Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹13.2 L+₹3.4 L (34.6%)Rejected-Finance HOUSE NO 87 SHAH FAISAL ABAD DHOBI MOHALLA BATAMALOO SRINAGAR 190009 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190009 | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹13.7 L+₹3.9 L (39.8%)Rejected-Finance DHOBI MOHALLA BATMALOO SRINAGAR 190010 J K | SRINAGAR | SRINAGAR | J K | 190010 | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹14.0 L+₹4.2 L (42.6%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN LOWEST |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
30 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE 874 EWS, C/O 56 APO
GE 874 EWS, C/O 56 APO
Class E Category b ii
2020_MES_391512_1
GE 874/EWS-34/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
210 days
Zangli, Trehgam, Chowkibal and Thagdhar
WINTER PREPARATION AND ALLIED MAINT ACTIVITIES FOR ELECT DISTRIBUTION SYST EMS AT ZANGLI TREHGAM CHOWKIBAL AND TANGDHAR MILITARY STATIONS UNDER GE 874 EWS
5 documents required · 5 mandatory
₹500
GE 874 EWS C/o 56 APO
₹20,000
19 Feb 2021
31 Oct 2020
1 Dec 2020
31 Oct 2020
30 Nov 2020
11 Nov 2020
2 Nov 2020 - 9 Nov 2020
60 days
Amount
Repair/maintenance and servicing of step down transformer 11 KV/433 Volt of capacity 100 to 400 KVA, of any make, Installed at different locations of AOR comprising following work services :- (a) Disconnection carefully of cable end termination of HT & LT side. (b) Opening of top cover by removing nuts, bolts and all mounting accessories and conservator tanks. (c) Draining out transformer oil and keeping aside in barrel for re-use and then again pouring back after necessary filteration and dehydration including top up with new transformer oil to make up the reduced quantity. (d) Replacement of top gaskets. (e) Servicing of tap changing gears by cleaning and polishing tapping contact points. (f) Labour only for cleaning of bush and stud both HT/LT side and refixing the same with new cock sheet as required. (g) Replacing unserviceable stud and bush as required as directed by Engr-in-Charge. (h) Reconnection of all cable terminals HV & LV sides and refixing the top cover after replacement of gaskets, conservator tank in position. (j) Cleaning and heating of silica gel in breather and replacing with new silica gel to make up the reduced quantity. (k) Connecting HT & LT side with existing incoming and outgoing cables including reconnection of earth strip/lead. (l) Provision of a functional transformer of same or higher capacity while the transformer is taken for repair. (m) Any transportation of the transformer to and from the location of installation to the contractors workshop, including installation back as specified by engineer in charge. Note : (i) Spare parts not mentioned above (if required) will be measured and paid separately. (ii) New transformer oil (if required for topping up) will be measured and paid separately. (iii) De-hydration of existing transformer oil for refilling will be measured and paid separately. (iv) The transformers have to be taken for repair and a replacement transformer (of contractor) to be placed within 36 hrs from intimation through phone/ whatsapp, irrespective of any weather or COVID related issues. For this purpose, the contractor has to submit a functional phone and whatsapp number that is not to be switched off at any time. Any delay beyond this time will be fined at the rate of Rs. 1000 per day per job
All as per item No 01 here-in -before but 33/11 kV & 11 KV/433 Volts transformer of 40 to 100 KVA capacity instead of 100 to 400 kVA capacity and only 11 kV/433 Volts transformer
Supply only bushing and stud complete with porcelain insulators and gasket complete for LT side (as per existing size/Model) for transformers/ stabilisers of any capacity
Supply only bushing and stud complete with porcelain insulators and gasket complete for HT side (as per existing size/Model) for transformers/ stabilisers of any capacity
Supply only temperature sensor for transformer/ stabiliser with analog gauge requiring no separate power supply, compatible with the equipment at site
Supply only pressure sensor for transformer/ stabiliser with analog gauge requiring no separate power supply, compatible with the equipment at site
Supply and fix breather assembly with silica gel crystals for dehumidification of transformer/ stabiliser as specified by engineer in charge
Supply only silica gel crystals for dehumidification of transformer/ stabiliser as specified by engineer in charge
Dehumidifying silica gel crystals of one transformer/ stabilisers as specified by engineer in charge
Replacement of burnt/ unserviceable defective HT/ LT copper coil of transformers and Voltage Stabilisers with new one made out of suitable size/ guage of copper super enameled wire of high quality matching with the existing impendence and insulation, all as specified and directed by Engr-in-Charge. Note :- (a) The cost of coil shall be inclusive of cost of varnish insulating paper and other insulating materials and no extra payment will be made for the same. (b) cost is included in disconnecting of all electrical connections and transportation of transformer from site to reputed wksp and back including reinstalling & reconnecting electrical connection and no extra payment will be made for the same. (c) Standby transformer will be arranged by contractor at his own cost to avoid failure of supply on site and the capacity of transformer should be matched with repaired transformer.
Dehydration and filtration of transformer oil of existing transformer / voltage stablizer installed at site with portable plant to improve the dielectric strength from 10 kV to 60 KV during filling after initial filtration including testing of dielectric strength after dehydration at site complete all as specified and directed. When the transformer being dehydrated is serviceable, the dehydration and filteration has to be done and if not possible, the transformer oil shall be changed at the same cost. Note: The dehydration has to be done at site with the transformer running
Supply & filling new transformer oil in transformer and LT/ HT stabilisers in situ/at site for toping up the level of oil, having dielectric strength of min 60 KV during filling after initial filtration confirming to IS-335 all as directed at site by Engr-in Charge (Transformer oil shall be supplied in sealed container). The schedule also contains any supply only of transformer oil also.
Painting of transformers/ stabilisers of any capacity after cleaning the body surface of transformer/ stabiliser by rubbing with emery Paper to remove oil stains, dust etc and applying one coat of snthetic enamel paint by spray paint incl writing SM No/MES No , capacity of transformer, OCB panel all as directed by Engr-in-Charge.
Dismantling the any type (digital/ analog/ numeric/ mechanical/ any other old type) voltage stabilizer by taking out transformer oil and storing for reuse (after cleaning and removing moisture from it) and repairing / replacing the unserviceable parts, reassembling it after repair testing and commissioning the voltage stablizer of any capacity unbalanced type Installed at different location of AOR (spares to be measured and paid separately under relevant item of this schedule). Where the contractor claims that spares for the stabiliser are not available, he shall update the stabiliser to latest specifications using components equivalent of below mentioned spares. The equivalence shall be decided by the engineer in charge Note: The stabilisers have to be taken for repair and a replacement stabiliser (of contractor) to be placed within 36 hrs from intimation through phone/ whatsapp, irrespective of any weather or COVID related issues. For this purpose, the contractor has to submit a functional phone and whatsapp number that is not to be switched off at any time. Any delay beyond this time will be fined at the rate of Rs. 1000 per day per job
Supply only in replacement servo motor of upto 5 Kg torque capacity/rating complete for voltage correction having speed of correction 8 volt per second Make AE/ Paradise/ Voltamp
Supply only in replacement servo motor of upto 10 Kg torque capacity/rating complete for voltage correction having speed of correction 8 volt per second Make AE/ Paradise/ Voltamp.
Supply only, in replacement, Dimmerstat for any type voltage stabilizer all as specified and directed by Engr-in-charge: -
Supply only in replacement RC network for servo motor part/circuit for voltage stabilizers all as specified and directed by Engr-in-charge.
Supply only in replacement trigger transformer 24 volt (or as required voltage) for any type voltage stablizer all as specified and directed by Engr-in-charge.
Supply only in replacement PCB Holder for any type voltage stablizer all as specified and directed by Engr-in-charge.
Supply only in replacement Auto to Manual switch for voltage stablizer all as specified and directed by Engr-in-charge.
Supply only in replacement Rotary switch for RYB phases of voltage stabilizer all as specified and directed by Engr-in-charge.
Supply only in replacement carbon bush of voltage stabilizer at site of any capacity all as specified and directed by Engr-in-charge.
Supply only any type of PCBs /control cards for voltage stabilizer of any type and capacity all as required, with all specified and directed by Engr-in-charge (If new PCB is not compatible, then appropriate compatibility accessories will be added within this schedule and not paid/ measured seperately).
Supply only Replacement of bushing assembly including brass nut, stud, washer and insulator suitable for voltage stabilizer of cap upto 400 KVA all as directed (If new bushing assembly is not compatible, then appropriate compatibility accessories will be added within this schedule and not paid/ measured seperately).
Supply and fixing digital Voltmeter - 0-500 Volt range square shape 96mm for any type voltage stablizer all as specified and directed by Engr-in-charge.
Supply and fixing digital Ammeter with range as required square shape 96mm for any type voltage stablizer all as specified and directed by Engr-in-charge.
M & L Control Wiring complete with suitable copper wire of required size or as per sample/directed including accessories for voltage stabilizer of any capacity (If new control wiring is not compatible, then appropriate compatibility accessories will be added within this schedule and not paid/ measured seperately).
Supply and fixing DPDT switch for any type voltage stablizer all as specified and directed by Engr-in-charge.
Supply and fixing Panel Lamp for any type voltage stablizer all as specified and directed by Engr-in-charge.
Supply Only Fule Filter Suitable for 100 KVA DG Set complete all as directed by Engr-in-charge. Common notes for above all items :- (a) The items mentioned above are all provisional as per condition 7 of IAFW 2249 and it is assumed that the contractor has concented his aggreement to enhancement or decrease in quantities of the schedule while quoting for the contract. (b)The contractor must provide Soft Copies and Hard Copies of Photographs of work site, before the work done, during the work done and after the work done, for each work, including all components repaired and replaced, before processing of any RAR or Final Bills. Without a photograph of any single item, the corresponding item will not be measured. (c) The contactor must obtain user unit's completion certificate in register as given in schedule above for each work done and provide a copy of the same to MES before processing of any RAR. (d) The contractor must deposit copies of electrical licence, diploma/ engineering certificate of supervisor employed and police verification certificates to MES authorities before the commencement of the contract work. Along with every RAR, copies of Aadhar linked bank account statement for proof of deposition of minimum wages to the employees should be deposited. Without these NO RAR or Final bill to be processed by contractor. (e) Contractor to provide only signed copies of purchase vouchers. In addition, original copies of warranty certificates of the manufacturer for every new item installed or supplied will be provided. (f) The repair of stabilisers and transformers are to be considered as essential service and hence the provision of such services under the contract must continue even during curfew/ lockdown periods. The provision/ arrangement of curfew passes to the contractor, his workforce and vehicles will however be the responsibility of the Engineer in Charge
M/s Lal Enterprises
M/S ASHRAF CONSTRUCTIONS
M/S Khan Hussain & Co.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .