
AFFIDAVIT_ANNEXURE-Vwith_ACS-4_GCC-2022.pdf
ATTACHMENT
NEFT_FORM_GCC_2022.pdf
ATTACHMENT
MOUFormatforJVfirms_1.pdf
ATTACHMENT
SpecialConditions-Measurementofworksbycontractor28.08.21-Ver-1.pdf
ATTACHMENT
FormatforBankGuarantee11.10.2019ver-2.pdf
ATTACHMENT
DETAILSOFPERSONNEL,PLANTANDMACHINERYWORKSONHANDFORMATS.pdf
ATTACHMENT
EMPLOYMNTOFRETIREDRAILWAYOFFICERSCERTIFICATEFORMAT.pdf
ATTACHMENT
SpecialConditionsTechnical-Br.No.90A-LCNo.21.pdf
ATTACHMENT
BridgePolicyletterdt.06.10.2025regFabricationSupplyandInspectionofSteelGirdersandBearings.pdf
ATTACHMENT
ScheduleofBiddingProcess-Br.No.90A_5.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .