Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LQualified B 19 AMIT JINDAL B 19 DSIDC ENGINEERING COMPLEX MANGOLPURI INDL AREA PHASE 1 NORTH WEST DELHI DELHI 110083 | NORTH WEST DELHI | DELHI | 110083 | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹11.7 L+₹22,750 (1.98%)Qualified C 210 BHAICHAND TEXTILE MILL LBS MARG BHANDUP WEST MUMBAI MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹11.8 L+₹30,250 (2.63%)Qualified E 109 BULANDSHAHAR ROAD INDUSTRIAL AREA SITE 1 GHAZIABAD MEERUT UTTAR PRADESH 250002 | MEERUT | UTTAR PRADESH | 250002 | L3 | Qualified MSE, MII, Category: General | |
| 4 | L4₹12.4 L+₹87,750 (7.63%)Qualified 160 3 SHOP NO 3 SHYAM SHANTI MARKET AJMERI GATE DELHI DELHI 110006 | NORTH DELHI | DELHI | 110006 | L4 | Qualified MSE, MII, Category: General | |
| 5 | L5₹12.8 L+₹1.3 L (10.9%)Qualified 257 257 AGGARWAL CITY MALL PLOT NO 3 ROAD NO 44 PITAMPURA DELHI NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | L5 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
8 Sept 2025, 2:00 pmClosed
CO2 Based Wheeled Fire Extinguishers (V2) as per IS 16018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6569604 Dated : 21-08-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : The President of India (Acting through Regional Director
P&S) Department of Atomic Energy
Directorate of Purchase And Stores Raja Ramanna Centre for Advanced Technology
Indore-452013 (MP) PG-II/71505 Note- If any bidder opts for submission of demand draft in place of Bank Guarantee then it should be in favour of Pay & Accounts Officer
RRCAT" payable at Indore. (.) Splitting
8221313
GEM/2025/B/6569604
Two Packet Bid
CO2 Based Wheeled Fire Extinguishers (V2) as per IS 16018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
90 days
I 452013, Indore Regional Purchase & Stores Unit (DPS/DAE) Raja Ramana Centre for Advanced Technology P.O. CAT
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
21 Aug 2025
21 Aug 2025
8 Sept 2025
CO2 Based Wheeled Fire Extinguishers (V2) as per IS 16018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6569604 Dated : 21-08-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : The President of India (Acting through Regional Director
P&S) Department of Atomic Energy
Directorate of Purchase And Stores Raja Ramanna Centre for Advanced Technology
Indore-452013 (MP) PG-II/71505 Note- If any bidder opts for submission of demand draft in place of Bank Guarantee then it should be in favour of Pay & Accounts Officer
RRCAT" payable at Indore. (.) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8221313.pdf
GEM_BID
scheme-i-mark-scheme.pdf
OTHER
71486ANXX_1a343331-0d9a-4081-9a4b1755150404440_apotwo.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .