Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹36,700
Closing Date
28 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
KOLKATA IT DIVISION WRITERS BUILDING
Renewal of Internet Leased Line Connectivity and Allied Infrastructure for The Centralized Internet Service of The State Headquarters Nabanna at 325, Sarat Chatterjee Road, Shibpur, Howrah
2026_WBPWD_5075431_1
WBPWD/EEKIT/E-NIT-190/T/26-27
Open Tender
IT WORKS ORG
Item Rate
Nabanna at 325, Sarat Chatterjee Road, Shibpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹36,700
KOLKATA IT DIVISION WRITERS BUILDING
28 Sept 2026
28 Sept 2026
30 Oct 2026
28 Sept 2026
28 Oct 2026
29 Sept 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Renewal of 2500-MB/s (1:1) Dedicated Internet Leased Line Connectivity (Main Feed) including all accessories and minimum 5 Public IPs.
[Location: IT, P.W.Dte., Server Room, State Headquarters Nabanna, 325, Sarat Chatterjee Road, Shibpur, Howrah - 711 102]
Interface Required: Ethernet Media: Through Single-Mode Optical Fiber Cable (OFC) or RF and which will be Owned by Service Provider]
[DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: < 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] | - | - | - | - |
| 1.02 | One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate / undertaking has to provide.
Minimum Accessories Required to Complete the Installation as per site requirement:
a) Last-mile connectivity should be optical fiber cable only and handshaking will be done by OFC SFP Module only.
Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement and will be considered as one time supply. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery.
[excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network] | - | - | - | - |
| 1.03 | Recurring charges including Internet bandwidth charges, or other configuration and interfacing charges etc for 01(One) Year. | 1 | No | - | - |
| 2.01 | Renewal of 10-GBps (1:1) Dedicated Point to Point Leased Line Connectivity (Main Feed) including all accessories.
[Point-A Location: IT, P.W.Dte., Server Room, State Headquarters Nabanna, 325, Sarat Chatterjee Road, Shibpur, Howrah - 711 102]
[Point-B Location: P.W.Dte. IT Data Center, at Ground Floor, Main Block, Writers Building, Kolkata - 700 001]
Interface Required: Ethernet Media: Through Single-Mode Optical Fiber Cable (OFC) or RF and which will be Owned by Service Provider]
[DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: < 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] | - | - | - | - |
| 2.02 | One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate / undertaking has to provide.
Accessories Required as per site requirement:
a) a) Last-mile connectivity should be optical fiber cable only and handshaking will be done by OFC SFP Module only.
Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement and will be considered as one time supply. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery.
[excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network] | - | - | - | - |
| 2.03 | Recurring charges including Internet bandwidth charges, or other configuration and interfacing charges etc for 01(One) Year. | 1 | No | - | - |
| 3 | ADD GST @18% | 1 | No | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
BOQ_5165288.xls
BOQ • 0.32 MB
2911Form.pdf
Additional Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .