Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
22 Jul 2021, 3:00 pmClosed
PR & CC
This tender is prepared for the finalization of PO for TT Parking area revamping work. Scope of the job
21000035-HD-11750
21000035-HD-11750
Open Tender
Rajnandgaon, Chhattisgarh
₹0
Exempted
22 Jul 2021
2 Jul 2021
22 Jul 2021
22 Jul 2021
2 Jul 2021 - 13 Jul 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | TREE CUTTING 200 TO 600 MM 11845-Irumpanam Terminal | TREE CUTTING 200 TO 600 MM 11845-Irumpanam Terminal — TREE CUTTING BY MECHANICAL SAW AND THEIR DISPOSAL AS PER DIRECTION OF OFFICER-IN-CHARGE SCOPE INCLUDES PROVIDING ALL MATERIALS & CONSUMABLES, EQUIPMENT’S , TOOLS, TACKLES, MANPOWER, SUPERVISION, AS PER DIRECTION OF OWNER. | - | Each |
| 2 | SITE CLEARANCE | SITE CLEARANCE — Surface dressing of the ground including removing small plants, bushes ,vegetation (dia less than 4") and making surface levelled and disposal of rubbish outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge. | - | Square Meters |
| 3 | DISMANTLING RCC | DISMANTLING RCC — Dismantling of RCC roof, beam, column including carting away debris | - | Cubic Meters |
| 4 | DIS. OF BRICK MASONARY | DIS. OF BRICK MASONARY — Dismantling of brick masonry/PCC /RR masonry including carting away debris | - | Cubic Meters |
| 5 | REMOVAL OF ST. STEEL | REMOVAL OF ST. STEEL — Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc complete as directed by EIC. This works includes Dismantling and stacking in specified/Designated HPCL Scrap Yard within the Premises or as directed by EIC. | - | Metric Ton |
| 6 | EXCAVATION IN EARTH UPTO | EXCAVATION IN EARTH UPTO — Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | Cubic Meters |
| 7 | EXCAVATION - 1.5 TO 3 M | EXCAVATION - 1.5 TO 3 M — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH UPTO 3 M | - | Cubic Meters |
| 8 | EARTH FILLING | EARTH FILLING — Supplying and filling imported earth of approved quality in layers not exceeding compacted thickness of 200mm incl. Watering ,ramming, compacting, and if required, rolling and re-rolling with power roller , mechanical compactors of 80KN- 100 KN capacity to achieve maximum compaction, all complete as per direction of Engg.-In- Charge. The earth should be free from weeds, grass and other objectionable debris. Black Cotton soil shouldn't be used. Measurement basis compacted thickness only. Rate shall include conducting compaction test as per tech spec. | - | Cubic Meters |
| 9 | PCC 1:4:8 | PCC 1:4:8 — Providing and laying PCC 1:4:8 using 40 mm and down size graded stone aggregates including machine mixing, providing formwork if required, placing, compacting by hand ramming , curing etc complete. | - | Cubic Meters |
| 10 | RCC1: 1.5:3 ALL TYPE | RCC1: 1.5:3 ALL TYPE — Providing , mixing and placing REINFORCEMENT CEMENT CONCRET 1:1.5:3 mix using 20 mm and down size graded crushed aggregate including providing and fixing necessary plywood /steel shuttering , scaffolding, bracing, machine mixing, compacting by vibrators, curing, hacking the surface to receive plaster etc. complete. Rate shall be exclusive of the cost of steel reinforcement, which will be paid under a separate item. Concrete conforming to relevant specifications of IS 456 - Latest Edn. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000035-HD-11750.pdf
TENDER_DOCUMENT • 16.65 MB
Download all tender documents and submit your bid