Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Finance | -19.02% | ₹10.2 L | L1 | Admitted-Finance |
| 2 | L2₹10.3 L+₹12,841.02 (1.26%)Admitted-Finance | -18.00% | ₹10.3 L+₹12,841.02 (1.26%) | L2 | Admitted-Finance |
| 3 | L3₹11.3 L+₹1.1 L (11.2%)Admitted-Finance | -9.99% | ₹11.3 L+₹1.1 L (11.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Simillar type of work done not submited, clearance certificate not submited, |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Simillar type of work done not submited, clearance certificate not submited, self declaration not submited |
Tender Value
₹12.6 L
EMD Value
₹12,589
Closing Date
14 Aug 2026, 6:00 pmClosed
Add.Chief Executive Officer Z.P.Pune WellaslayRd.C
Z.P.Pune WellaslayRd.Camp pune 01
6. CONSTRUCTION OF INTERNAL CONCRETE ROAD AT JAWALGOAN TAL MULSHI.
2026_RDPUN_1325953_6
ZPPune/North/e-Tender/7/26-27
Open Tender
Civil Works - Roads
Percentage
100 days
Z.P.Pune WellaslayRd.Camp pune 01
As per Tender Notice
10 documents required · 10 mandatory
₹0
₹12,589
2 Sept 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1 | Square Metre | 12 | ₹11.99 |
| 2 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | - | Cubic Metre | 119 | - |
| 3 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | - | Cubic Metre | 1,020.98 | - |
| 4 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | - | Cubic Metre | 119 | - |
| 5 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading or stacking as directed. | - | Cubic Metre | 177 | - |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2) mm Aggregate) | - | Cubic Metre | 2,934.28 | - |
| 7 | Providing and laying in situ cement concrete M -20 with tremix treatment for 200 mm thickness for
Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20
mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( Natural
Sand /VSI grade finely washed crushed sand) etc. complete -- M30 Item Converted to M20 Item. DIfference in Cost
of Cement 0.40 MT - 0.35 MT = 0.05 MT at Rs 6000 is 0.05 x 6000 = Rs 300, hence Final Rate = Basic Rate for M30
Item - Rs 3000 - Rs 126 for NON SCADA i.e. (8446 - 300 - 126 = 8020 Final Rate = 8020.00 | 1 | Cubic Metre | 8,725.5 | ₹8,716.77 |
| 8 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete | - | Cubic Metre | 654.98 | - |
| 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complet | - | Cubic Metre | 79 | - |
| 10 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete | - | Square Metre | 21 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.62 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.63 MB
Tendernotice_5.pdf
PDF • 0.39 MB
Tendernotice_6.pdf
PDF • 0.12 MB
Tendernotice_7.pdf
PDF • 0.36 MB
BOQ_2270831.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .