Executive Engineer
Office of the Executive Engineer Electric Division Vijaypur
Rate Contract for Supply, Erection/Creation, Testing , Commissioning of 25 KVA, 63 KVA, 100 KVA, 250 KVA transformer substation under the jurisdiction of Executive Engineer, Distribution, Electric Division Vijaypur JPDCL Jammu
2021_PDD_138161_1
EDV/28 of 2021-22 Dated 07-09-2021
Open Tender
Electrical Works
Turn-key
30 days
Samba District
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Executive Engineer Electric Division Vijaypur
₹20,000
Office of the Executive Engineer at Vijaypur
24 Feb 2022
7 Sept 2021
29 Sept 2021
8 Sept 2021
28 Sept 2021
8 Sept 2021
8 Sept 2021 - 28 Sept 2021
17 Sept 2021
Amount
Scope of works for creation, Testing & commissioning of 25 KVA Distribution transformer sub station
Supply, Installation & commissioning of 11/0.433 KV, 25 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Transportation, Erection of 9 Mtr Long ST Pole (STP-410 SP-33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200A
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Providing & Fixing of 50 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type
Providing & Fixing of Distribution Box for 25 kVA DTRwith MCCB for incomer & SFU's for OutgoingCircuits
Providing of Earthing of substation --Excavation of earth pit ofdia 650 mm & depth 3000 mm, installation ofEarthing pipe of 40 mm Nominal bore & 4mm wallthickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm forconnection of transformer body,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts,refilled with earth enhancement materialsand earth Chamber made of brick masonary withRCC slab cover.
Cement bottoming 1:2:4 mix as per REC standards0.5cum/pole
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm
Providing & Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positiveand 80kV Negative, creepage distance 320mm
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mmdiameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Providing & painting of ST poles with 2 Coats each of Red Oxide& Aluminium paint
Scope of works for creation, Testing & commissioning of 63 KVA Distribution transformer sub station
Supply, Installation & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Transportation, Erection of 9 Mtr Long ST Pole (STP-410 SP-33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200A
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Providing & Fixing of 95 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type
Providing & Fixing of Distribution Box for 63 kVA DTRwith MCCB for incomer & SFU's for OutgoingCircuits
Providing of Earthing of substation --Excavation of earth pit ofdia 650 mm & depth 3000 mm, installation ofEarthing pipe of 40 mm Nominal bore & 4mm wallthickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm forconnection of transformer body,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts,refilled with earth enhancement materialsand earth Chamber made of brick masonary withRCC slab cover.
Cement bottoming 1:2:4 mix as per REC standards0.5cum/pole
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm
Providing & Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positiveand 80kV Negative, creepage distance 320mm
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mmdiameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Providing & painting of ST poles with 2 Coats each of Red Oxide& Aluminium paint
Scope of works for creation, Testing & commissioning of 100KVA Distribution transformer sub station
Supply, Installation testing & commissioning of 11/0.433 KV, 100 KVA 3-Phase Distribution Transformerwith Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) with LV Cable Box having detachable AluminiumGland
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary galvinised Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Supply Installation, Testing & Commissioning of PVC Cable 185 mm² alongwith 12 Nos Al. Thimble of 185 mm²
Supply Installation, Testing & Commissioning of LT Distribution Box for 100kVA DTRwith MCCB for incomer & SFU's for OutgoingCircuits
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
Supply Installation, Testing & Commissioningof 11kV Polymeric composite Pin Insulator 12kV, 5kN,Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm
Supply Installation, Testing & Commissioningof 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positiveand 80kV Negative, creepage distance 320mm
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of PG Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mmdiameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Scope of works for creation, Testing & commissioning of 250 KVA Distribution transformer sub station
Supply, Installation & commissioning of 11/0.433 KV, 250 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Transportation, Erection of 9 Mtr Long ST Pole STP-410SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 KV 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Supply & installation of PVC Cab185 mm² single Core (2 Ckts)1.1kV Grade, PVC Insulated Stranded ConductorFRLS type& Fixing with Al. Thimbles
Providing & Fixing of LT Distribution Box LT Distribution Box for 250kVA DTR with MCCB for incomer & SFU's for OutgoingCircuits
Providing of Earthing of substation --Excavation of earth pit ofdia 650 mm & depth 3000 mm, installation ofEarthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm forconnection of transformer body,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary withRCC slab cover.
Cement bottoming 1:2:4 mix as per REC standards0.5cum/pole
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm
Providing & Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positiveand 80kV Negative, creepage distance 320mm
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mmdiameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Providing & Painting of ST poles with two coats each or Red Oxide & Aluminum Paint
M/S HI TECH ELECTRICALS
SUNIL KUMAR SURI CONTRACTOR
M/S VINAYAK ENGINEERS
ROYAL ENGINEERS AND CONTRACTORS
MAHA SHAKTI ELECTRICAL WORKS
M/S RATHER CONSTRUCTIONS AND TRADERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .