Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 CrAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹15.7 Cr+₹8.8 L (0.56%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹15.7 Cr+₹12.8 L (0.82%)Rejected-Finance | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | THOMAS IYADURAI INFRASTRUCTURE PVT LTD L3 | RVS CONSTRUCTIONS L2 | MK DEVELOPER L1 |
|---|---|---|---|---|---|---|
| 1.00CIVIL Works | ||||||
| 2.00Dismantling and Clearing away and carefully stacking materials etc., all complete as directed by departmental officers. | ||||||
| 3.00 | Reinforced Cement Concrete | 27 | Cum | 4,800 ₹1,29,600 | 4,799 ₹1,29,573 | 4,771.67 ₹1,28,835.09 Lowest |
| 4.00 | Brick Masonry in cement mortar walls under 3m high | 62.1 | Cum | 315 ₹19,561.5 | 314 ₹19,499.4 | 312.74 ₹19,421.15 Lowest |
| 5.00 | Providing and constructing cast in situ hydraulic bored piles of 450mm diameter in M30 grade concrete using blended cement - slag cement with minimum cement content of 400kg/m³ in accordance with the structural engineers drawings and directions, but exculding reinforcement including cost of mobalization of all necessary plants, equipment's like piling rigs, temporary casing of appropriate length for setting out cardinal points and the removal of the same, boring in overburden, using bentonite mud circulation technique or any other method duly through all strata upto the foundation level of piles etc., complete all as approved by the departmental engineer. Further include dewatering, placing concrete by tremie pipe method, disposal of bored material outside the site. Including Chipping carefully cut off portion of piles as required without any damage to the piles and dressing the top and removing all the debris away from the site with out any extra cost as directed including the cost of all tools, plants, conveyance, all labour, lead and lift required etc .,Conducting standard penetration test to identify the refusal strata for atleast 1 pile in group and atleast 25% of piles, comparing with refusal strata as indentified in soil report and providing socketting into refusal strata by 1.00mt or into hard rock by 100% dia of the pile. (Length of pile for payment shall be measured up to bottom of pile cap). | 2,940 | RM | 4,800 ₹1,41,12,000 | 3,420 ₹1,00,54,800 Lowest | 4,763.07 ₹1,40,03,425.8 |
| 6.00 | Providing UNDER REAMED PILES R.C.C.30cm (12") dia cast-in-situ with single reamed (bulb) in cement concrete 1:1.5:3, 11.5cm above G.L. including boring, erecting, vibrating,curing, hire charges for drilling equipments, etc.,complete as per relevent ISI specifications(excluding cost steel reinforcement). | 195 | RM | 1,500 ₹2,92,500 Lowest | 1,518 ₹2,96,010 | 1,509.66 ₹2,94,383.7 |
| 7.00Carrying out initial Working pile load test on specified dia piles as specified in IS:2911 (Part 4). Includes all plant, equipment, machinery, instruments, measuring devices, platforms and kentledge pile caps etc., dismantling and carting away entire setup, excavation and dewatering etc., all complete. | ||||||
| 8.00 | Initial Load Test | 2 | No | 2,87,000 ₹5,74,000 | 2,86,275 ₹5,72,550 | 2,84,625 ₹5,69,250 Lowest |
| 9.00 | Dynamic Load test | 1 | No | 2,35,000 ₹2,35,000 | 2,34,225 ₹2,34,225 | 2,32,875 ₹2,32,875 Lowest |
| 10.00 | Earth Work Excavation and deposting on banks with initial lead of 10m and initial lift of 2m in hard stiff clay stiff black cotton soil, hard red earth, shales, muram, gravel, stony earth and earth mixed with small boulders etc., as per SS 20B excluding hard rock requiring blasting etc., complete in all respects complying with relevent standard specifications and as directed by departmental officers. | 1,247.65 | Cum | 300 ₹3,74,295 | 290 ₹3,61,818.5 | 288.77 ₹3,60,283.89 Lowest |
Tender Value
Refer Docs
EMD Value
₹9.1 L
Closing Date
25 Feb 2026, 3:00 pmClosed
Superintending Engineer I
Superintending Engineer-I, CW, CMDA, Koyambedu, Chennai
Construction of community Hall at barracks Road Perambur
2026_CMDAC_663615_1
Tender Notice No.21/2025-26(Community Hall, Perambur)
Open Tender
Civil Works
Lump-sum
240 days
Perambur
Registration of Contractor, Annual Turnover, Similar Work experience, GST Registration, Income Tax Return, Site Visit Certificate
7 documents required · 7 mandatory
₹0
₹9.1 L
Yes
15 May 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL Works | - | - | - | - |
| - | Dismantling and Clearing away and carefully stacking materials etc., all complete as directed by departmental officers. | - | - | - | - |
| - | Reinforced Cement Concrete | 27 | Cum | - | - |
| - | Brick Masonry in cement mortar walls under 3m high | 62.1 | Cum | - | - |
| - | Providing and constructing cast in situ hydraulic bored piles of 450mm diameter in M30 grade concrete using blended cement - slag cement with minimum cement content of 400kg/m³ in accordance with the structural engineers drawings and directions, but exculding reinforcement including cost of mobalization of all necessary plants, equipment's like piling rigs, temporary casing of appropriate length for setting out cardinal points and the removal of the same, boring in overburden, using bentonite mud circulation technique or any other method duly through all strata upto the foundation level of piles etc., complete all as approved by the departmental engineer. Further include dewatering, placing concrete by tremie pipe method, disposal of bored material outside the site. Including Chipping carefully cut off portion of piles as required without any damage to the piles and dressing the top and removing all the debris away from the site with out any extra cost as directed including the cost of all tools, plants, conveyance, all labour, lead and lift required etc .,Conducting standard penetration test to identify the refusal strata for atleast 1 pile in group and atleast 25% of piles, comparing with refusal strata as indentified in soil report and providing socketting into refusal strata by 1.00mt or into hard rock by 100% dia of the pile. (Length of pile for payment shall be measured up to bottom of pile cap). | 2,940 | RM | - | - |
| - | Providing UNDER REAMED PILES R.C.C.30cm (12") dia cast-in-situ with single reamed (bulb) in cement concrete 1:1.5:3, 11.5cm above G.L. including boring, erecting, vibrating,curing, hire charges for drilling equipments, etc.,complete as per relevent ISI specifications(excluding cost steel reinforcement). | 195 | RM | - | - |
| - | Carrying out initial Working pile load test on specified dia piles as specified in IS:2911 (Part 4). Includes all plant, equipment, machinery, instruments, measuring devices, platforms and kentledge pile caps etc., dismantling and carting away entire setup, excavation and dewatering etc., all complete. | - | - | - | - |
| - | Initial Load Test | 2 | No | - | - |
| - | Dynamic Load test | 1 | No | - | - |
| - | Earth Work Excavation and deposting on banks with initial lead of 10m and initial lift of 2m in hard stiff clay stiff black cotton soil, hard red earth, shales, muram, gravel, stony earth and earth mixed with small boulders etc., as per SS 20B excluding hard rock requiring blasting etc., complete in all respects complying with relevent standard specifications and as directed by departmental officers. | 1,247.65 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tender_Document.pdf
Tender Documents • 0.14 MB
Additional_Document.pdf
Additional Documents • 1.57 MB
BOQ_796715.xls
BOQ • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .