| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 CrAccepted-AOC | ₹11.8 Cr Quoted ₹12.4 Cr | L1 | Accepted-AOC Financial bid is accepted at the price Rs 117823739.85 by the Employer |
| 2 | L2₹13.3 CrRejected-Finance | ₹13.3 Cr | L2 | Rejected-Finance Being higher rate rejected |
Tender Value
Refer Docs
EMD Value
₹32.1 L
Closing Date
14 Mar 2023, 2:00 pmClosed
S.E.Sitapur/Kheri Circle PWD Sitapur
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Widening and Strengthening of Maholi Hargaon Bhadfar Road (SH-140) Km 53 to Ramnafarm-Mahadev Atra hote Huye Deirama Chaurahe Tak (ODR)
2023_CEUCZ_775213_1
536/352C/E-TEND-STP-LMP/2023 Dt.04.02.2023
Open Tender
Civil Works - Roads
365 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹32.1 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
29 Apr 2023
15 Feb 2023
14 Mar 2023
15 Feb 2023
14 Mar 2023
15 Feb 2023
17 Feb 2023
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unservicable materials and stacking of servicable material to be used or auctioned, upto a lead of 1000 m, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (RAP with 3.5% emulsion & 1% cement)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-II)
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Laying Reinforced cement concrete600mm dia pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete an
Laying Reinforced cement concrete 100mm dia pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete an
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
M/s Progressive Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid