Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹1.9 L+₹8,175 (4.38%)Rejected-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹2.3 L
EMD Value
₹2,300
Closing Date
11 Oct 2021, 2:00 pmClosed
CE/TTPS/SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
Maintenance of LT Motors, LT Power contactor LT Switch gears and Power Transformer of AHP-II DMP II and FOPH II of Unit IV and V of TTPS from the date of commencement of work upto 31 03 2022
2021_EB_210938_1
CE/TTPS/ SE/ES /200 /2021-22
Open Tender
Electrical Works
Item Rate
180 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹2,300
Yes
25 Feb 2022
4 Oct 2021
12 Oct 2021
4 Oct 2021
11 Oct 2021
4 Oct 2021
Replacement of ASPM&AWPM motor (155 to 158KW) Dismantling the terminal cover and power cable of failed motor. Replacement of defective motor by spare motor. Cleaning and Reconnecting of power cable terminals. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light. Tightness checking of power cable terminals at beaker end. Assembling the terminal cover. Commissioning of motor. Measuring load currents at idle and full load condition. Including cost of T&P and consumable etc
Servicing of three phase power contactor -400 A capacity:- Disconnecting the power contactor limb bolt and nuts and control wires. Removing the power contactor from the panel. Dismantling the power contactor. Cleaning of all parts of power contactor by cleaning agent. Checking the healthiness of 415 volt power coil. Assembling and checking the performance of power contactor. Refixing the power contactor in the panel. Replacing the indication lambs, switches, and resistor if necessary. Cleaning and checking the function of control switches. Tightness checking of all control wires. Including cost of T&P and consumable etc
Maintenance of ASP, AWP&FOPH-II Motors (100 to 158 KW) Dismantling the terminal cover of motor. Disconnecting the power cables. Cleaning and Reconnecting of power cable terminals. Replacing the lug, bimetallic sheet, earthing cable, cooling fan, cooling fan cover, bolt, nut, washer, spring washer etc if necessary. Applying grease. Assembling the terminal cover. Replacement of defective motor by healthy one if necessary. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light if necessary. Measuring load currents at idle and full load condition. Including cost of T&P and consumable etc
Maintenance of auxiliary motor (Upto 55 KW):- Dismantling the terminal cover of motor. Disconnecting the power cables. Cleaning and Reconnecting of power cable terminals. Replacing the lug, bimetallic sheet, earthing cable, cooling fan, cooling fan cover, bolt, nut, washer, terminal black etc if necessary. Applying grease. Assembling the terminal cover. Replacement of defective motor by healthy one if necessary. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light if necessary. Measuring load currents at idle and full load condition. Cleaning and checking the function of control switches. Replacing the Control switches if necessary. Tightness checking of all control wires. Including cost of T&P and consumable etc
PANDIAN ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .