Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.0 LAdmitted-Finance | -20.31% | ₹38.0 L | L1 | Admitted-Finance |
| 2 | L2₹38.7 L+₹71,503.37 (1.88%)Admitted-Finance | -18.81% | ₹38.7 L+₹71,503.37 (1.88%) | L2 | Admitted-Finance |
| 3 | L3₹40.5 L+₹2.5 L (6.68%)Admitted-Finance | -14.99% | ₹40.5 L+₹2.5 L (6.68%) | L3 | Admitted-Finance |
| 4 | L4₹42.2 L+₹4.2 L (11.0%)Admitted-Finance | -11.56% | ₹42.2 L+₹4.2 L (11.0%) | L4 | Admitted-Finance |
| 5 | L5₹42.4 L+₹4.4 L (11.7%)Admitted-Finance | -11.00% | ₹42.4 L+₹4.4 L (11.7%) | L5 | Admitted-Finance |
Tender Value
₹47.7 L
EMD Value
₹95,340
Closing Date
14 Aug 2026, 6:00 pmClosed
UIT SIKAR
UIT SIKAR
Construction of Interlocking tiles road and Footpath from Balaji tower to Gramin Court in road side area at Piprali circle, Sikar
2026_UIKSK_582307_1
NIT 12/2026-27
Open Tender
Civil Works
Percentage
90 days
SIKAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
RTGS/NEFT
₹95,340
Yes
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part 'A' | - | - | - | - |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202. By mechanical means .Cement Concrete | 400 | Cum | 308 | ₹1,23,200 |
| - | Survey of Proposed road including printout of Plan, L-Section & Cross section onA-3size paper in three copies & one softcopy of approved media(For L-Section levels are to be taken at an interval of 25m on plain terrain and 10m on rolling & at CD works) including computation of quantities of earth work incutting/ filling as per L-Section & Cross section. | 0.25 | Km | 2,265 | ₹566.25 |
| - | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 1,957.5 | Cum | 31 | ₹60,682.5 |
| - | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 1,957.5 | Cum | 40 | ₹78,300 |
| - | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300-1 and 300-2 for subgrade construction as per MoRTH Specification Clause 305.3.4 | 450 | Cum | 35 | ₹15,750 |
| - | Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Plant Mix Method ,Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with notor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S. 2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete [MoRTH specification : Clause 401]. By Mechanical means.For Grading I Material | 502 | Cum | 882 | ₹4,42,764 |
| - | Dry Lean Cement Concrete Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 335 | Cum | 2,715 | ₹9,09,525 |
| - | Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 80mm as per drawings and as per IS 15658:2006. and all materials shall conform to MoRTH Specification Clause 602 with M-30 Grade 0.30Mtr x0.30Mtr x0.15 Mtr Edge Blocks. Category 'B' :Dentated only two side like I,Z,T shape as per IRC:SP:63-2004 | 2,970 | sqm | 917 | ₹27,23,490 |
| - | Add extra for Providing M-40 grade concrete Interlocking Blocks in place of M-30 grade. 80mm thick Blocks | 2,970 | sqm | 7.7 | ₹22,869 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_1034653.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .