| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.6 LAccepted-AOC FATEHABAD HGVY | FATEHGARH SAHIB | PUNJAB | 140402 | ₹11.6 L | L-1 | Accepted-AOC LOWEST |
| 2 | L-2₹13.0 L+₹1.4 L (11.9%)Rejected-AOC | ₹13.0 L+₹1.4 L (11.9%) | L-2 | Rejected-AOC SECOND HIGHEST |
| 3 | L-3₹15.2 L+₹3.7 L (31.5%)Rejected-AOC 528 PREETI NAGAR 125001 | HISAR | HARYANA | 125001 | ₹15.2 L+₹3.7 L (31.5%) | L-3 | Rejected-AOC HIGHEST |
| 4 | Rejected-Technical | - | - | Rejected-Technical not eligible by comittee |
| 5 | Rejected-Technical | - | - | Rejected-Technical not eligible by comittee |
Tender Value
₹15.3 L
EMD Value
₹30,700
Closing Date
27 Oct 2022, 11:00 amClosed
XEN/CMD-I
RGTPP,KHEDAR,HISAR
REPAIR WORK AND PAINTING OF BOUNDARY WALL FROM MAIN GATE TO COLONY GATE AT RGTPP, KHEDAR, HISAR
2022_HBC_240046_1
6/XEN/CMD1/RGTPP DT19.9.22
Open Tender
Civil Works
Works
180 days
RGTPP, KHEDAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹30,700
Yes
15 Feb 2023
19 Sept 2022
29 Oct 2022
19 Sept 2022
27 Oct 2022
19 Sept 2022
Amount
Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power-driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 50 mm average thickness
Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power-driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 25 mm average thickness
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust-free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars up to 12 mm diameter
Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust-free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter
Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make
Rebarring work with 10ml inject able mortar epoxy adhesive (Hybrid Urethane Methacrylate adhesive) or chemical compound of make as approved by Engineer-in-Charge complete in all respect including drilling and cost of all materials 8 mm dia (hole size 12 mm dia & depth up to 80 mm)
Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. 25 mm average thickness in 2 layers. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/sqmm2).
Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. 50 mm average thickness in 3 layers. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/sqmm2).
Centering and shuttering with 12mm thick shuttering plywood confirming to IS 4990:2011 and removal of form at all heights. Plywood will be supported on lock bars.
Providing and laying 75mm thick in Grade M 25 with cement content not less than 330 kg per cum SBR Polymer modified (of approved make @ minimum 2% by wt. of cement used) plain/reinforced concrete jacket for the structural members e.g. columns, pillars, piers, beams etc with concrete having the specified minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] with specified average thickness all-round existing core of RCC member.Note: Rates shall be for finished surface area of concrete and shall include the cost of making holes in existing RCC slab, if required, for pouring concrete in shuttering mould of jacket and appropriate approved Super-Plasticiser for rendering concrete as flow able self-compacting and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering, strutting, propping etc (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/tapping with a blunt metal instrument)
15 mm cement plaster on the rough side of single or half brick wall of mix: 1:6 (1 cement: 6 fine sand)
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm)
Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litres/10 sqm complete including cost of Priming coat.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Note: - Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
Laying of first-class ash brick laid in cement sand mortar 1:6 in foundation and plinth including loading, unloading, stacking, carriage within a lead of 4 KM. (Fly ash bricks to be provided by HPGCL)
M/S M.S. CONTRACTOR
TANUJ AGARWAL CONTRACTOR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .