Loading…
Loading…
Tender Value
₹9.7 Cr
EMD Value
₹6.3 L
Closing Date
9 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
DYCEECNGP
13 conditions · 2 needing a document upload
Financial Eligibility Criteria As per Para 10.2. of GCC April 2022 With Amendment as per latest Advanced Correction Slip. The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Tenderer must have valid Electrical Contractor License in the name of Firm or any of the Partner, issued by the concerned Statutory Authority. The copy of the License should be submitted along with the offer, failing to which or in case of any ambiguity about title of the Electrical License submitted with tender, the offer shall be summarily rejected. Technical Eligibility Criteria As per Para 10.1. of GCC April 2022 With Amendment as per latest Advanced Correction Slip. Definition of 'Similar work for minimum Eligibility Criteria for the above subject work is proposed as per CEE's letter no L.574.TRD.Policy dated 18.04.2024. As regard of similar Nature of work: -"Execution of any 25 KV AC OHE work", as under:- The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. Note: Other details as per tender booklet
21 conditions · 14 needing a document upload
As Per Tender Document.
Documents as per the requirement of financial eligibility criteria: The tenderers shall submit requisite information as per 'Annexure-VIB' indicating Annual Contractual turnover data for the previous 3/4 years, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant / Certificate from Chartered Accountant duly supported by Audited Balance Sheet
The tender must be accompanied by a bid security as per clause 5, part I of tender booklet, failing which tender shall be summarily rejected. A bid security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents in the favour of DY. FA & CAO (Construction), Central Railway, Nagpur. The bank Guarantee bond shall be as per Annexure- VI A and shall be valid for a period of 90 days beyond the bid validity period.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association trust or society, as the case may be. In case the tenderer is other than Joint Venture (JV) firm, tenderer has to submit all the documents mentioned below, as the case may be: (a) Sole Proprietorship firm : An undertaking on suitable stamp paper to this effect clearly mentioning PAN number. (b) HUF : (i)A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (c) Partnership Firm : (i) A notarized copy of partnership Deed or Copy of Partnership deed registered with the Registrar.(ii) A notarized or registered copy Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm.(iii) An undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LPP in which they were/are partners/ members. Any Concealment wrong information in regard to above shall make the ineligible or the contract shall be determined under clause 62 of the standard general conditions of contract.(e) Company registered under Companies Act-2013 (i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii) A copy of Certificate of Incorporation(iii)A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (f) LLP ( Limited Liability Partnership ) registered under LLP Act 2008: (i)A copy of LLP Agreement (ii)A copy of Certificate of Incorporation (iii)A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv)An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (g) Registered Society & Registered Trust:(i)A copy of Certificate of Registration (ii)A copy of Memorandum of Association of Society/Trust Deed (iii)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against Society/Trust.(iv) A copy of Rules & Regulations of the Society.
The Tenderer shall submit copy of Vendor Mandate Form as per format in tender booklet.
The Tenderer shall submit copy of complete details of the firm including postal address for correspondence , telephone number ( mandatory ) & Mobile number (if any), Email ID (mandatory), fax number (if any) with the offer.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV)/ Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. In case the tenderer is Joint Venture (JV) firm, tenderer has to submit all the documents mentioned in GCC 2022 Part-I, Clause no. 17.14
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Design, Supply, Erection, Testing & Commissioning of 25kV AC OHE modification work of TGP Yard Phase-II, BTBR Yard & BTBR-URR chord line in WR-NGP section, in connection with ongoing multitracking works of NGP Division C.Rly
NGP-TDC-ELECT-2025-26-07
NGP-TDC-ELECT-2025-26-07
Open
Works - General
12 Months
Mumbai, Maharashtra
₹0
₹6.3 L
9 Apr 2026
14 Mar 2026
26 Mar 2026
217 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 9,65,95,467.88 | ||
| — | 24.00 | — | — | ||
| Survey design and preparation of OHE layout plan ,SED, and relevant drawing for 25 kV AC OHE ( with future provision for 2x25 kV OHE system) as per specification and explanatory notes also including Design of OHE for Tunnel No. | — | — | — | 5,56,950.48 | |
| — | 1200.00 | — | — | ||
| Cement concrete for foundation & plinth in hard soil & rocky soil. | — | — | — | 1,03,64,856 | |
| — | 400.00 | — | — | ||
| Cement concrete for foundation & plinth in other than hard soil & rock. | — | — | — | 29,10,224 | |
| — | 25.00 | — | — | ||
| Reinforced cement concrete in all types of soil. | — | — | — | 3,13,666 | |
| — | 13.00 | — | — | ||
| Stone Pitching in cement. | — | — | — | 42,149.25 | |
| — | 13.00 | — | — | ||
| Brick work for retaining wall | — | — | — | 56,976.66 | |
| — | 3.00 | — | — | ||
| Supply of galvanised steel structure including rolled traction masts. | — | — | — | 4,03,378.77 | |
| — | 3.00 | — | — | ||
| Manual erection of traction masts. | — | — | — | 22,934.01 | |
| — | 200.00 | — | — | ||
| Supply of fabricated Galvanised steel structures (i.e., B series mast TTC and portals ) | — | — | — | 2,68,91,918 | |
| — | 90.00 | — | — | ||
| Manual Erection of fabricated Galvanised steel structures (i.e., B series mast TTC and portals ) | — | — | — | 7,03,330.2 | |
| — | 110.00 | — | — | ||
| Erection of Portal & TT Boom by Road crane.. | — | — | — | 12,71,465.8 | |
| — | 40.00 | — | — | ||
| Supply only of fabricated & galvanised steel work other than masts, TTC & Portals including Super Mast Assembly, Drop Arms, SPS/Fastners etc . | — | — | — | 54,73,524.8 | |
| — | 40.00 | — | — | ||
| Erection of fabricated & galvanised steel work other than masts, TTC & Portals including Super Mast Assembly, Drop Arms, SPS/Fastners etc .. | — | — | — | 3,12,591.2 | |
| — | 130.00 | — | — | ||
| Supply only of guy rod assembly. | — | — | — | 10,17,868.8 | |
| — | 130.00 | — | — | ||
| Erection of guy rod assembly. | — | — | — | 1,29,391.6 | |
| — | 650.00 | — | — | ||
| Supply only of conventional type single bracket assembly including Insulators. | — | — | — | 1,53,86,429.5 | |
| — | 650.00 | — | — | ||
| Erection of conventional type single bracket assembly including Insulators. | — | — | — | 7,17,639 | |
| — | 2500.00 | — | — | ||
| Supply only of 130 sq.mm large Span Wire | — | — | — | 26,35,825 | |
| — | 2500.00 | — | — | ||
| Erection of 130 sq.mm large Span Wire | — | — | — | 2,06,775 | |
| — | 27.00 | — | — | ||
| Supply only of conventional type OHE along with all required components. (107 sq.mm contact, 65 sq.mm catenary wire will be supplied by Railway) | — | — | — | 15,06,756.06 | |
| — | 27.00 | — | — | ||
| Manual erection of conventional type OHE along with all required components. (107 sq.mm contact, 65 sq.mm catenary wire will be supplied by Railway) | — | — | — | 10,10,072.97 | |
| — | 1.70 | — | — | ||
| Supply only of 150 Sq. mm Copper Feeder Wire | — | — | — | 20,44,427.24 | |
| — | 1.70 | — | — | ||
| Erection of 150 Sq. mm Copper Feeder Wire | — | — | — | 1,12,684.45 | |
| — | 55.00 | — | — | ||
| Supply only of 3 pulley type Regulating equipment with counter weight assembly for conventional type OHE. | — | — | — | 42,48,350.7 | |
| — | 55.00 | — | — | ||
| Erection of 3 pulley type Regulating equipment with counter weight assembly for conventional type OHE. | — | — | — | 1,92,338.3 | |
| — | 80.00 | — | — | ||
| Supply only of materials for termination of Double Overhead equipment conductor including insulator. | — | — | — | 9,81,084 | |
| — | 80.00 | — | — | ||
| Erection of materials for termination of Double Overhead equipment conductor including insulator. | — | — | — | 1,38,668 | |
| — | 13.00 | — | — | ||
| Supply only of materials for termination of 150 Sq. mm Copper Feeder Wire | — | — | — | 1,48,093.53 | |
| — | 13.00 | — | — | ||
| Erection of materials for termination of 150 Sq. mm Copper Feeder Wire. | — | — | — | 32,556.03 | |
| — | 20.00 | — | — | ||
| Supply only of Anticreep arrangement with 65 Sq. mm catenary wire for conventional type OHE.{catenary wire will be supplied by RLY at AQ Rly depot) | — | — | — | 4,25,982 | |
| — | 20.00 | — | — | ||
| Erection of Anticreep arrangement with 65 Sq. mm catenary wire for conventional type OHE.{catenary wire will be supplied by RLY at NGP Rly depot) | — | — | — | 49,617.2 | |
| — | 35.00 | — | — | ||
| Supply only of additional fittings at turnout, diamond crossing and overlap. | — | — | — | 1,35,171.05 | |
| — | 35.00 | — | — | ||
| Erection of additional fittings at turnout, diamond crossing and overlap. | — | — | — | 19,028.8 | |
| — | 70.00 | — | — | ||
| Supply only of Solid core cut-in insulator. | — | — | — | 8,33,826 | |
| — | 70.00 | — | — | ||
| Erection of Solid core cut-in insulator. | — | — | — | 52,581.2 | |
| — | 35.00 | — | — | ||
| Supply only of solid core suspension insulator. (Incl. Suspension Arrangement for Copper Feeder Wire 150 sq.mm | — | — | — | 3,91,429.15 | |
| — | 35.00 | — | — | ||
| Erection only of solid core suspension insulator. (Incl. Suspension Arrangement for Copper Feeder Wire 150 sq.mm | — | — | — | 19,061.7 | |
| — | 50.00 | — | — | ||
| Supply only of 25 KV solid core Post insulator. | — | — | — | 4,08,555 | |
| — | 50.00 | — | — | ||
| Erection of 25 KV solid core Post insulator. | — | — | — | 40,555 | |
| — | 33.00 | — | — | ||
| Supply only of Conventional type Section Insulator assembly including insulator. | — | — | — | 16,08,501.51 | |
| — | 33.00 | — | — | ||
| Erection of Conventional type Section Insulator assembly including insulator. | — | — | — | 1,55,634.93 | |
| — | 15.00 | — | — | ||
| Supply only of 25 KV Single Pole Isolator without earth contact assembly. | — | — | — | 12,27,977.4 | |
| — | 15.00 | — | — | ||
| Erection of 25 KV Single Pole Isolator without earth contact assembly. | — | — | — | 69,858.3 | |
| — | 3.00 | — | — | ||
| Extra for supply of an earth contact assembly in an isolator. | — | — | — | 26,179.56 | |
| — | 3.00 | — | — | ||
| Extra for erection of an earth contact assembly in an isolator. | — | — | — | 6,398.49 | |
| — | 60.00 | — | — | ||
| Supply only of a copper jumper.(other than paid under item 6(a)I and 6(a)ii) | — | — | — | 2,35,124.4 | |
| — | 60.00 | — | — | ||
| Erection of a copper jumper.(other than paid under item 6(a)I and 6(a)ii) | — | — | — | 33,853.8 | |
| — | 12.00 | — | — | ||
| Supply of 160 sq. mm copper Jumper for isolator and drop jumper | — | — | — | 54,081.96 | |
| — | 12.00 | — | — | ||
| Erection of 160 sq. mm copper Jumper for isolator and drop jumper | — | — | — | 3,846.24 | |
| — | 3500.00 | — | — | ||
| Supply of Galvanised traction bond (40x6mm) | — | — | — | 10,71,350 | |
| — | 3500.00 | — | — | ||
| Erection of Galvanised traction bond (40x6mm) | — | — | — | 1,99,150 | |
| — | 40.00 | — | — | ||
| Supply of Single electrode earthing station | — | — | — | 1,78,282.4 | |
| — | 40.00 | — | — | ||
| Erection of Single electrode earthing station | — | — | — | 44,721.2 | |
| — | 110.00 | — | — | ||
| Supply only of 36mmx28mm Aluminium bus bar. | — | — | — | 57,795.1 | |
| — | 110.00 | — | — | ||
| Erection of 36mmx28mm Aluminium bus bar. | — | — | — | 30,933.1 | |
| — | 35.00 | — | — | ||
| Supply only of Bus connectors/ terminals, splice suitable for 36x28mm Aluminium bus bar. | — | — | — | 77,299.95 | |
| — | 35.00 | — | — | ||
| Erection of Bus connectors/ terminals, splice suitable for 36x28mm Aluminium bus bar. | — | — | — | 16,492.7 | |
| — | 230.00 | — | — | ||
| Transfer of equipment from one mast or support to another.(Supply) | — | — | — | 11,02,091 | |
| — | 230.00 | — | — | ||
| Transfer of equipment from one mast or support to another.(erection) | — | — | — | 8,06,485.8 | |
| — | 12.00 | — | — | ||
| Dismantling of OHE including SPS,cantilever, etc but without structures. | — | — | — | 3,55,339.32 | |
| — | 95.00 | — | — | ||
| Dismantling of OHE portal booms / masts / uprights by cutting including SPS. | — | — | — | 7,90,470.3 | |
| — | 35.00 | — | — | ||
| Splicing and extension of an anchored OHE | — | — | — | 1,73,574.1 | |
| — | 26.00 | — | — | ||
| Dismantalling of Regulating equipment with counter weight assembly. | — | — | — | 87,198.54 | |
| — | 35.00 | — | — | ||
| Dismantling of termination. | — | — | — | 41,100.85 | |
| — | 150.00 | — | — | ||
| Dismantling of bracket assembly. | — | — | — | 1,63,944 | |
| — | 55.00 | — | — | ||
| Dismantling of Guy Rod assembly. | — | — | — | 29,669.2 | |
| — | 12.00 | — | — | ||
| Dismantling of an Anticreep arrangement | — | — | — | 82,104.36 | |
| — | 15.00 | — | — | ||
| Dismantling of Section insulator assembly | — | — | — | 93,201.3 | |
| — | 10.00 | — | — | ||
| Dismantling of an Isolator assembly | — | — | — | 44,010.8 | |
| — | 2.00 | — | — | ||
| Dismantling of existing AT with all associated equipment, panel etc.. | — | — | — | 7,177.1 | |
| — | 2.00 | — | — | ||
| Dismantling of D.O. Fuse Switch | — | — | — | 3,851 | |
| — | 250.00 | — | — | ||
| Dismantling of L S wire | — | — | — | 49,902.5 | |
| — | 30.00 | — | — | ||
| Dismantling of Cut-in-insulator | — | — | — | 17,985 | |
| — | 20.00 | — | — | ||
| Dismantling of Suspension insulator | — | — | — | 14,138 | |
| — | 48.00 | — | — | ||
| Supply only of Caution Board/sigma board ( various types i.e. Public caution, staff caution, unwired turnout, Engine stop, powerr block working limit ,OHE nearby ,Danger board etc) | — | — | — | 58,480.8 | |
| — | 48.00 | — | — | ||
| Erection of Caution Board/sigma board. ( various types i.e. Public caution, staff caution, unwired turnout, Engine stop, power block working limit ,OHE nearby ,Danger board etc) | — | — | — | 8,593.44 | |
| — | 230.00 | — | — | ||
| Supply only of approved make retro-reflective Number Plate. | — | — | — | 2,18,224 | |
| — | 230.00 | — | — | ||
| Erection of approved make retro-reflective Number Plate. | — | — | — | 38,778 | |
| — | 45.00 | — | — | ||
| Dismantling & re-erection of Number Plate. | — | — | — | 3,002.4 | |
| — | 340.00 | — | — | ||
| Breaking of foundation up to 200 mm below track formation. | — | — | — | 11,98,336.8 | |
| — | 40.00 | — | — | ||
| Cutting / Trimming of various type tree branches only of diameter between 5 cm to 10 cm (approx.) above 5.5 Mtrs from ground level or infringing the HT/LT lines, such as babhool, neem, Gulmohor, Nilgiri, Pipal, Bayan etc. | — | — | — | 17,071.6 | |
| — | 5.00 | — | — | ||
| Supply of 10KVA Auxiliary Transformer including oil filtration, LV box and anticlimbing device for LT supply for Gate | — | — | — | 5,83,158.7 | |
| — | 5.00 | — | — | ||
| Erection, Testing & Commissioning of 10KVA Auxiliary Transformer including oil filtration, LV box and anticlimbing device for LT supply for Gate | — | — | — | 15,381.3 | |
| — | 2.00 | — | — | ||
| Supply only of 25KVA Auxiliary Transformer including oil filtration , LV box and anticlimbing device for LT supply for Gate | — | — | — | 6,41,504.98 | |
| — | 2.00 | — | — | ||
| Erection, Testing & Commissioning of 25KVA Auxiliary Transformer including oil filtration, LV box and anticlimbing device for LT supply for Gate | — | — | — | 46,826.4 | |
| — | 7.00 | — | — | ||
| Supply only of 25KV DO Fuse switch Assembly including 9T Insulator & Mod. Arcing Horn. | — | — | — | 1,55,140.58 | |
| — | 7.00 | — | — | ||
| Erection of 25KV DO Fuse switch Assembly including 9T Insulator & Mod Arcing Horn | — | — | — | 16,792.44 | |
| — | 2500.00 | — | — | ||
| Excavation of cable trench 40 x100 cm in size & Back filling in all type of soil (normal and hard ) including spreading of river sand 200 mm layer and placing bricks size 200x100x75 mm across the trench and back filling by excavated soil as per |S specification. | — | — | — | 2,94,350 | |
| — | 1800.00 | — | — | ||
| Laying of 2/3.5/4 x185 sq.mm and above up to 630sq.mm size cable (including 2x185 sq.mm) in trench including cable marker | — | — | — | 1,80,648 | |
| — | 125.00 | — | — | ||
| Laying of 2/3.5/4 x185 sq.mm and above up to 630sq.mm size cable (including 2x185 sq.mm) in 150 MM DIA RCC pipe for track/ road crossing | — | — | — | 12,545 | |
| — | 2500.00 | — | — | ||
| Laying of 4 x16 sq.mm and above upto120 sq.mm size cable (including 2x70 sq.mm) in trench including cable marker | — | — | — | 1,70,925 | |
| — | 250.00 | — | — | ||
| Laying of 4 x16 sq.mm and aboveupto120 sq.mm size cable (including 2x70sq.mm) in 150 MMDIA RCC pipe for track/road crossing | — | — | — | 15,990 | |
| — | 125.00 | — | — | ||
| Horizontal boaring of suitable size for pushing 150mm HDPE pipe in Railway embankment through excavated thrust pit. | — | — | — | 1,34,405 | |
| — | 125.00 | — | — | ||
| Providing and pushing of HDPE pipe confirming IS1239 size 150 mm inner dia Medium class. | — | — | — | 3,44,490 | |
| — | 350.00 | — | — | ||
| Excavation of thrust pit of size (3M X 4.5M X 2.5M ) 2No. In hard murom at both end refilling of pit after laying of cables etc. | — | — | — | 90,321 | |
| — | 11.00 | — | — | ||
| Supply & Erection of Shock Treatment Chart | — | — | — | 9,025.39 | |
| — | 2.00 | — | — | ||
| Supply of Sectioning Diagram board for Station. (Approximate Size 3'x5') | — | — | — | 11,980.9 | |
| — | 2.00 | — | — | ||
| Supply of Key Box for Station. | — | — | — | 1,598.94 | |
| — | 2.00 | — | — | ||
| Supply only of Control and distribution panel with Auto change over switch 155 Amp capacity (3 source for CLS supply for 25 kVA AT as per latest ROSO specification | — | — | — | 3,15,595.5 | |
| — | 2.00 | — | — | ||
| Erection, testing and commissioning Control and distribution panel with Auto change over switch 155 Amp capacity (3 source for CLS supply for 25 kVA AT as per latest RDSO specification | — | — | — | 10,414.62 | |
| — | 4.00 | — | — | ||
| Supply only of Control and distribution panel with Auto change over switch 63 Amp capacity (3 source for CLS supply for 10 kVA AT as per latest RDSO specification | — | — | — | 2,57,867.64 | |
| — | 4.00 | — | — | ||
| Erection, testing and commissioning Control and distribution panel with Auto change over switch 63 Amp capacity (3 source for CLS supply for 10 kVA AT as per latest RDSO specification | — | — | — | 32,977.2 | |
| — | 2.00 | — | — | ||
| Supply and erection of sectioning / station working rule diagram | — | — | — | 12,267.84 | |
| — | 5500.00 | — | — | ||
| Transportation of Railway materials from Concerned Rly. Depot or Else Rly. Depot store to site and dismantled material from site to Rly depot. | — | — | — | 1,08,130 | |
| — | 1400.00 | — | — | ||
| Supply of Galvanised steel (GI) flat for earth (50x6 mm) for equipment earthing/platform/bridges/LC Gates Earthing | — | — | — | 3,03,282 | |
| — | 1400.00 | — | — | ||
| Erection of Galvanised steel (GI) flat for earth (50x6 mm) for equipment earthing/platform/bridges/LC Gates Earthing | — | — | — | 93,856 | |
| — | 55.00 | — | — | ||
| Supply of G . I. Pipe for cable support | — | — | — | 18,787.45 | |
| — | 55.00 | — | — | ||
| Erection of G . I. Pipe for cable support | — | — | — | 6,262.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderBooklet07yard_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .