Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-AOC WZ 409 0 B 1ST FLOOR PLOT NO 12 JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | L1 | Accepted-AOC BEING L1 AMONG BONAFIDE BIDS | |
| 2 | L2₹45.6 L+₹1.6 L (3.66%)Rejected-Finance | L2 | Rejected-Finance REJECTED BEING L2 AMONG BONAFIDE BIDS | |
| 3 | L3₹45.8 L+₹1.8 L (4.03%)Rejected-Finance WZ 109 PLOT NO 327 CHAND NAGAR NEW DELHI | L3 | Rejected-Finance REJECTED BEING L3 AMONG BONAFIDE BIDS | |
| 4 | L4₹47.8 L+₹3.8 L (8.65%)Rejected-Finance | L4 | Rejected-Finance REJECTED BEING L4 AMONG BONAFIDE BIDS | |
| 5 | Rejected-Technical | - | Rejected-Technical REJECTED AS NOT ENLISTED IN (d) (iv) CATEGORY |
Tender Value
Refer Docs
EMD Value
₹92,000
Closing Date
26 Nov 2020, 6:00 pmClosed
GE AF SUBROTO PARK
GE AF SUBROTO PARK DELHI CANTT - 110010
AMC OF AUTOMATION OF WATER SUPPLY SYSTEM WORKS IN THE AREA OF AGE EM II UNDER GE AF SUBROTO PARK
2020_MES_376566_2
GE/SP/TOKEN-32/2020-2021
Open Tender
Information Technology
Item Rate
330 days
GE AF SUBROTO PARK DELHI CANTT
AS PER TENDER
7 documents required · 7 mandatory
₹500
GE AF SUBROTO PARK
₹92,000
Yes
22 Feb 2021
13 Nov 2020
27 Nov 2020
13 Nov 2020
26 Nov 2020
20 Nov 2020
14 Nov 2020 - 18 Nov 2020
Amount
Maintenance and Servicing of PLC based control panels with its all connected accessories excluding spares parts but including regular maintenance and repair of the Automatic water supply system, installed at various location at Subroto Park including monitoring of main controlling system (Master Panel at Main Pump House) and attending the sites complaints breakdown of system like pump house electric supply , water supply related problem and carrying out maintenance and repair work as per site requirement with rectification of the complaint with in the time period complete and including operating and testing all type of equipments related to water suppy system installed under GE (AF) Subroto Park area complete as per following mentioned installations to the entire satisfaction of the Engineer-in-charge complete all as specified & as directed by Engineer-in-Charge.
Equipments:- (i) PLC based Master Control Panel installed at Main Pump House, Subroto Park. (ii) PLC based Slave Control Panel installed at 2 Lakh Gallon & 50k Gallon OHTs, Subroto Park. (iii) PLC based Slave Control Panel installed at 2 Lakh Gallan OHT, Subroto Park. (iv) PLC based Slave Control Panel installed at Palam P/H, Subroto Park. (v) PLC based Slave Control Panel installed at Sabzi Mandi P/H Subroto Park. (vi) PLC based Slave Control Panel installed at Fire Fighting P/H, Subroto Park.
All as per item No.1 above but for following mentioned installations complete all as specified & as directed by Engineer-in-Charge
Equipments:- (i) PLC based Master Control Panel installed at MAP-II Pump House (Subroto Park). (ii) PLC based Slave Control Panel installed at WO Block (Subroto Park). (iii) PLC based Slave Control Panel installed at OR Block (Subroto Park). (iv) PLC based Slave Control Panel installed at Officer's Block (SPE area Subroto Park).
Notes for item No 1 & 2 above:- (a) New parts if any required for repairs and replacement shall be measured and paid separately under BOQ item Nos 9 to 73 (b) Unit rate quoted by tenderer includes checking of system fortnightly and necessary monitoring,servicing, repair, maintance the systematicaly. (c) Specific emergency complaints from time to time shall be attended Immediately after receiving the same. (d) The scope of work includes the charges required for minor repairing, and carrying out electrical connection, termination and fixing and installing, testing, commissioning, etc and all as specified and directed by EIC (e) The work has to be carried out through authorisied OEM or through the authorized service provider of the OEM or any other agency dealing with the installation and maintenance of SCADA / Automation systems and have vast experience i.e. (i) Should have completed one similar work of value minimum 80% of estimated cost as mentioned in NIT in last five years. OR
(ii) Should have completed two similar works of value minimum 50% of estimated cost as mentioned in NIT in last five years. OR (iii) Should have completed three similar works of value minimum 40% of estimated cost as mentioned in NIT in last five years. (iv) "Similar work means the work of installation of SCADA system or repair and maintenance of SCADA system". (f) A copy of MOU with OEM/Service provider of the OEM/agency dealing with SCADA/automation systems alongwith proof of similar work completed is required to be uploaded with the tender bid (g) The labour element required for maintenance, servicing, repair of automatic water supply system and various locations installed at subroto park and replacement of defective parts with new parts and making the system operational including all necessary testing is included in the rate quoted for this item.
Maintenance & Servicing of Pressure Switches (25 Nos) by disconnecting electrical connection, dismantling, cleaning, refixing and re-connecting with Teflon tape , installation, commissioning and testing to ensure the equipment is runnig properly and smoothly complete all as specified & as directed by Engineer-in-Charge.
All as per item No. 3 above but for magnetic float switch sensors (145 Nos) complete all as specified & as directed by Engineer-in-Charge.
All as per item No.3 above but for Solenoid Valves (44 Nos) complete all as specified & as directed by Engineer-in-Charge.
All as per item No.3 above but for electrical actuator suitable for line size 200mm dia (11 Nos), 150mm dia (43 Nos), 100mm dia (09 Nos) and 50/80mm dia (26 Nos) complete including oiling & greasing all as specified & as directed by Engineer-in-Charge.
Maintaining the communication part, and establishing communication as required, including cost of communication for eleven months including monitoring and control of the Pump House through individual PLC based slave Panels and overall control through PLC based Master Panel complete all as specified & as directed by Engineer-in-Charge.
NOTE FOR ITEM NO 3 TO 7 : - (a) The work has to be carried out through OEM or through the authorized service provide of the OEM or any other agency dealing with the installation and maintenance of SCADA / Automation systems and have vast experience i.e. (i) Should have completed one similar work of value minimum 80% of estimated cost as mentioned in NIT in last five years. OR (ii) Should have completed two similar works of value minimum 50% of estimated cost as mentioned in NIT in last five years. OR (iii) Should have completed three similar works of value minimum 40% of estimated cost as mentioned in NIT in last five years. (iv) "Similar work means the work of installation of SCADA system or repair and maintenance of SCADA system". (b) New parts/ accessories required for maintenance & servicing of Pressure switches, Magnetic float switch censors solenoid vavles electrical actuater communication system shall be measured and paid separately under BOQ item Nos 9 to 73
(c) Unit rate quoted by tenderer includes checking of system fortnightly and necessary monitoring,servicing, repair, maintance the systematicaly. (d) Specific emergency complaints from time to time shall be attended Immediately after receiving the same. (e) The scope of work includes the charges required for minor repairing, and carrying out electrical connection, termination and fixing and installing, testing, commissioning, etc and all as specified and directed by EIC (f) A copy of MOU with OEM/Service provider of the OEM/agency dealing with SCADA/automation systems alongwith proof of similar work completed is required to be uploaded with the tender bid (g) The labour element required for maintenance, servicing, repair of automatic water supply system and various locations installed at subroto park and replacement of defective parts with new parts and making the system operational including all necessary testing is included in the rate quoted for this item. (h) Panel recovery of Rs 500.00 per complaint per day for not attending complaints within 24 hours after receiving the complaint.
Supply, Installation, testing and Commissioning in replacement of 100 mm dia, single phase, Motor Actuated Butterfly valve with disc material of CI with nylon coating, hand wheel for manual operation and having 02 nos. limit switches for Open / Close condition and valve position indicator. In built Serial / USB communication Port, In built data logger with memory, In built SD Card, In built bluetooth transceiver with capability of pairing with any android based smart phone to download logged data, including mounting direct on valve type complete all as specified & as directed by Engineer-in-Charge. . Make : RITE TORK / ROTORK/ HASEL/ HOFENER / EMTORK / CASTLE / UNIVERSAL SWITCH GEAR CONTROL / RAPID / MAI
Supply only for replacement of PLC (Programmable Logic Controller) comprissing of main controller, MMI with display, input / output and consist of following specifications complete all as specified and as directed by Engr-in-Charge : (a) MMI with 2line LCD display and 15 sealed membrane keys, expansion adaptors, input / output modules / communication ports : 3 Nos (b) Power Supply : 24 Volt DC / Permissible range : 20.4 V DC to 28.8 V DC with less than 10% ripple / digital input : 22 pnp (source) or npn (sink) / digital outout : 16 pnp (source) / I/O (c) Module Capacity : 8 / Operating Temperature : 0 deg to 50 deg / storage temperature : -20 deg to 60 deg / environment protection : IP 20. Make : Mitsubishi / Unitronics / Universal Switch Gear Control
Internal rewiring using 0.5 sqmm multistranded) single core for PLC based slave control panel as per requirement complete all as specified & as directed by Engineer-in-Charge. Make : Polycab / Havells / Finolex
Supply only for replacement Single Phase Preventor complete all as specified and as directed by Engineer-in-Charge. Make : Model No. VSP - D2 OF MINILEC or equivelent of SIEMENS / L & T
Supply only for replacement Relay with base 240V AC complete all as specified and as directed by Engineer-in-Charge. Make : IDEC / SIEMENS / L&T
Supply only for replacement Relay with base 240V DC complete all as specified and as directed by Engineer-in-Charge. Make : IDEC / SIEMENS / L&T
Supply only for replacement Healthy Lamp complete all as specified and as directed by Engineer-in-Charge. Make : ESBEE (L&T) / SIEMENS / PHILIPS / TELEMECANIQUE
Supply only for replacement 5 Relay water level controller complete all as specified and as directed by Engineer-in-Charge. Make : MAI /UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement 10 Relay water level controller complete all as specified and as directed by Engineer-in-Charge. Make : MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric motor suitable for actuator for 200mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric motor suitable for actuator for 150mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric motor suitable for actuator for 100mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric motor suitable for actuator for 80mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI /UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric gear box suitable for actuator for 200mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric gear box suitable for actuator for 150mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric gear box suitable for actuator for 100mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK / RAPID / MAI /UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement electric gear box suitable for actuator for 80mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge. Make : ROTORK/ RAPID/ MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement butterfly valve of size 80mm dia as per exiting sample/ size complete all as specified and directed by Engineer-in-charge. Make : AUDCO / ADVANCE / CASTLE
Supply only for replacement butterfly valve of size100mm dia as per exiting sample/ size complete all as specified and directed by Engineer-in-charge. Make : AUDCO / ADVANCE / CASTLE
Supply only for replacement butterfly valve of size 150mm dia as per exiting sample/ size complete all as specified and as directed by Engineer-in-charge Make : AUDCO / ADVANCE / CASTLE
Supply only for replacement butterfly valve of size 200mm dia as per exiting sample/ size complete all as specified and as directed by Engineer-in-charge Make : AUDCO / ADVANCE / CASTLE
Supply only for replacement magnetic level sensor complete all as specified and as directed by Engineer-in-Charge. Make : RDS / TECHTROL / CRISTAL / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement SMPS 12V DC 10A / 15A complete all as specified and as directed by Engineer-in-Charge. Make : Telemecanique / NHP / Delta
Supply only for replacement SMPS 24V DC 20 A complete all as specified and as directed by Engineer-in-Charge. Make : Telemecanique / NHP / Delta
Supply only for replacement Pressure Switch 0-10 kg/sqcm complete all as specified and as directed by Engineer-in-Charge. Make : Danfoss / Telemecanique / Delta
Supply only for replacement GPRS Modem complete all as specified and as directed by Engineer-in-Charge. Make : VISIONTEK / MAESTRO / MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement Limit Switch as exists at site for actuator suitabel for 200/150/100/80 mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge.
Supply only for replacement Resistance & Capacitor (as exists) suitable for actuator RT-10 complete all as specified and as directed by Engineer-in-Charge.
Supply only for replacement Hand Wheel for actuator (as exists) suitable for 200/150/100/80 mm dia butterfly valve complete all as specified and as directed by Engineer-in-Charge.
Supply only for replacement Indicator Lamp 24V DC Red/Green complete all as specified and as directed by Engineer-in-Charge. Make : ESBEE (L&T) / Telemecanique / Siemens
Supply only for replacement Indicator Lamp 220V AC Red/Green complete all as specified and as directed by Engineer-in-Charge. Make : ESBEE (L&T) / Telemecanique / Seimens
Supply only for replacement Buzzer complete (as exists) all as specified and as directed by Engineer-in-Charge.
Supply only for replacement LED (sensor) complete (as exists) all as specified and as directed by Engineer-in-Charge.
Supply only for replacement Indicator Lamp (Lamps 220 V) (R,Y,B) complete all as specified and as directed by Engineer-in-Charge. Make : ESBEE (L&T) / Telemecanique / Siemens
Supply only for replacement 10mm dia Brass / SS direct acting / Diaphragm type pilot operated solenoid valve complete all as specified and as directed by Engineer-in-Charge. Make : AVCON / ASCO / CASTLE / AUDCO
Supply only for replacement 20mm dia Brass / SS direct acting / Diaphragm type pilot operated solenoid valve complete all as specified and as directed by Engineer-in-Charge. Make : AVCON / ASCO / CASTLE / AUDCO
Repair / replacement of 500 GB hdd, 7200 RPM Make WD, Seagate, DELL,HP
Repair / replacement of SMPS 450 watts AC 230V 50Hz 3.5A input - 80mm exhaust fan - 3 pin power cable included Connectors Make DELL, HP, ZEBRONICS
Repair / replacement of Gigabite H-110 MOTHER Board Make : GB,DELL, HP
Repair / replacement of intel core i3 4 Gen processor base frequency 3.50 GHz Bus speed 5GT/s TDP 54W
Repair / replacement of 2.4 Ghz wireless keyboard Make: DELL, HP
Repair / replacement of 2.4 Ghz wireless mouse Make: DELL, HP
Repair / replacement of 18.5" LED Screen AC input voltage/frequency/current: 100 to 240 VAC/50 or 60 Hz + - 3 Hz/1.0 A (typical); 1080 P Make DELL, HP, ZEBRONICS
Repair / replacement of cabinet suitable for operation of USB ports for pc and on/off provision Cabinet Make: DELL, HP, ZEBRONICS
Repair /replacement of DVD write
Repair /replacement window7 /10 with 3 year antivirus softwares Antivirus Make- Quickheal, McAfee
Repair/ replacement of RAM 8GB DDR4 MHZ 12800 Make : SAMSUNG, DELL, HP
Repair /replaement of LAN Port
Repair /replaement of Usb port
Repair /replaement of Serial port
Maintenance,reinstallation,servicing, programming, testing and operationalization of PC based centralized supervisory control and Date Acuqusition system with the following hardware & software for process control, visualization and data acquisition as per specifications and as directed by the Engineer-in-Charge A. Supervisory control and Data Acqustation software of reputed make with unlimited tags license with multilvel password protection, redundancy features etc. B Suitable microsoft operating system for PC including networkserver/client packages C Microsoft office pro with lifetime licence suitable for the PC and scada systems
Repair / replacement of Control Panel with suitable number of inputs / outputs and expansion cards for seamless integration with the existing PLC (Programmable Logic Controller) based Monitoring / Annunciating Control Panel for Automatic Valve Control / Protection suitable for 14 nos. Motorized valves. The scope of work includes modification of the exisiting ladder logic of the Programmable logic Controller to ensure automatic operation of the Motorised valves as per the level of water in OHT/UG Sumps at preset timings as directed by the Engineer in charge.The scope of work also includes integration with existing on Panel with such that the data with respect to the 14 nos valves is to be communicated wirelessly to the Master SCADA at Main pump house at the station. Make: MAI /UNIVERSAL SWITCH GEAR CONTROL/ Conelec /Visiontech
Repair/ replacement of Programmable logic controller & GPRS commuincation based pump automation and protection panel fabricated from 16mm thick CRCA sheet and properly powder coated suitable for control & monitoring of 02 Nos centrifugal pumps,02 Nos pressure transmitters, 02 Ultrasonic level sensor, 02 Nos Primary valves, Air release solenoid valves & 4 nos motorized valves, 5 level sensors (To be installed at Fire Fighting Pump House) complete all as directed. Make: MAI / UNIVERSAL SWITCH GEAR CONTROL / Conelec /Visiontech
Repair / replacement of Ultrasonic Level Transmeter in OHT, range : 0-5 mtrs, accuracy : 0.5%, Supply voltage : 24 V DC, Output 4-20mA, complete all as specified and directed by Engr-in-Charge. Make : P&F/ OMRON/ SICK /UNIVERSAL SWITCH GEAR CONTROL
Repair/ replacement of Programmable logic controller & GPRS commuincation based pump automation and protection panel fabricated from 16mm thick CRCA sheet and properly powder coated suitable for control & monitoring of 05 Ultrasonic level sensor complete all as directed. Make: MAI / UNIVERSAL SWITCH GEAR CONTROL/ Conelec /Visiontech
Repair/ replacement of Modbus "Compact" Bus Coupler for up to 64 Bus Terminals (255 with K-bus extension) complete as directed by Engineer-in-Charge.
Repair/ replacement of 16-channel digital input terminal 24 V DC, filter 3.0 ms, type 3 complete as directed by Engineer-in-Charge.
Repair/ replacement 16-channel digital output terminal 24 V DC, 0.5 A, 1-wire system as directed by Engineer-in-Charge.
Repair/ Replacement, installation, maintenance,servicing, programming, testing and operationalization of ARM/AMI enabled Ultrasonic water flow meter for pipe of size 250mm, Pn16, Class2 , IP68 3.6VDC lithium battery, ISO4064, Rs485 Strong and rugged body for tougher duty, tampered proof,alarm system, smart design using ultrsonic sensing technology, no moving part , LCD ON display with steamless consumption data display. Make : Everest, Global,Kartar/ MAI / UNIVERSAL SWITCH GEAR CONTROL
Supply only for replacement PVC insulated PVC sheathed copper armoured cable of size 1.5 sqmm 6 core laid in trenches / wall / ceiling and roof of OH tanks / OH Pillars etc. complete all as specified and as directed by Engineer-in-Charge. Make : Polycab / Havells / Finolex
Supply only for replacement PVC insulated PVC sheathed copper armoured cable of size 1.5 sqmm 4 core laid in trenches / wall / ceiling and roof of OH tanks / OH Pillars etc. complete all as specified and as directed by Engineer-in-Charge. Make : Polycab / Havells / Finolex
Supply only for replacement PVC insulated PVC sheathed copper armoured cable of size 1.5 sqmm 2 core laid in trenches / wall / ceiling and roof of OH tanks / OH Pillars etc. complete all as specified and as directed by Engineer-in-Charge. Make : Polycab / Havells / Finolex
Supply only for replacement PVC insulated PVC sheathed copper armoured cable of size 0.5 mm 5 pair telephone cable complete all as specified and as directed by Engineer-in-Charge. Make : Polycab / Havells / Finolex
Supply and laying on wall/ground 25 mm dia GI light grade pipe for cable protection complete all as required.
Supply and laying on wall/ground 50 mm dia GI light grade pipe for cable protection complete all as required.
Excavation intrenches not exceeding 1.5M depth and not exc 1.5M wide for laying pipes and getting out in soft soil/loose soil.
Returing, filling in, soil including spreading levelling watering and well ramming in layers not exceeding 25cm
Removing excavated materials not exc 50 mtr depositing where directed at a level not exceeding 1.5mtr above the starting point
Excavating in trenches in hard dense soil not exc. 1.5mtr in width for foundation for laying of pipe etc. and exc. 1.5mtr in depth and getting out complete as all specified and as directed by Engineer-in-charge.
M & L for sand cushioning using fine sand (Jamuna dry and clean sand) for cable protection, in two layers, first layer of 80mm thick before laying of cable and second layer 150mm thick after laying of cable and punned down to 180 mm all as specified in clause No 19.75 of SSR Part I complete all as specified and as directed by Engineer-in-charge.
M&L for laying sub class ‘B’ bricks for cable protection laid perpendicular to direction of the cable over sand cushioning complete all as specified and as directed by Engineer-in-charge. Note for Srl item Nos 9 to 45 of BOQ :- The rate quoted for item No.9 to 67 is for supply only of items mentioned against each. Cost of fixing including necessary tools & plants for items supplied under the above items is deemed to be included in rates quoted for maintenance repairs & servicing of respective Srl item Nos. 1,2,3,4,5,6,7 of BOQ. Tenderers shall take note of this condition while quoting of tender. No extra shall be admissible on this account and the system shall be kept operating & fully functional to the entire satisfaction of Engr-in-Charge. The contractor may visit the site prior to quoting the rate for all items of BOQ to make himself conversant with the scope of repairs involved. No claim whatsoever, will be entrtained at a later stage regarding automation/repairs of items involved to keep the system fully operational through OEM or authorised service provider of OEM.
Supply, Fixing & testing in replacement unserviceable gear driven pop up Pro sport with ABS Riser with 1" inlet and 4" Riser with patented are set degree markings are memory cluth, time proven patenteed reversing mechanisim with rubber cover which seals out dirt and increase product durability and having optical check valve capable of delivering 0.32 to 2.05 LPS with dia of coverage from 27.4 to 45.72m at 2.76 to 6.21 bar complete all as specified and as directed Make-Pro Sport or equivalent.
M&L for Repairs / Replacement of unserviceable UPS as per existing make and model, complete all as specified and as directed by Engineer-in-charge. NOTE: (1) Contractoe may visit site to ascertain the work involved in this item before quoting rate for the same.
Universal Switch Gear Control
Suman Uni Controllers
D P ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .