Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹32.4 L+₹1.3 L (4.20%)Accepted-Finance | L2 | Accepted-Finance L2 Bidder | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not Submitted Original BG of EMD and tender fee receipt paid in Bharathkosh website |
Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
18 Mar 2022, 4:00 pmClosed
Executive Engineer NH Division Mangalore
Office of the Executive Engineer NH Division Urva Store Ashok Nagar Mangalore
FDR 2021-22 Re Construction of damaged CC drain in selected stretches, desilting of existing drain and replacement damaged cover slab over drains from Km 47.00 to Km 50.100 of NH275 in the state of Karnataka Job No.TA.275.KNT.FDR.2021.22.65
2022_MoRTH_678310_1
EE/NHD/MNG/AE1/NIT11/FDR65/01
Open Tender
Civil Works
Item Rate
120 days
Sullia
As per tender document details
4 documents required · 4 mandatory
₹2,000
RO MoRTH
₹63,000
30 May 2022
11 Mar 2022
19 Mar 2022
11 Mar 2022
18 Mar 2022
11 Mar 2022
Amount
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material at specified location in accountable manner including cost of all materials, labour, hire charges of machinary, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the Engineer in charge of work complete. Lime/Cement Concrete - By Mechanical Means Cement Concrete Grade M-15 & M-20
Removal of earth from the choked hill side/other drain and disposing it on the valley side manually including cost of all materials, labour, hire charges of machinary, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the Engineer in charge of work complete.
Providing & laying Plain / Reinforced Cement Concrete M 15 (1:2:4) in Open foundation using granite / trap/basalt aggregates using 20mm and downsize and clean sieved approved fine agrigate or double washed crushed metal sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces, with all incidental charges, etc., complete as per specification and as directed by the Engineer in charge of work complete.
Providing & laying Plain / Reinforced Cement Concrete M 20 in substructure for Abutment / Pier Cap using granite/trap/basalt aggregates using 20mm and downsize and clean sieved approved sand including mixing mechanically in Concrete Mixer laid in layers not exceeding 15cms thick layers, as per Drawing including cost of all materials, formwork, centring, vibrating , compacting, hire charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces,with all incidental charges, etc., complete as per specification and as directed by the Engineer in charge of work complete.
Providing T.M.T. FE-500 Grade Steel bar reinforcement conforming to IS-1786, designation as per table 1000-3 including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tieing, lapping and / or welding wherever required and anchoring to the adjoining members wherever necessary as per drawing (laps, hooks and wastages shall not be measured and paid) including cost of all materials, bar bending charges, hire charges of machinary, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the Engineer in charge of work complete.
Removing and resetting of footpath slab including cost of all materials, labour, hire charges of machinary, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the Engineer in charge of work complete.
Budoli Ummar
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .