| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.9 L
EMD Value
₹31,860
Closing Date
24 Jun 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer, Provincial Division, PWD BandR Br., Palwal
SR by providing Strengthening from RD 0.10 to 1.100 Km and 80mm IPB on Deeghot to Rundhi ID 3462 in Palwal Distt. Re-Tender
2020_HRY_132193_1
Re-Tender/PWD/Palwal/81690/3
Open Tender
Civil Works - Roads
Works
120 days
Palwal
As per Tender Documents
2 documents required · 2 mandatory
₹5,000
Executive Engineer, Provincial Division, PWD BandR
₹31,860
Palwal
2 Dec 2020
17 Jun 2020
25 Jun 2020
17 Jun 2020
24 Jun 2020
17 Jun 2020
17 Jun 2020 - 24 Jun 2020
23 Jun 2020
Amount
Civil Works
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9.Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per hour) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I - The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No
Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm each using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Material to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg per sqm on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No. 503 (5th edition) 2013 as per MoRT&H specification (NS)
Providing & Laying 30mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate rollers to achieve the desired compaction as per clause No. 507 MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision) 2013 using minimum 5.40% to bitumen grade VG-30 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.40% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work..
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirements of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads .the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved the same from Engineer-In-Charge before use.
Dismantling of Existing Brick-on-edging (HSR 8.6(i)
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 400 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS).
Providing and laying 80mm thick ISI marked interlocking paver blocks conforming IS code: 15658:2006/IRC: SP-63-2004 of all shapes and colours in design mix cement M-40 over a bed of 30mm thick fine sand complete in all respect. (HSR 10.159)
Reinforced cement concrete 1:2:4 Kilometer stone of standard design, fixed in position, including finishing including painting- Ordinary Km Stone [HSR 10.129 (ii) + 16.75 (b)(ii)]
Reinforced cement concrete 1:2:4 boundary pillars of standard design, fixed in position, including finishing includingg painting - 200 metre stone [HSR 10.131 + 16.74 (b)
Reinforced cement concrete 1:2:4 village board of standard design, fixed in position, including finishing including painting [HSR 10.131 + 16.74 (b)
Providing and fixing public information board consisting of 75 mm GI pipe of size 2.45 mtr X 1.15 mtr X 900 mm GI sheet 16 gaze connected / welded with 5mm thick steel plate of 50mm duly panted as per column mentioned in the drawing and fixing at sight in 60X 60X75 cm cement concrete 1:2:4 block complete in all respect (NS)
Providing and installing shoulder mounted directional singages of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC:67- 2012 type IV,HIP specification fixed on 3 mm thick Aluninium composite Panels as base board with pressure-Sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos. Mild steel pipe post 80mm NB medium class 4 mm thick embedded in M-20 Grade concrete foundation of size (450 mm X450mm X600mm) /(600 mmX 600mmX600mm) complete as per drawings technical specifications and as directed by Engineer-In-Charge. Size 1200 X 900mm
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Good Bricks @4.5/-Each
Bricks Bats @ 400/-Per Cum
Bituminous mix material @ Rs.1445/-P.Cum. Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .