| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹41.8 LAccepted-AOC RZ 212F D BLOCK RAJ NAGAR PART II PALAM COLONY NEW DELHI 110077 | SOUTH WEST | DELHI | 110077 | 1 | Accepted-AOC ACCEPTED BEING L1 | |
| 2 | 2₹4.5 L−₹37.9 L (89.3%)Rejected-Finance | 2 | Rejected-Finance Rejected being not L1 | |
| 3 | 3₹45.5 L+₹3.1 L (7.31%)Rejected-Finance WZ 1000 NANGAL RAYA PANKHA ROAD SOUTH WEST DELHI DELHI 110046 | DELHI | SOUTH WEST DELHI | DELHI | 110046 | 3 | Rejected-Finance Rejected being not L1 | |
| 4 | Rejected-Technical RZ 382 3RD FLOOR GALI NO 11B KAILASH PURI EXTN PALAM COLONY PALAM VILLAGE NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | - | Rejected-Technical Not recommended as per Note 1 of NIT. | |
| 5 | Rejected-Technical RZ 40 PALAM VIHAR DWARKA SECTOR 6 NEW DELHI 75 | NEW DELHI | DELHI | 75 | - | Rejected-Technical Not recommended as per Note 1 of NIT. |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
27 Sept 2024, 6:00 pmClosed
GE UTILITY ELEC SUPPLY
GE UTILITY ELEC SUPPLY DELHI CANTT
PERIODICAL MAINTANANCE AND SERVICING 03 PHASE ONLINE UPS OF 120 KVA 05 NOS PDU 02 NOS AND ISOLATION TRANSFORMER03 NOS WITH CONNECTED ACESSORIES ALONG WITH DISTRIBUTION LT PANELS CABLES OF DIPAC AND NEW CHITRA LINE AND ASSOCIATED AREA OF AGE U
2024_MES_672267_1
GE ELEC/D-32/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
GE UTILITY ELEC SUPPLY
AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹500
GE UTILITY ELEC SUPPLY
₹94,000
Yes
2 Nov 2024
5 Sept 2024
28 Sept 2024
5 Sept 2024
27 Sept 2024
19 Sept 2024
Amount
Preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 3 Nos of Make: vertiv / emerson Model liebert APM comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS System along with Isolation transformers of 150 KVA and Disrtubution LT Panell / Parallel operation of the UPS along with 12V ,40Nos 150 AH Battery Bank , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities for keeps the UPS in good working order to prevent failures complete all as specified and directed by Engr-in-charge. (a) Perform visual checks and operational tests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output (c) Complete a functional checkout and test ( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmision checking of all components and Acessories of complete UPS sysyetm for signs of overheating, swelling, leaking, etc..along with Visually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded. (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc. (h) Perform system and component functional tests on UPS equipment to insure proper functioning within specified parameters. (l) Run all UPS system diagnostics, and correct all diagnosed problems. (m) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (n) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (o) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the UPS subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition.
(p) Off-line load test the UPS system to ensure that the system is completely functional. (q) Restoring of the UPS to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the UPS equipment or shutdown will occur because of inrush currents. (r). Contractor Shall be reponsible for 100% working of the UPS and its associated acessories for period of 40 Days after carring out the scheduled maintance. If Any Break down Malfunction of the UPS occurs it will be rectified by the Contractor free of cost through the authorised OEM in a sipulated period of 12 hrs, failing so to restore the UPS shall recover an amount of 25000/- per every 12 Hrs. NOTES:- (i) The contractor shall maintain the UPS as per Shedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the UPS and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period. (iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER nad Eng-in Charge for each UPS separately before submitting the RAR (vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vii) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online UPS (viii). The spares provided shall be of IEC standard. (ix) Due to continuous working of the Administrative building and continious running plant, servicing and testing of UPS can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work
All as peritem No-1 here in before but preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 2 Nos of Make: vertiv / emerson Model liebert SX 120 comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS System along with Isolation transformers and Disrtubution LT Panell / Parallel operation o the UPS along with 9 AH, 12 Volt 600 No's Battery Bank/ UPS , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working order to prevent failures complete all as specified and directed by Engr-in-charge
Preventive maintenance of microprocessor based online PDU of 2 Nos and isolation transformer 3 Nos of Make: vertiv / emerson THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) PDU using PWM IGBT technology 3 phase input and 3 phase 400 v output IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working order to prevent failures complete all as specified and directed by Engr-in-charge:- (a) Perform visual checks and operational tests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output. (c) Complete a functional checkout and test ( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmision checking of all components and Acessories of complete PDU sysyetm for signs of overheating, swelling, leaking, etc..along with Visually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded . (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc. (h) Perform system and component functional tests on PDU equipment to insure proper functioning within specified parameters. (j) Run all PDU system diagnostics, and correct all diagnosed problems. (k) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (l) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (m) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the PDU subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition. (n) Off-line load test the PDU system to ensure that the system is completely functional. (o) Restoring of the PDU to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the PDU equipment or shutdown will occur because of inrush currents. (p) Contractor Shall be reponsible for 100% working of the PDU Notes :- (i) The contractor shall maintain the PDU as per Schedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the PDU and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period.
(h) Perform system and component functional tests on PDU equipment to insure proper functioning within specified parameters. (j) Run all PDU system diagnostics, and correct all diagnosed problems. (k) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (l) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (m) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the PDU subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition. (n) Off-line load test the PDU system to ensure that the system is completely functional. (o) Restoring of the PDU to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the PDU equipment or shutdown will occur because of inrush currents. (p) Contractor Shall be reponsible for 100% working of the PDU Notes :- (i) The contractor shall maintain the PDU as per Schedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the PDU and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period. (iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER and Eng-in Charge for each PDU separately before submitting the Wok done.(vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vi) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online PDU (viii) The spares provided shall be of IEC standard. (ix) Due to continuous working of the Administrative building and continuous running plant, servicing and testing of PDU can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work Notes For Sr Item No 01 to 03:- (i) The Tenderers will have to submit MOU as given in format on Srl page no 107 & 108 of Tender from Authorised Service center / OEM of UPS only and copy of the agreement will be submitted/uploaded with the technical documents in cover 1. Any bid not uploaded along with MOU shall deemed to be dis-qualified/not eligible for financial bid opening. (ii) Contractor will conclude AMC with OEM and copy of the agreement will be submitted to GE.
Excavation in trenches not exc. 1.5 m wide and not exc 1.5 m deep in soft/loose soil) for laying of cables or GI pipe and getting out including levelling of bottom suface to required level complete all as specified and directed by Engr-in-Charge.
Material and labour for river washed and screened, dry sand for filling in trenches below and around underground cables and in substation ducts for cushioning of cables etc, complete all as specified and directed by Engr-in-Charge. Note : Measurement should be after punning down
S&F sub class B bricks having minimum compressive strength 75 Kg/ Sq cm laid in trenches for cable protection etc complete all as specified and directed by Engr-in-Charge.
All as per Srl Item No.6 above but laying only old bricks complete all as specified and directed by Engr-in-Charge.
Returning filling in, including spreading, levelling, watering and well ramming soil in layers not exceeding 25 cm thick complete all as specified and directed by Engr-in-Charge.
Removing excavated material (ie soil) from site to a distance n. exc 50 m away and depositing where directed at a level n. exc. 1.5 m above the starting point complete all as specified and directed by Engr-in-Charge.
Demolition of PCC as in road/path/concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed by Engr-in-Charge.
M&L for Cement Concrete type B-2 mix, 1:2:4 (using 40mm graded aggregate) 150mm thick incl finishing the top surfaces fair and even without using extra cement complete all as specified and directed by Engr-in-charge.
Boring of hole under road/pavement/hard standing or any other situation by mannual means and suitable for passing of GI pipe 40 to 100 mm bore and making good both ends complete all as specified and directed by Engr-in-Charge.
Supply and lay in replacement 100mm bore dia GI pipe light grade as in cable protection laid in trench/floor, fixed on pole/wall etc complete all as specified and directed by Engr-in-Charge.
All as per item No 13.00 above but of size 80 mm dia complete all as specified and directed by Engr-in-Charge.
All as per item No 13.0 above but of size 50 mm dia complete all as specified and directed by Engr-in-Charge.
All as per item No 13.0 above but of size 40 mm dia complete all as specified and directed by Engr-in-Charge.
Supply, laying, jointing, testing and commissioning in replacement of LT underground cables of size 25 Sqmm 4 core, 1100 volts grade, PVC insulated XLPE and PVC sheathed, heavy duty armoured, with multistranded aluminium conductors, IS-7098, Part-II marked, laid in trenches/ duct/ under road/ footpath/ etc or against re-routing/diversion from residential buildings/road/ footpath etc complete all as specified and directed by Engr In Charge.
All as per srl item No 17.0 here-in-before but of size 35 Sqmm 4 core complete all as specified and directed by Engr-in-Charge.
All as per srl item No 17.0 here-in-before but of size 50 Sq mm 3.5 core complete all as specified and directed by Engr-in-Charge.
All as per srl item No 17.0 here-in-before but of size 70 Sq mm 3.5 core complete all as specified and directed by Engr-in-Charge.
All as per srl item No 17.0 here-in-before but of size 95 Sqmm 3.5 core complete all as specified and directed by Engr-in-Charge.
All as per srl item No 17.0 here-in-before but of size 185 Sqmm 3.5 core complete all as specified and directed by Engr-in-Charge.
All as per srl item No 17.0 here-in-before but of size 240 Sqmm 3.5 core complete all as specified and directed by Engr-in-Charge.
Supply, fixing and testing straight through joint heat shrinkable type with jointing kit suitable for cable PVC/XLPE insulated armoured heavy duty aluminium conductor 1100 Volts grade for size 25 to 50 Sqmm x 3.5 core/4 core complete all as specified and directed by Engr-in-Charge.
All as per item No 24.0 but size 70 to 95 Sqmm x 3.5 core complete all as specified and directed by Engr-in-Charge.
All as per item No 24.0 but size 185 to 240 Sqmm x 3.5 core complete all as specified and directed by Engr-in-Charge.
Note: contractor should procure and provide 50 % of the material as listed above within 15 days of the placing of work order and shall be verified by the Engr-in-charge
Rajindera Enterprises (BID ID -3115881)
mayur enterprises (BID ID -3102500)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .