| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹16.9 LAccepted-AOC | ₹16.9 L | 1ST | Accepted-AOC SUCCESSFUL |
| 2 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 3 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 4 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 5 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹17.0 L
EMD Value
₹16,961
Closing Date
18 May 2026, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of paver road and drain from kailash shukla house to birendra choubey house at krishna nagar, ward no.14.
2026_ORULB_128804_1
08/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,961
Yes
30 Jun 2026
8 May 2026
19 May 2026
8 May 2026
18 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | TRANSPORTING OF EXCAVATED EARTH AWAY FROM SITE BY MECHNAICAL MEANS WITH IN 5 KM LEAD | 46.84 | cum | 276.01 | ₹12,928.31 |
| 2 | Dismantling of cement concrete M-15 & M-20 including T&P & scaffolding wherever necessary, sorting the dismentled materials disposal of univerciable materials and stacking the serviceable materials with all lift and lead of 1000 mtrs as per direction of EIC. | 45.07 | cum | 650.1 | ₹29,300.01 |
| 3 | Filling in foundatin and plinth with sand watered and rammed including cost of material with tax | 20.07 | cum | 114.08 | ₹2,289.59 |
| 4 | supply filling sand in foundation and plinth base of road surface including cost of matrials with taxes watering, ramming | 57.86 | cum | 826.11 | ₹47,794.59 |
| 5 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 21.84 | cum | 276.9 | ₹6,047.5 |
| 6 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour ,materials with all taxes,lead ,T & P etc all complete . | 79.14 | cum | 5,805.35 | ₹4,59,435.4 |
| 7 | Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete. | 2 | cum | 7,485.5 | ₹14,971 |
| 8 | R.C.C / Unreinforced C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete but excluding centring , shuttering cost of st | 60.09 | cum | 5,952.45 | ₹3,57,682.72 |
| 9 | rcc work with cutting bending, binding, placingin proper position as per design | 29.15 | qtl | 8,559.51 | ₹2,49,509.72 |
| 10 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials complete in R.C.C. foundation , plinth band , guard wall of lesser height and footings bases of columns mass conc | 505.06 | sqm | 249.2 | ₹1,25,860.95 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589979.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_589979.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .