| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.3 LAccepted-AOC | ₹24.3 L | 1 | Accepted-AOC WORK ALLOTTED TO ANKIT CONSTRUCTION, CHURCHU, ICHAK, HAZARIBAG AND AGREEMENT DONE |
| 2 | 2₹24.4 LRejected-AOC | ₹24.4 L | 2 | Rejected-AOC WORK ALLOTTED TO ANKIT CONSTRUCTION, CHURCHU, ICHAK, HAZARIBAG AND AGREEMENT DONE |
| 3 | 3₹24.5 LRejected-AOC | ₹24.5 L | 3 | Rejected-AOC WORK ALLOTTED TO ANKIT CONSTRUCTION, CHURCHU, ICHAK, HAZARIBAG AND AGREEMENT DONE |
| 4 | 4₹24.7 LRejected-AOC | ₹24.7 L | 4 | Rejected-AOC WORK ALLOTTED TO ANKIT CONSTRUCTION, CHURCHU, ICHAK, HAZARIBAG AND AGREEMENT DONE |
| 5 | 5₹25.2 LRejected-AOC VILL PO BADAM PS BARKAGAON DISTT HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825311 | ₹25.2 L | 5 | Rejected-AOC WORK ALLOTTED TO ANKIT CONSTRUCTION, CHURCHU, ICHAK, HAZARIBAG AND AGREEMENT DONE |
Tender Value
₹30.7 L
EMD Value
₹61,500
Closing Date
17 Mar 2026, 5:00 pmClosed
E.E., NREP, HAZARIBAG
E.E., NREP, HAZARIBAG
Construction of R C C Drain From New Delhi Public School to Dipugarha Well Culvert in Ward No 05 (Five) Under Municipal Corporation, Hazaribag
2026_NREPH_110979_1
NREP/HAZARIBAG/05/2025 - 26 (GROUP NO. 01)
Open Tender
Civil Works
270 days
HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹61,500
26 May 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
E/W in excavation in foundation trenches in hard soil (vide classification of soil item - A+B ) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundtion trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I B.C.D.S.O.R No 5.1.1
Providing sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all load and lifts including cost of all materials, labours, royelty and taxes all complete as per building specification & direction of E/I B.C.D.S.O.R No 5.1.10
Providing Class 75B brick flat soling joint filled with local sandincluding cost of watering taxes, royelty all complete as per building specification and direction of E/I B.C.D.S.O.R No 5.6.3
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size. B.C.D.S.O.R No 5.3.9.1
Centering and shuttering including strutting, propping etc. and removal of from for - Foundations,footings, bases of columns etc for mass concrete B.C.D.S.O.R No 5.3.17.1
providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL) } B.C.D.S.O.R No 5.5.5 (a)
providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL) } B.C.D.S.O.R No 5.5.5 (b)
Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I.(i) Cement
Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I. (ii) Sand
Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I.(iii) Stone Chips
Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I. (v) Steel
Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I (vi).Bricks
Add G.S.T ( Goods & Service tax ) 18%
Add Labour Cess 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_149967.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_149967.xls
BOQ • 0.39 MB
TENDER_DOCUMENTS_05_01.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid