| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.2 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹19.3 L+₹14,694.83 (0.77%)Rejected-Finance GRAM MUDAADIH POST GAJWAH JANPAD BALRAMPUR | SHRAVASTI | UTTAR PRADESH | 271201 | 2 | Rejected-Finance L2 | |
| 3 | 3₹19.6 L+₹47,653.83 (2.49%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹46,360
Closing Date
6 Oct 2023, 5:00 pmClosed
ee saryu nahar khand frist balrampur
ee saryu nahar khand frist balrampur
C work
2023_UPIDC_844047_6
01/EE/2023-24
Open Tender
Civil Works
Item Rate
180 days
ee saryu nahar khand frist balrampur
as per NIT
2 documents required · 2 mandatory
₹854
₹46,360
8 Feb 2024
30 Sept 2023
7 Oct 2023
30 Sept 2023
6 Oct 2023
30 Sept 2023
Amount
Earth work in making bypass/diversion channel; including all lead & lift; all cost of labour, T & P with manual compaction and dressing to profile complete
Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including all cost of material, labour, T & P etc.complete work.
Earth work in digging foundation of masonry work in all type of soil including all lead and lift with disposal of earth as per direction of Engineer in charge.
Laying C.C. M-10 (1:3:6) mix. in foundation with shingle 4.75 to 40 mm size & coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc.required for proper completion of work.
Supply & laying & fixing in position and alignment of 1200mm dia Np-3 hume pipe, as per direction engineer-in-charge including all cost of material, labour, T & P etc, required for proper completion of work.
First class brick work in 1:4 C:M with coarse sand, of F.M. not less then 2.0, including all cost of material, labour, T & P etc. required for proper completion of work.
First class brick work in 1:3 C:M with coarse sand of F.M. not less then 2.0, including all cost of material, labour, T & P etc. required for proper completion of work.
Earth work in back filling in foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. complete with manual compaction of work.
Dewatering with all cost of power & P.O.L . machine, pump, well point systm and operator etc with assembling and dismentling of machine etc. required for proper completion of work.
Laying C.C. M-15 (1:2:4) mix with crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0, including all cost of material, labour T & P etc. required for proper completion of work.
Deep struck pointing in 1:2 C:M with coarse sand F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work.
Earth work in embankment/removing of diversion channel; including all lead & lift; all cost of labour, T & P with manual compaction and dressing to profile complete.
m/s kanihya lal yadav
JAGANNATH TIWARI
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .