Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | L1 | Accepted-AOC Lowest Successful L1 Bidder. | |
| 2 | L2₹19.4 L+₹4.0 L (26.4%)Rejected-Finance 6 VANARAI SHOPPING COMPLEX W E HIGHWAY GOREGAON E MUMBAI 400065 | MUMBAI SUBURBAN | MAHARASHTRA | 400065 | L2 | Rejected-Finance Unsuccessful Bidder | |
| 3 | L3₹20.0 L+₹4.6 L (30.2%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L3 | Rejected-Finance Unsuccessful Bidder |
Tender Value
₹23.7 L
EMD Value
₹47,475
Closing Date
27 Jul 2022, 2:00 pmClosed
Asstt.General Manager (E-E)
Engineering Electrical Wing, Room No.202/15,Airports Authority of India, ATS Complex, Sutar Pakhadi Road, Andheri (East), Mumbai-400099.
Annual Maintenance Contract of HT installations at ATS Complex and Operational Area, C.S.M.I.Airport, Mumbai for the year 2022-23 to 2023-24.
2022_AAI_122053_1
MUM/ATS/ENGG-E/eNIT-05/2022-23
Open Tender
Electrical Works
Item Rate
731 days
ATS Complex and Operational Area, CSMIA, Mumbai
As per NIT criteria.
5 documents required · 5 mandatory
₹1,120
Yes
₹47,475
Yes
15 Sept 2022
13 Jul 2022
28 Jul 2022
14 Jul 2022
27 Jul 2022
14 Jul 2022
14 Jul 2022 - 26 Jul 2022
Amount
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) a) First year i) Transformer 11KV/ 433Volts, 2 MVA ( Make: Volt Amp)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) a) First year ii) Transformer 3.3KV/ 433Volts, 250 KVA (Make: Nissan)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) a) First year iii) Transformer 3.3KV/ 433Volts, 100 KVA (Make: Nissan)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) a) First year iv) 3.3 KV HT extensible oil switch fuse unit/ Isolator (Make: Mysore Electricals)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) a) First year v) 3.3KV, Oil immersed Ring Main Units of 200 -400 Amps capacity consisting of one incomer and two outgoings. (Make:Mysore Electricals)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) b) Second year i) Transformer 11KV/ 433Volts, 2 MVA ( Make: Volt Amp)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) b) Second year ii) Transformer 3.3KV/ 433Volts, 250 KVA (Make: Nissan)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) b) Second year iii) Transformer 3.3KV/ 433Volts, 100 KVA (Make: Nissan)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) b) Second year iv) 3.3 KV HT extensible oil switch fuse unit/ Isolator (Make:Mysore Electricals)
Filtration and dehydration of oil for the following installations including testing of the Oil for dielectric strength before and after filtration as per IS: Specification and submission of of the report of B.D.V. Test and Chemical analysis of the oil to determine the level of acidity as per IS: Specification and cleaning of breather and providing fresh charges of Silica Gel to the transformers, Supplying and replacing corroded nuts and bolts, gaskets, washers and rectification of leakage of oil complete as required. (Transformers oil for topping up will be supplied by AAI.) b) Second year v) 3.3KV, Oil immersed Ring Main Units of 200 -400 Amps capacity consisting of one incomer and two outgoings. (Make:Mysore Electricals)
Filtration and dehydration of oil for the 11 KV, 1600 Amp. HT MOCB of Eswaran & Sons make including co-ordination with M/s. Adani Electricity for taking shutdown of the supply, disconnecting the control supply, racking out the MOCB, cleaning the bus bar fingers and insulators, racking in the MOCB after filtration and dehydration of the oil, checking leakage of oil if any & rectification including repacing of gaskets, tightining of screws/nut bolts complete as required and connecting the control supply properly and charging the HT panel in co-ordination with M/s. Adani Electricity and testing the supply and controling etc. (Transformer oil for topping up will be supplied by AAI.) a) First year
Filtration and dehydration of oil for the 11 KV, 1600 Amp. HT MOCB of Eswaran & Sons make including co-ordination with M/s. Adani Electricity for taking shutdown of the supply, disconnecting the control supply, racking out the MOCB, cleaning the bus bar fingers and insulators, racking in the MOCB after filtration and dehydration of the oil, checking leakage of oil if any & rectification including repacing of gaskets, tightining of screws/nut bolts complete as required and connecting the control supply properly and charging the HT panel in co-ordination with M/s. Adani Electricity and testing the supply and controling etc. (Transformer oil for topping up will be supplied by AAI.) b) Second year
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- a) First year i) 3200 Amp, 4 Pole, U Power Series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- a) First year ii) 1600 Amp, 4 Pole, U Power series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- a) First year iii) 800 Amp, 4 Pole, C Power Series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- a) First year iv) 1250 Amp, 4 pole, U Power series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- b) Second year i) 3200 Amp, 4 Pole, U Power Series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- b) Second year ii) 1600 Amp, 4 Pole, U Power series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- b) Second year iii) 800 Amp, 4 Pole, C Power Series ACB
Maintenance , Servicing & Overhaling of L&T make Air Circuit Breakers from OEM or authorized service dealer by providing trolley for servicing (preventive maintenance every six months) installed at LT Ess. and Non-Ess. Panels as Main incommers, DG incommers (Substation) and Bus Couplers, DG Syn.Panel and Incoming feeders of AC Panel of the following rating:- b) Second year iv) 1250 Amp, 4 pole, U Power series ACB
AMC of 800 Amp SIEMENS make Vacuum Circuit Breakers from OEM or authorized service dealer(preventive maintenance once a year) installed at ELDIS-II (New RADAR) in operational area, Mumbai airport. a) First year
AMC of 800 Amp SIEMENS make Vacuum Circuit Breakers from OEM or authorized service dealer(preventive maintenance once a year) installed at ELDIS-II (New RADAR) in operational area, Mumbai airport. b) Second year
Visiting charges towards inspecting, checking, taking parameters and rectification of the faults if require for ACB from OEM or authorized service dealer. (Beyond 4 nos. preventive maintenance and 8 nos. breakdown complaints.)
Testing and calibration of Voltage and current operated relays as per Annex -III including secondary injection testing and settings once in a year, submitting test reports etc complete as required. Job includes checking proper co-ordination of relays, testing of tripping, checking all the control systems, checking and testing electrical interlocking, checking of control wiring, tightening of the wiring etc. complete as required. a) First year
Testing and calibration of Voltage and current operated relays as per Annex -III including secondary injection testing and settings once in a year, submitting test reports etc complete as required. Job includes checking proper co-ordination of relays, testing of tripping, checking all the control systems, checking and testing electrical interlocking, checking of control wiring, tightening of the wiring etc. complete as required. b) Second year
Cable fault detection of HT / LT underground power cables of the 1.1 KV grade of any size with the cable fault finding machine complete etc. as required.
Supply of transformer oil of IS: 335/1980 ammended upto date with test report as required.
Repainting of following equipments including scrapping by sand/emery paper to get even surface and applying metal primer on corroded surface and painting with two coat of approved brand synthetic enamel/Aluminum paint including writing etc. complete as required. a) Transformer 11KV/ 433Volts, 2 MVA
Repainting of following equipments including scrapping by sand/emery paper to get even surface and applying metal primer on corroded surface and painting with two coat of approved brand synthetic enamel/Aluminum paint including writing etc. complete as required. b) Transformer 3.3KV/ 433Volts, 250 KVA
Repainting of following equipments including scrapping by sand/emery paper to get even surface and applying metal primer on corroded surface and painting with two coat of approved brand synthetic enamel/Aluminum paint including writing etc. complete as required. c) Transformer 3.3KV/ 433Volts, 100 KVA
Repainting of following equipments including scrapping by sand/emery paper to get even surface and applying metal primer on corroded surface and painting with two coat of approved brand synthetic enamel/Aluminum paint including writing etc. complete as required. d) 3.3 KV, 200/400 Amp Ring Main Units and Isolating switch
SARASWAT ENGINEERING SERVICES
Manish Electricals
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .