Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
29 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Director
Executive Director, SAG, 1st Floor Atal Stadium, Cujira St Cruz Goa
Developement of Sports Infrastructure in Mandrem Goa
2026_TSAG_32321_1
SAG/EE-ED/TECH/F08/26-27/2269
Open Tender
Miscellaneous Works
Percentage
370 days
Mandrem Goa
Please refer Tender documents.
5 documents required · 5 mandatory
₹40,000
₹25.8 L
14 Oct 2026
14 Oct 2026
30 Oct 2026
14 Oct 2026
29 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: a) Ordinary soil | 9,395 | Sq.m | 48 | ₹4,50,960 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : all kinds of soil | 1,688.57 | Cu.m | 286 | ₹4,82,931.02 |
| 3 | Earthwork in excavation in foundation pipeline trenches, drain in saturated soil upto a depth of 0.60 m lift upto 1.50 m including shoring, strutting and pumping/bailing out water stacking the excavated soil not more than 5 m. clear from the edge the excavation and returning the stacked soil in 0.15 m layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming, watering and disposing of all surplus excavated soil within a lead upto 20m | 50 | Cu.m | 822 | ₹41,100 |
| 4 | Refilling the pipeline / foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 2,524.73 | Cu.m | 245 | ₹6,18,558.85 |
| 5 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. Moorum | 633.95 | Cu.m | 622 | ₹3,94,316.9 |
| 6 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 816.45 | Cu.m | 2,211 | ₹18,05,170.95 |
| 7 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level | 476.22 | Cu.m | 6,635 | ₹31,59,719.7 |
| 8 | Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level.
i) M-30 grade of concrete | 692.86 | Cu.m | 8,874 | ₹61,48,439.64 |
| 9 | Centering & shuttering including Strutting, Propping & removal of forms for :
Foundations, Footings, Bases for columns | 83.7 | Sq.m | 407 | ₹34,065.9 |
| 10 | Centering & shuttering including Strutting, Propping & removal of forms for :
Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) | 378.45 | Sq.m | 598 | ₹2,26,313.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
Tendernotice_2.pdf
PDF • 2.25 MB
Tendernotice_3.pdf
PDF • 1.50 MB
BOQ_32703.xls
BOQ • 1.06 MB
corrimandrem.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .