| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L4₹58.1 L+₹10.4 L (15.4%)Accepted-AOC | L4 | Accepted-AOC L-1 | |
| 2 | L1₹67.7 LRejected-Finance | L1 | Rejected-Finance L3 | |
| 3 | L2₹67.7 L+₹8,693 (0.13%)Rejected-Finance 11 E 379 11 PUL PEHLL 110044 | SOUTH EAST DELHI | DELHI | 110044 | L2 | Rejected-Finance L2 | |
| 4 | L3₹72.5 L+₹4.8 L (7.09%)Rejected-Finance | L3 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | Ved pal L3 | KAUSHIK DIESEL GENERATOR L1 | INDER JEET CONTRACTOR L2 | THE BHUSHAN COOP L&C SOCIETY LTD L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Deduction of old Bamboos, Ballies, Patera, polythene etc. NOTE:- The malba will be shifted by the agency (with any lead at his own level at suitable place and the NOC from the Department like MCF, NGT etc. will be taken by the agency at his own level. The whole responsibility will be owned by the agency (like any mis-happening during handling of thatch etc.) complete in all respect. | 1 | Job | 1,500 ₹1,500 Lowest | 75,000 ₹75,000 | 10,00,000 ₹10,00,000 | 1,00,000 ₹1,00,000 |
| 2.00 | Plumber 4 Nos.for 30 days (for repair and maintenance of wash rooms in mela area during mela time) | 120 | Per day | 700 ₹84,000 | 600 ₹72,000 Lowest | 720 ₹86,400 | 700 ₹84,000 |
| 3.00 | Carpenter 2 Nos. for 30 Days for barricading and other wood work repair complete in all respect. | 60 | Per day | 700 ₹42,000 | 600 ₹36,000 Lowest | 720 ₹43,200 | 700 ₹42,000 |
| 4.00 | Carpenter Helper 2 Nos. for 30 days for barricading and other wood work repair complete in all respect. | 60 | Per day | 700 ₹42,000 | 500 ₹30,000 Lowest | 540 ₹32,400 | 700 ₹42,000 |
| 5.00 | Helper 4 Nos. during mela for 30 Days for repair and maintenance of all civil, barricading, washroom and other allied works, repair work and for emergent nature work complete in all respect. | 120 | Per day | 700 ₹84,000 | 500 ₹60,000 Lowest | 540 ₹64,800 | 700 ₹84,000 |
| 6.00 | Mason 4 Nos. for 30 days (for repair and maintenance of wash rooms in mela area during mela time) complete in all respect. | 120 | Per day | 700 ₹84,000 | 550 ₹66,000 Lowest | 720 ₹86,400 | 700 ₹84,000 |
| 7.00 | Mason Helper 4 Nos. for 30 days (for repair and maintenance of wash rooms in mela area during mela time) complete in all respect. | 120 | Per day | 700 ₹84,000 | 500 ₹60,000 Lowest | 540 ₹64,800 | 700 ₹84,000 |
| 8.00 | Plumber Helper 4 Nos. for 30 days (for repair and maintenance of wash rooms in mela area during mela time) complete in all respect. | 120 | Per day | 700 ₹84,000 | 500 ₹60,000 Lowest | 540 ₹64,800 | 700 ₹84,000 |
| 9.00 | Supply of 12`-0` long ballies of 3` to 4` diameter (solid), in good condition, complete in all respects as per specifications and as directed by the Engineer-in-Charge. | 500 | Each | 300 ₹1,50,000 | 349 ₹1,74,500 | 360 ₹1,80,000 | 150 ₹75,000 Lowest |
| 10.00 | Supply of heavy weight bamboo with root, 2` to 2.5` diameter (solid), 15`-0` long, in good condition,complete in all respects as per specifications and as directed by the Engineer-in-Charge. | 1,000 | Each | 80 ₹80,000 Lowest | 116 ₹1,16,000 | 180 ₹1,80,000 | 80 ₹80,000 Lowest |
Tender Value
₹81.4 L
EMD Value
₹1.6 L
Closing Date
6 Nov 2025, 5:00 pmClosed
Satish Kumar
Executive Engineer Office (Faridabad)
Estimate for Surajkund International Crafts Mela 2026 Repair and Maintenance of huts and other allied works
2025_HBC_480267_1
202501E7ABCE 5480 48D6 8191 EE83BE30858E1270HTC
Open Tender
Civil Works
Works
45 days
Faridabad (MC)
2 documents required · 2 mandatory
₹5,900
₹1.6 L
Yes
1 Dec 2025
29 Oct 2025
7 Nov 2025
29 Oct 2025
6 Nov 2025
29 Oct 2025
Amount
Deduction of old Bamboos, Ballies, Patera, polythene etc. NOTE:- The malba will be shifted by the agency (with any lead at his own level at suitable place and the NOC from the Department like MCF, NGT etc. will be taken by the agency at his own level. The whole responsibility will be owned by the agency (like any mis-happening during handling of thatch etc.) complete in all respect.
Plumber 4 Nos.for 30 days (for repair and maintenance of wash rooms in mela area during mela time)
Carpenter 2 Nos. for 30 Days for barricading and other wood work repair complete in all respect.
Carpenter Helper 2 Nos. for 30 days for barricading and other wood work repair complete in all respect.
Helper 4 Nos. during mela for 30 Days for repair and maintenance of all civil, barricading, washroom and other allied works, repair work and for emergent nature work complete in all respect.
Mason 4 Nos. for 30 days (for repair and maintenance of wash rooms in mela area during mela time) complete in all respect.
Mason Helper 4 Nos. for 30 days (for repair and maintenance of wash rooms in mela area during mela time) complete in all respect.
Plumber Helper 4 Nos. for 30 days (for repair and maintenance of wash rooms in mela area during mela time) complete in all respect.
Supply of 12`-0` long ballies of 3` to 4` diameter (solid), in good condition, complete in all respects as per specifications and as directed by the Engineer-in-Charge.
Supply of heavy weight bamboo with root, 2` to 2.5` diameter (solid), 15`-0` long, in good condition,complete in all respects as per specifications and as directed by the Engineer-in-Charge.
Making of new thatch huts where RCC column already exists at site Repair of wooden structure and change defective Bamboos 2` to 2½` and Ballies 3` to 4` , repair of Polythene, Patera (2x7’x5’) , Pullah (6’’ dia 6’ long), Nails of various sizes (1 ½’’ to 6’’ long), Ban (Moonjwala), Labour for thatching, labour for making skelton including, bamboos, loading, unloading of new thatch into tractor trolley at the site wherever required i/c cost of tractor trolley (tractor trolley includes fuel, driver etc.) and proper cleaning of the area comp. in all respect as per entire satisfaction of Engineer-incharge ( N.S)
Making of new thatch with ballies as column including Safeda ballies-3’’-4’’(12’ long), 3’’-4’’(18’ long), Heavy weight bamboos 2 `-2 ½ ‘’ dia (12’ long), 2’’-2 ½ ‘’ (15’ long), Polythene, Patera (2x7’x5’) , Pullah (6’’ dia 6’ long), Nails of various sizes (1 ½’’ to 6’’ long), Ban (Moonjwala), CC 1:1 ½:3 for grouting for ballies Labour for thatching, labour for making skelton, loading, unloading of new thatch into tractor trolley at the site wherever required i/c cost of tractor trolley (tractor trolley includes fuel, driver etc.) and proper cleaning of the area including earth work in excavation, brick work, Mud Plaster, painting on ballies and earth filling comp. in all respect as per entire satisfaction of Engineer-in-charge
Supply of nail 1.5` to 6` long complete in all respects as per specifications and as directed by the Engineer-in-Charge.
Mud plaster12mm thick. with gobri leeping on floors including all materials (HSR no.15.54)
Mud plaster 12mm thick with gobri leeping on wall including all materials.
Bidder Name
Amount
Ved pal (GSTN-NA) BID ID -1362073
KAUSHIK DIESEL GENERATOR (GSTN-07AKQPK1017P1ZS) BID ID -1363174
INDER JEET CONTRACTOR (GSTN-NA) BID ID -1362140
THE BHUSHAN COOP L&C SOCIETY LTD (GSTN-NA) BID ID -1363439
KAUSHIK DIESEL GENERATOR (BID ID -1363174)
THE BHUSHAN COOP L&C SOCIETY LTD (BID ID -1363439)
INDER JEET CONTRACTOR (BID ID -1362140)
INDER JEET CONTRACTOR (BID ID -1362140)
Ved pal (BID ID -1362073)
THE BHUSHAN COOP L&C SOCIETY LTD (BID ID -1363439)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_558244.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .