| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC | ₹39.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹44.3 LRejected-Finance LIG II 48 PRAGATIPURAM RAEBARELI | ₹44.3 L | L2 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 3 | L3₹45.4 LRejected-Finance | ₹45.4 L | L3 | Rejected-Finance REJECTED BEING HIGHER RATE |
Updated dates
Tender Value
₹56 L
EMD Value
₹4.8 L
Closing Date
29 Apr 2026, 12:00 pmClosed
S.E. Lucknow Circle LUCKNOW
S.E. Lucknow Circle LUCKNOW
Missing link between Mohabbat Nagar to Baikhara
2026_CEUCZ_1134498_1
2277/401C-LKOCIR/2025-26 DATED 26.03.2026
Open Tender
Civil Works
180 days
RAEBARELI
Missing link between Mohabbat Nagar to Baikhara
2 documents required · 2 mandatory
₹2,714
₹4.8 L
Yes
S.E. Lucknow Circle LUCKNOW
16 May 2026
8 Apr 2026
29 Apr 2026
8 Apr 2026
29 Apr 2026
8 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | cum | - | - |
Providing ,Laying ,spreading Material on prepared sub grade ,adding cement @2% by weight to the spread material manually ,mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub-base. Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | cum | - | - | |
Providing ,Laying ,spreading Material on prepared sub grade ,adding cement @ 4% by weight to the spread material manually ,mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of base.Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | cum | - | - | |
Construction of shoulder with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | cum | - | - | |
Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | Sqm | - | - | |
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates from Kabrai quarry with using VG_10 @ 1.46 Kg per Sqm bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | Sqm | - | - | |
Providing and laying seal coat composed of 6.7 mm aggregates from Kabrai quarry with using VG_10 @ 0.65 Kg per Sqm bitumen to required sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type 'C'. Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | Sqm | - | - | |
Providing,laying and fixing of reinforced concrete pipe 600 mm dia NP3 for culvert on first class bedding of granular material in single row with cement mortar1:2(1cement: 2 coarse sand) [as per MORD specification no. 9.3-1100(B)] Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | Rm | - | - | |
Providing,laying and fixing of reinforced concrete pipe 450 mm dia NP3 for culvert on first class bedding of granular material in single row with cement mortar1:2(1cement: 2 coarse sand) [as per MORD specification no. 9.3-1100(B)] Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | Rm | - | - | |
Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. As per mord Spe-800 Including all material, labour & T&P with all taxes etc. complete but excluding GST | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
T2.pdf
Tender Documents • 1.09 MB
BOQ_2117954.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid