Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
23 Mar 2022, 12:00 pmClosed
S.E., EUDC-IX, LESA, TRANS GOMTI, LUCKNOW
EUDC-IX LTG 33/11 KV S/S HAL FAIZBAD ROAD LKO
Work of shifting LT and HT lines and poles from Mulayam Nagar Tiraha to Kishori Lal Chauraha as per request of Executive Engineer-1 Lok Nirman Vibhag, Lucknow in the area of EUDD, Munshipulia LTG Lko under the head of Deposit Work 2022
2022_MVVNL_679583_1
49/EUDC-IX/2021-22
Open Tender
Electrical Works
Item Rate
60 days
EUDC-IX LTG 33/11 KV S/S HAL FAIZBAD ROAD LKO
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C No. 77290200000745 IFSC Code BARB0VJRSMN
₹30,000
1 Apr 2022
17 Mar 2022
23 Mar 2022
17 Mar 2022
23 Mar 2022
17 Mar 2022
Amount
Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km.
PCC pole 8.5 Mtr. Long
9/11 Mtr. Long ST pole
11 KV XLPE cable 3x185 sqmm
Line material Like
LT ABC cable 3x120
LT DP Box
Cable Jointing Kit O/D 3x185 Sq.mm.
Cable Jointing Kit S/T 3x185 Sq.mm.
Fabrication erection of exposure D/P structure on 9/11 Mtr. Long ST pole including mounting of one No. top channel of size 100x50 mm 2.25 m, two nos. dropper angle with clamp and nut bolts, with fixing of necessary clamps, accessories required,(ST pole sahll be supplied by the Deptt).
Fabrication erection of Single pole 11 Mtr. Long ST pole/8.5 long PCC Pole with fixing of necessary clamps, X-Arm/T-of Channel accessories required including digging of pit and fixing of all necessary clamps for 11 KV line. (Pole shall be supplied by the departmrment )
Fabrication erection grouting plinthing of single pole on 8.5 Mtr. PCC pole/11 Mtr long STP for LT line level for LT line. (Only Pole shall be supplied by Department)
Grouting of poles with help of cement sand & brick ballast.
Plinthing of pole with the help of cement core sand & stone ballast.
Painting of pole
Erection of stays with stay set of 16x1800 mm rod duly painted with red oxide, anchor plate, thumble turn buckle and stay insulator etc. digging of pit of size 0.4x0.6x1.6m for grouting by 1:3:6 cement concrete, with stay of size 7/10 swg,nozzling & grouting. (stay set & stay wire will be provided by the depatrtment)
Earthing of poles as per RESPO Norms with earth rod (All the material supplied by the contractor )
Stringing, sagging, binding, jump ring of 3x120 ABC Conductor (ABC Conductor supply by department)
Mounting & Fixing of 3 phase Distribution Box as per Norms (Only Box supplied by the department )
Suppply and fixing of material for ABC
M.S. clamp
I Hook
Suspension clamp
End clamp
A type connector
B type connector
Neutral connector
Laying of 11 KV 3x185 sq.mm. in normal soil by digging of trench of size 900 mm deep 500 mm wide. The cable will be laid in between two rows of first class bricks with sand local sand from each (Only cable will provided by the department).
Laying of 11 KV XLPE cable 3x185 sq.mm by drilling Method (Except 11 KV XLPE cable all the labour and T&P will be provided by contractor )
Hoisting of 11 KV 3x185 Sq.mm. XLPE cable on existing pole cable will be passed through MS pipe of required size duly clamped with pole at bottem, middel and top of thepole (All the material Arrenged by the contractor)
Fixing of MS Channel of size 750x75x50x3mm.
making of busbar on double pole with help of T-off channel and 6 no. 11 kv pin and insulator
Taping of line
Laying of GI pipe 4' Dia under road X-ing
Demounting of 100/160/250 KVA Distribution transformer from existing plinth after opening of all connections and opening of wire mesh fencing.
Mounting of 100/160/250 KVA Transformer on plinth with making all connections & fixing all requisite items/equipments as per RESSPO,s specn and safe energizsation after connecting body & neutral of transformer to earth.
Bore type earthing with 20 Mtr. Deep boring and providing GI pipe 1.5 dia (20 Mtr. GI pipe) of Tata/Zindal make and GI strip 25x5mmx6 Mtr. Long attached with clamps L piece, Nut & Bolts and GI pipe cap.( All material shall be arranged by the Contractor.)
Providing and fixing of copper L Pieces with suitable nuts and bolt for 400 kva transformers with proper disconnection and reconnection.
Construction of plinth suitable of 100/160/250 KVA Transformer including excavation of foundation base concerting of CC 1:6:12 (cement , fine sand & bricks Ballast ) first class brickwork in cement motor of ratio 1:4 foundation CC in 1:4:8 ration (cement fine sand & brick Ballast) and CC work with ratio 1:2:4 cement coarse sand and stone grit of 20 mm. Gauge per RESPO Norms.
Fabrication & erection of wire mesh fencing of size 3x2x1/5 Mtr height.
Dismentling of 11 kv H.T./L.T. line
Dismentling of STP/PCC Pole from site
Removal of wiaesel conductor/ABC
loading,carriage & unloading of conductor /ABC from site to J.E. store
Loading, carriage & unloading of STP/PCC Pole from site to J.E. store
UP ENTERPRISES
Saraswati Electricals & Contractors
DEEPAK ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .