| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.7 LAdmitted-Finance 407 4TH FLOOR FORTUNE SQUARE MOROD MAPUSA GOA | MAPUSA | GOA | +2.99% | ₹20.7 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 L+₹20,325.95 (0.98%)Admitted-Finance MALBHAT HEIGHT NO 18 1ST FLOOR PAJIFOND NEAR SBI BANK MARGAO GOA 403601 | MARGAO | SOUTH GOA | GOA | 403601 | +4.00% | ₹20.9 L+₹20,325.95 (0.98%) | L2 | Admitted-Finance |
Tender Value
₹20.1 L
EMD Value
₹40,250
Closing Date
17 Aug 2026, 3:00 pmClosed
Executive Director
1st Floor, Atal Stadium, Cujira, St Cruz
Renovation and Repair works at Ambelim Sports Complex, Ambelim-Goa
2026_TSAG_30880_1
SAG/EEED/TECH/F08/26-27/1335_4
Open Tender
Miscellaneous Works
Percentage
Ambelim
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹40,250
2 Sept 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m All kind of soil | 9 | cum | 291 | ₹2,619 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 2 | cu.m | 2,211 | ₹4,422 |
| 3 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level | 4 | cu.m | 6,635 | ₹26,540 |
| 4 | Manufacture, Supply and Installation (including accessories as mentioned below) of EPEE or equivalent Goan make FRP (Fiber Reinforced Polymer) door shutter of specified thickness as per options below by using tray system with seasoned hard wood, moisture less than 17%, wood styles for Top rail and lock rails. FRP (Fiber Reinforced Polymer) laminate made up of 450 grams per sq.mts (gsm) chop strand matt and unsaturated polyester resin with viscosity range of 400/450 centipoises per second (cps) . The core of shutter will be filled as specified (Expanded Polystyrene Foam / Polyurethane Foam (EPS/PU) Foam). The shutter to be of single colour & water proof as well as mild acid / alkali resistant manufactured using RV TIFAC (R V Engineering College, Bangalore & Technology Information Forecasting & Assessment Council) technology in line with IS 13034 1990 test Standard in an ISO 9001 – 2015 certified factory. | 22 | sq.m | 3,279 | ₹72,138 |
| 5 | Manufacture, Supply and Installation (with anchor fastener) of EPEE or equivalent Goan make FRP (Fiber Reinforced Polymer) Frame of cross section as per options below with right angle joint and FRP (Fiber Reinforced Polymer) laminate made from 450 grams per sq.mts (gsm) chop strand glass fiber (matt) and unsaturated polyester resin with viscosity range of 400/450 centipoises per second (cps). The core of frame would be filled with seasoned wood as infill material. The slot of frame for door resting will be of suitable width so as to take specified thickness door.. The frame will be water proof as well as mild acid/ alkali resistant manufactured in an ISO 9001- 2015 certified company. | 60 | Metre | 739 | ₹44,340 |
| 6 | 12mm cement plaster 1:3 (1 cement : 3 fine sand) | 44 | sq.m | 223 | ₹9,812 |
| 7 | 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge. | 205.13 | sq.m | 329 | ₹67,487.77 |
| 8 | Applying priming coat with ready mixed primer of approved brand and manufacture on wood work complete. | 11 | sq.m | 58 | ₹638 |
| 9 | Applying priming coat with ready mixed primer of approved brand and manufacture on steel work. | 2,015 | sq.m | 51 | ₹1,02,765 |
| 10 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. | 2,015 | sq.m | 107 | ₹2,15,605 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tendernotice_2.pdf
PDF • 1.39 MB
BOQ_31282.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .