Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
2 Jan 2024, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Repairing and complete overhauling of V.C.B., Control Panel, Relay and Testing of T/F installed at 33/11 KV Sub Station under E.U.T.D.-I, Prayagraj
2023_PVVNV_860792_3
31/SE/EUDC-I-Pra/2023-24
Open Tender
Electrical Works
Lump-sum
180 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Yes
Account Number-0012002100504911
₹64,000
Yes
12 Jan 2024
23 Dec 2023
2 Jan 2024
23 Dec 2023
2 Jan 2024
23 Dec 2023
Amount
Following work are to be carried out under the jurisdiction of E.U.T.D.-I, Prayagraj.
Repairing and complete overhauling of 11 KV Schneider Electric/Stelmac/Pascal and other make VCB installed at various 33/11 KV Sub Station. Materials, if required for replacement of damaged parts while repairing, will be provided by the contractor; rate should be given including following material Cost :-
Spout, Nut-Bolt, Washer, Packing, Wires and other rubberized parts.
On-off leaver, Nut-Bolt, Washer, Packing, Wires and other rubberized parts.
Repairing & Overhauling of Relay installed at different 33/11 KV Sub-Stations. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost.
Repairing & Overhauling 33 KV Transformer control panel/Battery charger panel of Control Panel installed at different 33/11 KV Sub-Stations. Any material, if required for replacement of damaged parts, while repairing the same shall have to be provided by the department, except Nut-Bolt, Washer, Packing, Wires and other rubberized parts will be provided by the contractor at his own cost.
Testing and overhauling works.
Complete testing of 33 KV Switchgears Test includes Manual & Auto Tripping of Breaker by primary/secondary injection method, CT Ratio, Lubrication of Tripping Mechanism, Lubrication of Mechanism and minor wiring if required, is also to be done.
Complete testing of 11 KV Switchgears Test includes Manual & Auto Tripping of Breaker by primary/secondary injection method, CT Ratio, Lubrication of Tripping Mechanism and minor wiring if required, is also to be done.
GANGA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .