Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹6.7 L+₹1.1 L (19.2%)Rejected-Finance CHANDRA LOK COLONY WARD NO 1 NAVALPURA KHURJA BULANDSHAHR | HATHRAS | UTTAR PRADESH | 203001 | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | NARENDRA KUMAR SHARMA L2 | M/S BHASKAR SHARMA CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 9,200 | Sqm | 4.5 ₹41,400 Lowest | 4.5 ₹41,400 Lowest |
| 2.00 | Silt clearance by hydraulic excavator/JCB including lift upto 1.50M and lead upto 6m, including cost of driver/assistant driver, POL ,maintanance of machine, Contractor profit, taxes including rough/Partial dressing.Complete in all respect as directed by Engineer in Charge. | 7,335 | Cum. | 63 ₹4,62,105 | 50 ₹3,66,750 Lowest |
| 3.00 | Silt clearance by hydraulic excavator/JCB including lift upto 1.50M and lead upto 200 M (Disposal by Power Transportation) including cost of driver/assistant driver, POL ,maintanance of machine, Contractor profit, taxes including rough/Partial dressing.Complete in all respect as directed by Engineer in Charge. | 205 | Cum. | 150 ₹30,750 | 140 ₹28,700 Lowest |
| 4.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Complete in all respect as directed by Engineer in Charge. | 20,094 | Sqm | 5 ₹1,00,470 | 4.5 ₹90,423 Lowest |
| 5.00 | V.R.B. or bridge clearance in Distributaries/Minors as directed by Engineer in Charge. | 14 | Nos | 600 ₹8,400 Lowest | 600 ₹8,400 Lowest |
| 6.00 | Printing Latters upto 10 CM Hight including Material. | 196 | Nos. | 10 ₹1,960 Lowest | 10 ₹1,960 Lowest |
| 7.00 | ainting gauge including cost of Material upto 25 cm. width | 1.2 | Rm. | 20 ₹24 Lowest | 20 ₹24 Lowest |
| 8.00 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 171 | Sqm | 60 ₹10,260 Lowest | 60 ₹10,260 Lowest |
| 9.00 | M-100 class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. | 2 | Cum. | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest |
| 10.00 | 12.50 mm thick Cement plaster with 1:4 Cement course sand mortar. including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. | 15 | Sqm | 200 ₹3,000 Lowest | 200 ₹3,000 Lowest |
Tender Value
₹5.1 L
EMD Value
₹11,000
Closing Date
19 Sept 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
executive engineer
UMBDGC KHURJA
silt clearence work
2026_UPIDC_1185339_22
05/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹11,000
2 Oct 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
19 Sept 2026
14 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 9,200 | Sqm | - | - |
| 2 | Silt clearance by hydraulic excavator/JCB including lift upto 1.50M and lead upto 6m, including cost of driver/assistant driver, POL ,maintanance of machine, Contractor profit, taxes including rough/Partial dressing.Complete in all respect as directed by Engineer in Charge. | 7,335 | Cum. | - | - |
| 3 | Silt clearance by hydraulic excavator/JCB including lift upto 1.50M and lead upto 200 M (Disposal by Power Transportation) including cost of driver/assistant driver, POL ,maintanance of machine, Contractor profit, taxes including rough/Partial dressing.Complete in all respect as directed by Engineer in Charge. | 205 | Cum. | - | - |
| 4 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. Complete in all respect as directed by Engineer in Charge. | 20,094 | Sqm | - | - |
| 5 | V.R.B. or bridge clearance in Distributaries/Minors as directed by Engineer in Charge. | 14 | Nos | - | - |
| 6 | Printing Latters upto 10 CM Hight including Material. | 196 | Nos. | - | - |
| 7 | ainting gauge including cost of Material upto 25 cm. width | 1.2 | Rm. | - | - |
| 8 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 171 | Sqm | - | - |
| 9 | M-100 class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. | 2 | Cum. | - | - |
| 10 | 12.50 mm thick Cement plaster with 1:4 Cement course sand mortar. including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work. | 15 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2230680.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .