| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | ₹14.5 L | L1 | Accepted-AOC LOWEST AMOUNT BIDDER |
| 2 | L2₹14.6 L+₹17,153.36 (1.19%)Rejected-AOC MANESAR GURUGRAM HARYANA 122051 | MANESAR | GURUGRAM | HARYANA | 122051 | ₹14.6 L+₹17,153.36 (1.19%) | L2 | Rejected-AOC HIGHER AMOUNT THAN L-1 |
| 3 | L3₹17.1 L+₹2.7 L (18.5%)Rejected-Finance AGROHA 125047 HISAR | FATEHABAD | HARYANA | 125047 | ₹17.1 L+₹2.7 L (18.5%) | L3 | Rejected-Finance higher rates |
| 4 | L4₹18.9 L+₹4.4 L (30.6%)Rejected-Finance | ₹18.9 L+₹4.4 L (30.6%) | L4 | Rejected-Finance higher rates |
Tender Value
₹15.6 L
EMD Value
₹40,188
Closing Date
12 May 2025, 5:00 pmClosed
AMIT
MD - Gurgaon
REPAIRING, SHIFTING and PAINTING OF BIG SIZE HOARDINGS 20 feet X10 feet DISPLAY AREA OF PUBLIC RELATION DEPARTMENT, HARYANA IN NUH DISTRICT
2025_HRY_442178_1
2025AADD1365 8E26 487D 80A7 6D49900999D22256BAR
Open Tender
Machineries/ Mechanical Engg Items
Works
90 days
F. P. Zhirka Nuh Punhana Taoru
2 documents required · 2 mandatory
₹1,000
Yes
₹40,188
Yes
2 Jun 2025
28 Apr 2025
13 May 2025
28 Apr 2025
12 May 2025
28 Apr 2025
Amount
[1.PM115] PM115. Crane 10 tonne capacity [Rate]
[11.73.1]Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 1. On steel work [Through Rate]
[13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate]
[13.32]Providing and fixing bolts including nuts and washers complete. [Through Rate]
[13.45]Welding by gas or electric plant including transportation of plant at site etc. complete. [Through Rate]
[15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.1. Manual Means Depth up to 3 m [Through Rate]
[2.B0979] B0979. MS plates, angles, channels etc. i/c fabrication [Rate]
[2.RM171] RM171. Anchor bolts(25 mm) and nuts for foundation and for fixing plate with truss @ 2% of pipe weight [Rate]
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate]
[6.34.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
THE SHRI SHYAM SARANAM CO-OP L&C SOCIETY LIMITED MANESAR (BID ID -1258815)
M/S SANWARIYA CONSTRUCTION (BID ID -1259332)
Brijmohan Sharma Contractor (BID ID -1259103)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .