| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.2 Cr+₹1.8 L (1.60%)Rejected-AOC | ₹1.2 Cr+₹1.8 L (1.60%) | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | SRE THANGAM BUILDERS L1 | SRI ANGALAMMAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00THE REMOVAL AND REFIXING GARBAGIRAHAM AND MANDAPAM CUTSTONE FOR ARULMIGU KULAKKARAI ANJANEYAR THIRUKOVIL, NAMAKKAL NAMAKKAL DISTRICT. | |||||
| 2.00 | Removing/cleaning old paint/oil stain etc., from stone wall/Pavukkal including all labour charges, necessary requisite materials used for Paint removal etc., complete. | 126.25 | Square metre | 42 ₹5,302.5 Lowest | 60 ₹7,575 |
| 3.00 | Removel of Pressed Tiles & Weathering Course Rate for 1 Sqm page no.22 Unique Code W-0037 | 82.65 | Square metre | 45 ₹3,719.25 Lowest | 65 ₹5,372.25 |
| 4.00 | Removel of Brick / Stone Masonry in cement mortar walls under 3m high Rate for 1 Cqm page no.21 Unique Code W-0015 | 13.35 | Square metre | 282 ₹3,764.7 Lowest | 320 ₹4,272 |
| 5.00Labour Charges for Old Stone Removing all Varivargams | |||||
| 6.00 | Labour Charges for Old Stone Removing all Varivargams Rate for 1 Sqm page no.261 Unique Code HR-W0007. | 181 | Square metre | 1,720 ₹3,11,320 Lowest | 1,800 ₹3,25,800 |
| 7.00 | Labour Charges for Old Stone Removing all Varivargams Rate for 1 Sqm page no.261 Unique Code HR-W0008 | 126.25 | Square metre | 5,680 ₹7,17,100 Lowest | 5,800 ₹7,32,250 |
| 8.00 | Earth work excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc., Complete. | 247 | Cubic metre | 220 ₹54,340 Lowest | 260 ₹64,220 |
| 9.00 | Supplying and filling 20 mm & 6 mm guauge HBGS stone jelly and mix with M Sand for dispersion trench including loading conveying and unloading and as directed by the departmental officers etc. complete complying with standard specification | 12 | Cubic metre | 2,020 ₹24,240 Lowest | 2,060 ₹24,720 |
| 10.00 | Cement concrete 1:5:10 mix using 20mm HBG stone metal including cost and conveyance of all materials to site and labour charges including curing etc., complete. | 5 | Cubic metre | 4,690 ₹23,450 Lowest | 4,800 ₹24,000 |
Tender Value
Refer Docs
EMD Value
₹76,500
Closing Date
19 Jun 2025, 12:30 pmClosed
Assistant Commissioner / Executive Officer
ARULMIGU NARASIMMASWAMY TEMPLE NAMAKKAL TOWN AND TALUK NAMAKKAL DISTRICT
THE REMOVAL AND REFIXING GARBAGIRAHAM AND MANDAPAM CUTSTONE FOR ARULMIGU KULAKKARAI ANJANEYAR TEMPLE NAMAKKAL TOWN TALUK AND DISTRICT
2025_HRCE_564193_1
DIPR/2254TENDER/2025
Open Tender
Civil Works
Item Rate
600 days
ARULMIGU KULAKKARAI ANJANEYAR TEMPLE NAMAKKAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹76,500
24 Sept 2025
9 Jun 2025
19 Jun 2025
9 Jun 2025
19 Jun 2025
11 Jun 2025
Amount
THE REMOVAL AND REFIXING GARBAGIRAHAM AND MANDAPAM CUTSTONE FOR ARULMIGU KULAKKARAI ANJANEYAR THIRUKOVIL, NAMAKKAL NAMAKKAL DISTRICT.
Removing/cleaning old paint/oil stain etc., from stone wall/Pavukkal including all labour charges, necessary requisite materials used for Paint removal etc., complete.
Removel of Pressed Tiles & Weathering Course Rate for 1 Sqm page no.22 Unique Code W-0037
Removel of Brick / Stone Masonry in cement mortar walls under 3m high Rate for 1 Cqm page no.21 Unique Code W-0015
Labour Charges for Old Stone Removing all Varivargams
Labour Charges for Old Stone Removing all Varivargams Rate for 1 Sqm page no.261 Unique Code HR-W0007.
Labour Charges for Old Stone Removing all Varivargams Rate for 1 Sqm page no.261 Unique Code HR-W0008
Earth work excavation for foundation in all classes of soils except hard rock requiring blastering with initial lead and lift etc., Complete.
Supplying and filling 20 mm & 6 mm guauge HBGS stone jelly and mix with M Sand for dispersion trench including loading conveying and unloading and as directed by the departmental officers etc. complete complying with standard specification
Cement concrete 1:5:10 mix using 20mm HBG stone metal including cost and conveyance of all materials to site and labour charges including curing etc., complete.
Random Rubble Masonry in cement mortar 1:5 (One Cement and five M.sand) mix with simultaneously pointing using new stones and 10% including necessary provision of bond stones including simultaneous flush pointing with the same mortar etc., complete.
Providing and laying , Standard Concrete Mix - 20 Grade in accordence with IS : 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.55, including admixtrure ( plasticiser / super plasticiser ) in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve stone jelly and with about ( 3.3 cu.m ) 5156 Kg .of 10 - 12 mm machine crushed stone jelly and with about ( 4.79 cu.m. ) 7670 Kg . of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying , vibrating with mechanical vibrators, finishing , curing, etc., and providing fixtures like fan clamps in the RCC floor / roof sabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. THe coarse and fine aggregates to be used should comply with the requirements of IS Stanards. ( No saparate payment will be made by the Department for the excess usage of materials). Upto basement
Centering, shuttering for RCC works by using M.S sheets and angles etc. complete.for strutting charges Centering charges without Strutting charges
Supply of fabrication of steel for reinforcement including all cost of steel, binding wire, labour charge and fabrication.
Refixing, Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc. & Labour charges for dressing cut stone 3 line dressed on all face set in Cement moratr 1:3 (One Cement , Three M - Sand) including handling charges cost of tools and fixing in position etc.,
Supply of cut stone 5' new Ubanam (Chitravanam), Kandam, Pattiyal, Patham (Kalvari), Uthiram, Kabothagam, Viyalavari, Ulvari (Inner course)
Labour charges for dressing and fixing new cut stone Ubanam (Chitravanam)
Labour charges for dressing and fixing new cut stone Kandam
Labour charges for dressing and fixing new cut stone Pattiyal
Old Stone Refixing for @ 30% Ubanam (Chitravanam), Kandam ,Pattiyal,
Labour charges for dressing and fixing new cut stone Patham (Kalvari)
Labour charges for dressing and fixing new cut stone Uthiram
Labour charges for dressing and fixing new cut stone Kabothagam
Labour charges for dressing and fixing new cut stone Viyalavari
Labour charges for dressing and fixing new cut stone Ulvari (Inner course)
Refixing, Supply of cut stone roughly dressed, shaped quality and required size cost and conveyance of size including conveyance and handling charges etc. & Labour charges for dressing cut stone 3 line dressed on all face set in Cement moratr 1:3 (One Cement , Three M - Sand) including handling charges cost of tools and fixing in position etc.,
Supply of cut stone 10' Pillar, Bothiyal, Thani Uthiram, Pavukal (Roof)
Labour charges for dressing and fixing new cut stone Pillar
Labour charges for dressing and fixing new cut stone Bothiyal
Labour charges for dressing and fixing new cut stone Thani Uthiram
Labour charges for dressing and fixing new cut stone Pavukal (Roof)
Old Stone Refixing Patham for @ 30% (Kalvari), Uthiram,Kabothagam,Viyalavari ,Ulvari (Inner Course),Pillar,Bothiyal,Thani Uthiram,Pavukal
Supplying & Paving the floor/steps with cut stone of 60 x 60 x 10cm thick and pointing in LM 1:1.5 including cost and conveyance of all materials, labour charges for dressing and paving and pointing etc., complete
New stone with three line
New stone with single line
Old Stone Refixing charge
Weathering course with concrete broken brick jelly of 20mm using Pollachi Lime guage in pure slacked lime.[No sand tobe used] over roof slab,the properties of brick jelly to lime being 32cft : 12.5cft well beaten with wooden beaters giving rquired slope and thickness of 75mm as directed by the departmental officers etc; complete complying with standard specification
Finishing the top of roof with one course of machine pressed tiles of size 23x23x2cm laid in Cement Mortar 1:3 with water proofing compound with red oxide etc., complete.
Temple Pattern Ornamental Doors with high quality Country Teakwood with 2" Minimum to 7" maximum thick ornamental frames 2" thick to 5" thick Kamala ( Flower Planks ), Creeper, Birds, Animal Figures, Sculpture, etc. Backside 1" thick to 3" plank including necessary carving, shaping, wastage, etc., as per approved plan and drawing
GST Amount for providing Service to Government Contract Works for the above works at 18%(9%+9%). {GST Amount is the Total GST Amount for overall quoted amount}
SRI ANGALAMMAN CONSTRUCTIONS (BID ID -1370591)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_673597.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .