| 1 | Admitted-Finance 210 FIRST FLOOR PHASE III OKHLA INDUSTRIAL AREA DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | Admitted-Finance |
Tender Value
₹28.2 L
EMD Value
₹56,500
Closing Date
25 Oct 2023, 3:00 pmClosed
Executive Engineer (ED-1)
Works Department, IIT Delhi, Hauz Khas, New Delhi - 110016
Comprehensive Maintenance of 3 x 150TR and 3 x 200TR Capacity Screw Chiller in Sahyadri and Saptagiri and Dronagiri Hostel at IIT Delhi
2023_IIT_776234_1
IITD/WORKS (SP- 4375)/2023
Open Tender
Miscellaneous Works
Works
365 days
Indian Institute of Technology Delhi
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹56,500
16 Nov 2023
13 Oct 2023
26 Oct 2023
13 Oct 2023
25 Oct 2023
13 Oct 2023
Amount
Comprehensive maintenance [including routine & preventive] and break down maintenance of high side & low side of the Air conditioning plant comprising of all the machinnery (Main chiller unit evaporator, condenser, compressor, primary and secondary chiller pumps, condenser pumps, VFDs, Electrical components, pressure and temperature gauges, valves etc.), equipment installed in the AC Plant room including Cooling Towers as per maintenance schedule attached at Annexure - H. 3 x 150TR Capacity (for Sahyadri hostel) N.B. :- [1] In case of Breakdown of any chiller, the contractor will attend the same within 08 hrs failing which a compensation amounting to Rs. 2000/- per day shall be imposed on the firm and be deducted from the bill of contractor to be paid, subject to maximum 10% of the contract amount and after that the same shall be got done at the risk and cost of the contractor. [2] If refrigerant is required for refilling, contactor will have to provide refrigerant for refilling. Leak testing and leak repairing are also to be done by the contractor. [3] Descaling of condenser atleast once in a year and as and when so required. [one job means per each machine per month]
Comprehensive maintenance [including routine & preventive] and break down maintenance of high side & low side of the Air conditioning plant comprising of all the machinnery (Main chiller unit evaporator, condenser, compressor, primary and secondary chiller pumps, condenser pumps, VFDs, Electrical components, pressure and temperature gauges, valves etc.), equipment installed in the AC Plant room including Cooling Towers as per maintenance schedule attached at Annexure - H. 3 x 200TR Capacity (for Saptagiri & Dronagiri Hostel) N.B. :- [1] In case of Breakdown of any chiller, the contractor will attend the same within 08 hrs failing which a compensation amounting to Rs. 2000/- per day shall be imposed on the firm and be deducted from the bill of contractor to be paid, subject to maximum 10% of the contract amount and after that the same shall be got done at the risk and cost of the contractor. [2] If refrigerant is required for refilling, contactor will have to provide refrigerant for refilling. Leak testing and leak repairing are also to be done by the contractor. [3] Descaling of condenser atleast once in a year and as and when so required. [one job means per each machine per month]
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .