| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAdmitted-Finance | ₹7.0 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Eco Paryavaran Engineers and Consultants Private Limited L1 |
|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | ||||
| 1.00Schedule 'A' Part-I(SOLID WASTE MANAGEMENT WORKS INCLUDING CIVIL WORKS, PLANTS, MACHINERIES, ELECTRICAL, MECHANICAL, AREA DRAINAGE, SEWAGE DISPOSAL, ROADS, PATH, COMPOUND WALL, GATE, FIRE FIGHTING, ETC. WITHIN AND INCLUDING THE PERIPHERY OF COMPOUND WALL) | ||||
| 1.00 | Design, procurement, construction, commissioning, solid waste management plant (at Bathinda Mil Stn) for daily guaranteed Acceptable Waste of 20 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 50000) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, comprehensive maintenance and service with including consumable materials, chemicals, power, water etc. and shall comprise as under for the scope of works: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of wash/ change room (both male and female), various storage, processing area, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 1 | Each Job | 6,75,00,000 ₹6.8 Cr |
| 1.00Srl Item No 1.001 Continued...... (h) Standby power back up with Diesel Generator Set and Solar Power Plant as per the discretion of the contractor of suitable capacity. The fuel shall be supplied by the contractor during the operation, maintenance and service period. Diesel Engine Generator Set shall be as per the latest CPCB norms. (i) Electricity supplied by the department shall be charged from the contractor at the rate charged by the concerned State Power Corporation Limited from the department. (j) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting. (k) Obtain statutory clearance from Government. (l) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government. However no compensation shall be paid for lesser quantities of solid waste. (m) The rates quoted are inclusive of operation, comprehensive maintenance and service and the payment schedule shall be as under: - (A) After Finalisation of detail project report- Nil (B) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for Interim Payment/ Advance on Account) (C) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for intermediate period) (D) After completion of 1 year of comprehensive maintenance: 72% (E) After completion of 2 year of comprehensive maintenance: 74% (F) After completion of 3 year of comprehensive maintenance: 76% (G) After completion of 4 year of comprehensive maintenance: 79% (H) After completion of 5 year of comprehensive maintenance: 82% (I) After completion of 6 year of comprehensive maintenance: 85% | ||||
| 1.00Srl Item No 1.001 Continued...... (J) After completion of 7 year of comprehensive maintenance: 88% (K) After completion of 8 year of comprehensive maintenance: 92% (L) After completion of 9 year of comprehensive maintenance: 96% (M) After completion of 10 year of comprehensive maintenance: 100% (N) The retention money shall be as applicable. (n) Monthly testing solid waste parameters before and after processing from NABL approved lab. | ||||
| 2.00 | Lump sum price worked out by the tenderer for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-II(Ref pre-priced schedule attached separately) | 1 | Running | 51,000 ₹51,000 |
| 3.00 | Lump sum price worked out by the tenderer for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III(Ref pre-priced schedule attached separately) | 1 | Running | 16,00,000 ₹16 L |
| 4.00 | Lump sum price worked out by the tenderer for SITE CLEARANCE, EXCAVATION AND EARTH WORKS as listed in Schedule ‘A’ Part-IV(Ref pre-priced schedule attached separately) | 1 | Running | 54,000 ₹54,000 |
| 5.00Schedule 'A' Part-V(ARBORICULTURE) | ||||
| 5.00 | M & L for preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete all as specified and as directed. Note: Cost of sludge, manure or extra earth shall be included in the quoted rate. | 20 | Cum | 3,000 ₹60,000 |
Updated dates
Tender Value
₹7.4 Cr
EMD Value
₹6.9 L
Closing Date
16 Feb 2026, 6:00 pmClosed
Chief Engineer Bathinda Zone
Headquarters Chief Engineer Bathinda Zone Military Engineer Services PIN- 900484 C/o 56 APO
PROVISION OF SOLID WASTE MANAGEMENT INFRASTRUCTURE AT BATHINDA MIL STN
2025_MES_745195_1
84550 CE BTZ/BTD/TOKEN-56 OF 2025-26
Open Tender
Civil Works
4015 days
GE (P) Bathinda
As per Notice Inviting Tender (NIT)
8 documents required · 8 mandatory
₹3,000
GE (P) Bathinda
₹6.9 L
Yes
Headquarters Chief Engineer Bathinda Zone
21 Feb 2026
19 Dec 2025
19 Feb 2026
19 Dec 2025
16 Feb 2026
2 Feb 2026
19 Dec 2025 - 24 Jan 2026
30 Dec 2025
NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates.
Schedule 'A' Part-I(SOLID WASTE MANAGEMENT WORKS INCLUDING CIVIL WORKS, PLANTS, MACHINERIES, ELECTRICAL, MECHANICAL, AREA DRAINAGE, SEWAGE DISPOSAL, ROADS, PATH, COMPOUND WALL, GATE, FIRE FIGHTING, ETC. WITHIN AND INCLUDING THE PERIPHERY OF COMPOUND WALL)
Supply and laying double wall corrugated pipe (DWC), non-metallic, Resistance to Compression : Type 450, Resistance to Impact: Normal, Resistance to Bending : Pliable, Resistance to External Influence: Ingress Protection : IP 67, Resistance against Corrosion : Without Protection, Resistance to Flame Propagation : Non Flame Propagating, Nominal outside diameter 110 mm, minimum inside dia 82 mm conforming to IS 16205 (Part 24) : 2017 complete all as specified and as directed.
Running Metre
Design, procurement, construction, commissioning, solid waste management facility for daily guaranteed Acceptable Waste of 20 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 50000) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening, shorting, separation of recyclable/ non recyclables/ RDF/ Inert from the solid waste and monitoring through SCADA complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: - (a) Preparation and finalisation of Detail Project report (b) The space for stacking of solid waste of minimum 2 days. (c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department. (d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed. (e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge. (f) Design, prepare architectural/ structural drawing, supply, transportation, construction of Admin Block with conference room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc. (g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. (h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period.
Lump sum price worked out by the tenderer for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-II(Ref pre-priced schedule attached separately)
Lump sum price worked out by the tenderer for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III(Ref pre-priced schedule attached separately)
Lump sum price worked out by the tenderer for SITE CLEARANCE, EXCAVATION AND EARTH WORKS as listed in Schedule ‘A’ Part-IV(Ref pre-priced schedule attached separately)
Schedule 'A' Part-V(ARBORICULTURE)
M& L for plantation of shrubs, hedge etc. at the site including watering and removal of unserviceable material including shrub/ hedge plants of any type and of height 60-75 cm in earthen pots of size 20 cm complete all as specified and as directed.
M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per ho
Each Calender month
Set of three
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_834426.xls
BOQ • 0.25 MB
TenderDocumentsComplete.pdf
Tender Documents • 1.55 MB
Download all tender documents and submit your bid