| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 CrAccepted-Finance | ₹14.7 Cr | L1 | Accepted-Finance Among the Two bidders, the lowest rate quoted by Ms.A.M. ASSOCIATES |
| 2 | L2₹15.0 CrRejected-Finance | ₹15.0 Cr | L2 | Rejected-Finance Among the Two bidders, the highest rate quoted by Win Sudharsan Constructions |
| 3 | Rejected-Technical NO 30 PERIYAR NAGAR ERODE 638001 | ERODE | TAMIL NADU | 638001 | - | - | Rejected-Technical as per 94thTAC recommendations on 07.01.2025 |
| Sl No | Description | Qty | Unit | Win Sudharsan Constructions L2 | A.M. ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle etc, complete complying with standard specifications and as directed by the departmental officers | 45,000 | m2 | 6.5 ₹2.9 L | 7.24 ₹3.3 L |
| 2.00 | Earthwork in all soils except medium rock / hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching,formation of bunds,breaking clods and sectioning etc.,complete complying with standard specifications and as directed by the departmental officers. | 5,000 | m3 | 62 ₹3.1 L | 60 ₹3 L |
| 3.00 | Dismantling and clearing away for any thickness of wall complete complying with standard specification and as directed by the departmental officers..plain cement concrete . | 30 | m3 | 520 ₹15,600 | 510 ₹15,300 |
| 4.00 | Dismantling and clearing away for any thickness of wall complete complying with standard specification and as directed by the departmental officers..Reinforce cement concrete | 22 | m3 | 4,800 ₹1.1 L | 4,500 ₹99,000 |
| 5.00 | Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead 6 Km by deploying earth moving machineries and tippers including benching formation of bunds, breaking clods, ramming, sectioning with extra watering and consolidation by power roller and including hire charges etc. complete complying with standard specifications and as directed by the departmental officers | 1,77,800 | m3 | 190 ₹3.4 Cr | 205.15 ₹3.6 Cr |
| 6.00 | Earth Work Excavation for foundation in all soils and sub soils to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers.
(Open excavation) | 10,225 | m3 | 140 ₹14.3 L | 120 ₹12.3 L |
| 7.00 | Earth Work Excavation for foundation in all soils and sub soils to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers.
(Narrow excavation) | 365 | m3 | 254 ₹92,710 | 220 ₹80,300 |
| 8.00Providing and placing in position of plain cement concrete M10 grade using sand graded hard blue granite broken stone jelly of 40 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers | |||||
| 8.01 | For works upto 1.50m depth below ground level and upto 1.00m height above ground level | 205 | m3 | 5,400 ₹11.1 L | 5,000 ₹10.3 L |
| 8.02 | For works above 1.50m to 4.50m below ground level | 105 | m3 | 5,620 ₹5.9 L | 4,900 ₹5.1 L |
Tender Value
₹14.6 Cr
EMD Value
₹7.4 L
Closing Date
23 Dec 2025, 12:00 pmClosed
superintending engineer,
o/o superintending engineer,vellar basin circle,c
Construction of Inlets and Improvements to Right Bank of Pennaiyar river at Pagandai and Melpattampakkam villages in Panruti taluk of Cuddalore district.
2025_WRD_629487_1
shortterm/08/VBC/5.12.2025
Open Tender
Civil Works
270 days
panruti
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹7.4 L
9 Jan 2026
7 Dec 2025
23 Dec 2025
7 Dec 2025
23 Dec 2025
7 Dec 2025
Amount
Clearing scrub jungle etc, complete complying with standard specifications and as directed by the departmental officers
Earthwork in all soils except medium rock / hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching,formation of bunds,breaking clods and sectioning etc.,complete complying with standard specifications and as directed by the departmental officers.
Dismantling and clearing away for any thickness of wall complete complying with standard specification and as directed by the departmental officers..plain cement concrete .
Dismantling and clearing away for any thickness of wall complete complying with standard specification and as directed by the departmental officers..Reinforce cement concrete
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead 6 Km by deploying earth moving machineries and tippers including benching formation of bunds, breaking clods, ramming, sectioning with extra watering and consolidation by power roller and including hire charges etc. complete complying with standard specifications and as directed by the departmental officers
Earth Work Excavation for foundation in all soils and sub soils to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers. (Open excavation)
Earth Work Excavation for foundation in all soils and sub soils to full depth as may be directed by the Departmental Officers except hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated soil in layers not exceeding 15 cm thick, well rammed and consolidated and depositing including all initial leads and initial lifts, etc., complete complying with standard specifications and as directed by the departmental officers. (Narrow excavation)
Providing and placing in position of plain cement concrete M10 grade using sand graded hard blue granite broken stone jelly of 40 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers
For works upto 1.50m depth below ground level and upto 1.00m height above ground level
For works above 1.50m to 4.50m below ground level
For works above 4.50m to 9.00m below ground level
Providing and placing in position of plain cement concrete M 20 grade using sand graded hard blue granite broken stone jelly of 60% of 40 mm size and 40% of 20 mm size mixing with mixer machine and laying in layers oincluding the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers
For works above 1.50m to 4.50m below ground level
For works upto 1.50m depth below ground level and upto 1.00m height above ground level
For works above 1.00m to 4.50m height above ground level
For works above 4.50m to 9.00m height above ground level
Providing and placing in position of plain cement concrete M 15 using sand hard blue granite broken stone jelly of size 20 mm mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers
For works above 1.50m to 4.50m below ground level
For works upto 1.50m depth below ground level and upto 1.00m height above ground level
For works above 1.00m to 4.50m height above ground level
For works above 4.50m to 9.00m height above ground level
Supplying and laying of ready mix for M 25 grade of concrete having charaterstic strength not less than specified in the IS 456 - 2000 using Ordinary portland cement with minimum cement content of 300 Kg / cum confirming to IS 8112. Coarse aggregates having a specific gravity of 2.60 using 20 mm down graded hard blue granite broken stone jelly and fine aggregate without flyash as per IS 383 - 1970 ( 2007 ) with suitable water cement ratio not less than 0.45 and not exceeding 0.50 of water quality confirming to IS 456 - 2000 including use of plasticizer of approved make & dosage of required grade at all locations and levels with specified high workability as per IS 1199 - 1959 ( 2004 ). The initial & final setting time confirming IS 12269 - 1987 ( 2004 ) with maximum temperature of concrete at the time of placing should not exceed 32 0 C. The admixtures affecting the quality and strength of the concrete should not be used and should confirm IS 9103 - 1979 [ usual admixture - Air entraining & water reducing ]. including the cost of hire charges for pump and pumping charges to the required locations & levels as specified by the Engineer - in - charge,. laying, compacting, consolidation by using vibrators, finishing, watering, curing, testing charges as per IS 456 - 2000, 4031 - ( Part 3 & 6 ) / 1988 ( 2005 ) & ( Part 2 ) / 1999 ( 2004 ) and 516 / 1959 ( 2004 ), 4926 - 1976 ( 1990 ), mix design details to be got approved before commencement of the work adopting pour card system and other OK cards. Excluding the cost of form works, centering and shuttering placed in position etc, complete complying with standard specifications and as directed by the departmental officers. (RCC work)
Providing launching apron using new jeddy stone of size not less than 300 mm thick and weight not less than 40 Kg including the cost of new wedges for filling the gaps, finishing etc complete complying with standard specifications and as directed by the departmental officers
Supplying and spreading sand gravel mix ratio of 30:70 for 10 cm thick over the top of bund and other places as required at site of work including watering and consolidation using power roller, etc, complete complying with standard specifications and as directed by the departmental officers
Supplying and erecting centering for vertical plain / RCC concrete walls of supply channel, retaining wall etc for following height with necessary supports, all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25 mm x 3 mm for bearing laid silver Oak / Country wood joist of size 7.50 cm x 5.0 cm spaced @ about 90 cm C / C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C / C, etc., complete complying with standard specifications and as directed by the departmental officers
Vertical centering- Upto 0.90 M Height
Upto 1.80 M Height
Upto 2.70/3.00 M Height
3.00 to 4.00 M Height
4.00 to 5.00 M Height
5.00 to 6.00 M Height
6.00 to 7.00 M Height
7.00 to 8.00 M Height
Supplying and erecting centering for sides and soffits and strutting follows height for plane surfaces such as RCC works etc, with all cross bracing with mild steel size of 90 cm x 60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x 25 mm x 3 mm for bearing laid silver Oak / Country wood joist of size 10 cm x 6.5 cm spaced @ about 90 cm C / C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C / C, and removing the same without any damages etc., complete complying with standard specifications and as directed by the departmental officers
Supplying, fabricating and placing in position of Mild Steel or Ribbed Tor Steel for all RCC works as per design & drawing given including cost of steel, binding wire and labour charges for cutting, bending, laying in position and tying with binding wire, etc. complete complying with standard specifications and as directed by the departmental officers
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete
Supplying and laying porous concrete plugs of 1:4 mix ( one cement and four jelly ) using hard blue granite broken stone jelly of size 20 mm for 10 cm dia, 30 cm long including mixing, laying, finishing, curing, etc., complete complying with standard specifications and as directed by the departmental officers
Dewatering using 7.5 HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
Providing and placing in position of wheep holes for retaining wall using 110 mm dia / 4Kg PVC pipe heavy duty (PVC) including cost of all metrails, labour charges etc complete complying with standard specifications and as directed by the departmental officers.
Fabricating, Supplying and erection of Screw gearing steel shutters of size of width 2.30m x 1.50m height consist of skin plate made out of 10mm thick mild steel plate and horizontally stiffened with 150x75mm ISMB 150 at an interval not more than 0.50m and vertical stiffeners made out of 100x50mm mild steel channel ISMC at an interval not more than 0.60m and provided with 10mm thick mild steel gusset plateof required size on both sides fastened with rust free bolts and nuts etc.Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipments Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipments. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipments required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc..complete.
Fabricating, Supplying and fixing of Top Beam made up of 200x100mm (ISMB 200) duly drilled to suit the Head Set Assembly with required bed bolt made out of 25mm mild steel round rod duly threaded with suitable anchorage arrangements to a height of 0.60m with necessary Fish plate made out of 16mm mild steel plate of size 0.20x 0.30m 2 Nos with required holes. Conveying and leading the top beam arrangements to the work site. Fixing the top beam arrangements at the top of the vent in correct position including dismantling the existing eroded top beam, conveying and stacking and the section stores. The top beam should be painted with two coats of AC black paint over one coat of Red Oxide primer. The Rate including cost of materials, labours, charges for all fabricating and hoisting equipments, cost of petty civil works conveyance charges for labours and materials and warranty for 5 years etc.., complete.
Fabricating, supplying and fixing of 80mm dia Screw Rod made up of Mild Steel duly machined and fully threaded to suit the Head set Assembly and provided with required holes. Conveying and leading the screw rod to the worksite. Fixing the screw rod to the shutter gusset plate with required bolt and nut in proper alignment to the head set including dismantling the existing damaged screw rod, conveying and stacking at section store. The Screw rod should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for all fabricating and hoisting equipments, conveyance charges for labours and materials and warranty for 5 years etc., complete
Fabricating, supplying and fixing of Shutter Groove Angle made up of 100x100x10mm Mild Steel angle for required height including welding hold fast of size 40x40x6mm Mild steel angle 3 Nos on both sides and conveying and leading the groove angle to the vents. Fixing the angle to the grooves in proper alignment including dismantling the existing damaged groove angles, conveying and stacking at section store. The groove angle should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, consumables, labours, charges for all fabricating and hoisting equipments, conveyance, petty civil works and warranty for 5 years etc., complete.
Supplying and fixing of Head Set Assembly Heavy duty with hexagonal nut (Approximate 120 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assembly to the work site. Fixing the head set assembly to the top beam by using required rust free bolts and nuts in proper alignment including dismantling the existing damaged Head set assembly, conveying and stacking at section Store. The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc, complete.
GST 18 % in Figures
Win Sudharsan Constructions (BID ID -1542459)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
pqpagandai.pdf
Tender Documents • 0.54 MB
pttpagandai.pdf
Tender Documents • 4.22 MB
BOQ_752849.xls
BOQ • 0.28 MB