Loading…
Loading…
Tender Value
₹71.7 L
EMD Value
₹1.4 L
Closing Date
31 Jul 2026, 1:00 pm6d left
Superintending Engineer
Office of The SE 3rd Circle Irrigation Works, Agra
Re-Construction of V.R.B. at Km. 5.355 of Kosi Dy.
2026_UPIDC_1171913_7
07/SE/2026-27
Open Tender
Civil Works
Item Rate
92 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.4 L
Office of The SE 3rd Circle Irrigation Works, Agra
24 Jul 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Cutting or in excavation of foundation in ordinary soil including lead up to 30m and lift up to 1.5m . | 1,359.91 | Cum | - | - |
| - | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | 25.38 | Cum | - | - |
| - | Providing shuttering for C.C. work including rent of shuttering material, labour and T&P required for proper completion of work | 144.2 | Sqm | - | - |
| - | Providing and laying Cement concrete (1:3:6) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete. excluding centering, shuttering and reinforcement. | 75.21 | Cum | - | - |
| - | Providing and laying RCC. (1:1.5:3) with cement, coarse sand and stone grit 10-20 mm including cost of all material, labour and T&P etc.complete. | 288.36 | Cum | - | - |
| - | Providing of steel bars with bending,binding,cutting and placing of reinforcement including cost of wire including all material, labour and T&P etc.complete. | - | MT | - | - |
| - | Centering & shuttering for R.C.C. including cost of centering & shuttering for Bridge Slabs up to 3M span. | 654.48 | Sqm | - | - |
| - | Earth work in Cutting or in Embankment with ordinary soils including lead up to 200 m and lift up to 1.5m including dressing and manual compaction etc.complete. | 346 | Cum | - | - |
| - | Providing and Laying Sand for filter including cost of all material, labour and T&P etc. | 90.26 | Cum | - | - |
| - | Providing & Laying, filling, packing and pitching of cut/split stone 25 to 40 Kg. including carriage from stock yard to site of work including cost of labour, T & P etc. complete | 215.43 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2200520.xls
BOQ • 0.33 MB
Kosi_7.pdf
Tender Documents • 1.60 MB
Technical_7.pdf
Additional Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].