Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
27 Jul 2026, 12:00 pmClosed
CE MeDA
CE Office MeDA Campus, Meerut
Recycling and reuse of treated water from the Shatabdinagar STP to the Mohkampur Industrial Area in Meerut district.
2026_MDAUP_1163924_1
35153_38 Dated 22 June 2026
Open Tender
Civil Works
Percentage
365 days
Meerut
Tender Fee, EMD and other documents as per the Tender/NIT
2 documents required · 2 mandatory
₹5,700
As per the Tender/NIT
₹9.8 L
28 Jul 2026
25 Jun 2026
28 Jul 2026
27 Jun 2026
27 Jul 2026
10 Jul 2026
27 Jun 2026 - 9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | - | - | - |
| 2 | Take 15 No. Holding Tank | 15 | Nos | 88,420.46 | ₹13,26,306.9 |
| 3 | RCC WATER TANK | - | - | - | - |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 411.13 | Cum | 128.85 | ₹52,974.1 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-ill) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) | 9.9 | Cum | 4,944.8 | ₹48,953.52 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for : | - | - | - | - |
| 7 | Foundations, footings, bases for columns | 8.32 | Sqm | 284.66 | ₹2,368.37 |
| 8 | Columns, piers, abutments, pillars, posts and struts | - | - | - | - |
| 9 | GROUND FLOOR COLUMN | 332.8 | Sqm | 697.8 | ₹2,32,227.84 |
| 10 | Suspended floors, roofs, landings, balconies and access platform | - | - | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_2182167.xls
BOQ • 0.27 MB
35153EBIDS.pdf
Tender Documents • 1.31 MB
35153Corrigendum.pdf
PDF • 0.19 MB
35153Corrigendum.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .