| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC LOCATION HIMACHAL PRADESHHPLA | UNA | HIMACHAL PRADESH | 174301 | ₹8.6 L Quoted ₹9.9 L | L1 | Accepted-AOC The rates quoted by the contractor are lowest, hence accepted. |
| 2 | L2₹10.2 LRejected-Finance VILL JAUNI P O GRONG TEH KOTKHAI DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 170009 | ₹10.2 L | L2 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 3 | L3₹10.7 LRejected-Finance LOWER DEVNAGAR VIKASNAGAR SHIMLA 09 | ₹10.7 L | L3 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 4 | Rejected-Technical PREM COTTAGE LOWER KAITHU DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | mukul thakur L1 | VIRENDER BANSHTU L3 | Bhaw Singh Chauhan L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at approved dumping site Bharyal. Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 21 | P.Cum | 400 ₹8,400 | 500 ₹10,500 | 600 ₹12,600 |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 6 | P.Cum | 400 ₹2,400 | 500 ₹3,000 | 650 ₹3,900 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 2 | P.cum | 5,000 ₹10,000 | 5,500 ₹11,000 | 6,200 ₹12,400 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 10.31 | P.sqm | 450 ₹4,639.50 | 500 ₹5,155 | 550 ₹5,670.50 |
| 5.00 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 13.06 | P.cum | 6,500 ₹84,890 | 7,000 ₹91,420 | 6,900 ₹90,114 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 498.5 | P.Kg | 100 ₹49,850 | 110 ₹54,835 | 125 ₹62,312.50 |
| 7.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 3,564.04 | P.Kg | 130 ₹4.6 L | 140 ₹5.0 L | 130 ₹4.6 L |
| 8.00 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 110.61 | P.Sqm | 200 ₹22,122 | 210 ₹23,228.10 | 150 ₹16,591.50 |
| 9.00 | Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in approved M.C. Dumping site at bharyal (10 km) inc carriage of material in all leads and lift and others incidentail as per direction of Engineer-in-Charge | 10.5 | P.cum | 450 ₹4,725 | 500 ₹5,250 | 650 ₹6,825 |
| 10.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases, including use of 7 mm thick chequered plate wherever required, all complete including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 2,588.76 | P.Kg | 130 ₹3.4 L | 140 ₹3.6 L | 135 ₹3.5 L |
Tender Value
₹8.8 L
EMD Value
₹17,600
Closing Date
19 Feb 2026, 5:00 pmClosed
Executive Engineer R B MC Shimla
Executive Engineer R B MC Shimla
Extension of MC Parking Road from Laxmi Narayan Temple to Police Post RD 0 70 to 0 85 Ward no 27 Kasumpti
2026_MC_128176_12
26 140dated19012026
Open Tender
Civil Works
90 days
Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹590
Executive Engineer R B MC Shimla
₹17,600
31 Mar 2026
11 Feb 2026
20 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All the surplus excavated earth to be dumped at approved dumping site Bharyal. Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in approved M.C. Dumping site at bharyal (10 km) inc carriage of material in all leads and lift and others incidentail as per direction of Engineer-in-Charge
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases, including use of 7 mm thick chequered plate wherever required, all complete including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_189501.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid