Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
31 Aug 2026, 6:00 pm
Shri Himanshu IDSE EE
GE (I)(CG) Bhubaneswar, Military Engineer Services, Plot No 44/1548/1711, Khata No 190/853, Unit-21, Indraprastha, Phase-II, Near Kokila Palace, Bhubaneswar-751 020 (Odisha)
TERM CONTRACT FOR ARTIFICER WORKS OF DOMESITC AREA AT ARC CHARBATIA
2026_MES_783724_1
8712/BBSR/03/E8
Open Tender
Miscellaneous Works
Item Rate
365 days
CHARBATIA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (I) (CG) Bhubaneswar
₹30,000
Yes
10 Aug 2026
10 Aug 2026
2 Sept 2026
10 Aug 2026
31 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | To perform such services and execute such works covered under the "TERM CONTRACT FOR ARTIFICER WORKS OF DOMESTIC AREA AT ARC CHARBATIA UNDER GE (I)(CG) BHUBANESWAR" upon the terms and conditions contained or referred to in the tender documents and upon the conditions as may be demanded and as are enumerated in the MES Schedule during the period of One Year from the date of acceptance at the rates contained in the MES standard schedule of rates 2020 Part-I (Specifications) and rates contained in the MES Standard schedule of rates Part-II (Rates) and at such other rates as may be fixed under the provisions of Condition 62 of IAFW-2249 (General Conditions of Contracts)
NOTE:
(i) Bidder shall insert uniform percentage at the 15th row under coloumn "F" or '5' of this BOQ sheet.
(ii) Bidder shall refer and "select" the option "Excess(+)" or "Less (-)" available at the 15th row under coloumn 'E' or '4' of this BOQ sheet, to quote the percentage above/below/at par on MES SSR -2020 (Part-II).
(iii) Amount inserted by MES under the column "F" or "6" (estimated Rate) and total amount reflected under Column "BA" or "6" is approximate and for reference only. Irrespective of the amount reflected under Column "BA" or "6". Being Term contract, work is priced at rates given in SSR and adjusted by the percentage quoted by the contractor on this page. | - | YEAR | 15,00,000 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
TENDER.pdf
Tender Documents • 1.44 MB
BOQ_878118.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].