Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance J D INDUSTRIAL ESTATE OPP PRASAD HOTEL NEAR DAHISAR CHECKNAKA MIRA ROAD EAST THANE MAHARASHTRA 401104 | 401104 | Admitted-Finance |
| 2 | Admitted-Finance 89 GIDC ESTATE POR BARODA GUJARAT 391243 | VADODARA | GUJARAT | 391243 | Admitted-Finance |
| 3 | Admitted-Finance SHOP NO 25 HARHARWALA BUILDING SVP ROAD MUMBAI MUMBAI MAHARASHTRA 400004 | MUMBAI | MAHARASHTRA | 400004 | Admitted-Finance |
| 4 | Admitted-Finance A 458 CHOPANKI INDUSTRIAL AREA BHIWADI BHIWADI ALWAR RAJASTHAN 301019 | ALWAR | RAJASTHAN | 301019 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr.Sushant Deshpande
thyssenkrupp Industrial Solutions India Pvt Ltd Vikhroli Mumbai India
Supply UG CS FITTINGS LOT-2 for MSB, PFCC, GDS UNIT FOR NREP as per Technical Specifications for Numaligarh Refinery Limited,Assam, INDIA.
2023_NRL_763718_1
TK-1ZZZA-MP-RFQ-0102
Limited
Miscellaneous Goods
Supply
120 days
Numaligarh Refinery Limited Assam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
11 Oct 2023
27 Jul 2023
25 Aug 2023
27 Jul 2023
24 Aug 2023
11 Aug 2023
27 Jul 2023 - 7 Aug 2023
GROUP -1 SUPPLY OF FITTINGS CARBON STEEL(FROM SEAMLESS PIPE) Lot-2 for UG PIPING for NREP PROJECT incuding TPI charges as specified in Material Requisition.
ELB 90 DEG LR CS INT.&EXT.COAT, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019
ELB 90 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 90 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 90 DEG LR CS GALV.&EXTCOAT, B16.9, BW ENDS,SCH STD, SEAMLESS, INSIDE GALVANISED, A234 Gr.WPB-S(GALV.), MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH 20, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 20, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH 20, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 20, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
ELB 45 DEG LR CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
ELB 45 DEG LR CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
ELB 45 DEG LR CS (CAUSTIC), B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
ELB 45 DEG LR CS (CAUSTIC), B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS (NACE), B16.9, BW ENDS,SCH XS, SEAMLESS, SERVICE NACE, CATEGORY 1, A234 Gr.WPB-S, MAT. DELIV. COND. SCH XS, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, FOR SOUR(NACE) SERVICE REQ. ACC. TO, NACE MR0103,NR-0ZZZZ-PI-SPE-0025 AND IN-043
ELB 45 DEG LR CS (CAUSTIC), B16.9, BW ENDS,SCH 160, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 160, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
ELB 45 DEG LR CS GALV.&EXTCOAT, B16.9, BW ENDS,SCH STD, SEAMLESS, INSIDE GALVANISED, A234 Gr.WPB-S(GALV.), MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
CON RED CS EXT. COATED, B16.9, BW ENDS,SCH 20, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 20, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
CON RED CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
CON RED CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
CON RED CS INT.&EXT.COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019
CON RED CS INT.&EXT.COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019
CON RED CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
TEE CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
TEE CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
TEE CS, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
TEE CS (CAUSTIC), B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042
TEE CS INT.&EXT.COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019
TEE CS INT.&EXT.COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019
TEE CS EXT. COATED, B16.9, BW ENDS,SCH STD, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH STD, ADD. INFORMATION, SCHEDULE INDICATED IS FOR RUN SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ECC RED CS EXT. COATED, B16.9, BW ENDS,SCH 20, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 20, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ECC RED CS EXT. COATED, B16.9, BW ENDS,SCH 20, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 20, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ECC RED CS EXT. COATED, B16.9, BW ENDS,SCH 20, SEAMLESS, A234 Gr.WPB-S, MAT. DELIV. COND. SCH 20, ADD. INFORMATION, SCHEDULE INDICATED IS FOR HIGHER SIZE, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
GROUP -2 SUPPLY OF FITTINGS CARBON STEEL (BLOCK FORGED) Lot-2 for UG PIPING for NREP PROJECT incuding TPI charges as specified in Material Requisition.
ELB 90 DEG CS EXT. COATED, 3000,0, B16.11, SW ENDS, FORGED, A105N, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
HCPL CS (GALV.)&EXT. COATED, 3000,0, B16.11, THREADED END,FNPT, FORGED, INSIDE GALVANISED, A105N (GALV.), SUPP. REQUIREMENTS, FOR SIZE <=1 1/2" , TAPER INTERNAL THREADS, AS PER ASME/ANSI B1.20.1, FOR SIZE 2" TO 6",TAPER INTERNAL THREADS, AS PER IS554, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
GROUP -3 SUPPLY OF FITTINGS CARBON STEEL (FABRICATED FROM PLATE) Lot-2 for UG PIPING for NREP PROJECT incuding TPI charges as specified in Material Requisition.
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, LW, WELD FACTOR E = 1.00, A234 Gr.WPB-W, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
ELB 45 DEG LR CS EXT. COATED, B16.9, BW ENDS,SCH STD, LW, WELD FACTOR E = 1.00, A234 Gr.WPB-W, MAT. DELIV. COND. SCH STD, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005 AND IN-042, EXTERNALLY FBE COATING ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0015
Navkar Fittings And Forgings Pvt Ltd
SAWAN ENGINEERS PVT LTD
FITTECH INDUSTRIES PVT LTD
P.K. Tubes and Fittings Pvt. Ltd.
PARAS ENGINEERING WORKS MUMBAI PVT LTD
Real Forge and Fitting
M/s Gujarat Infrapipes Pvt Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .