Tender Value
₹2.0 Cr
EMD Value
₹6.0 L
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE
Ghaziabad Nagar Nigam
Road improvement work from Raju Sweets AND Caterers to Road No. 03 in Govindpuram under Kavinagar Zone area.
2026_DOLBU_1194229_112
133/Nirman/2026-27 Date 28.09.2026
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,740
₹6.0 L
8 Oct 2026
8 Oct 2026
26 Oct 2026
8 Oct 2026
26 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in- charge within a distance of 60 metre (200 feet). PWD SOR 2022 17.3 | 10.63 | CUM | 1,340 | ₹14,240.45 |
| 2 | Desmantling of old brick work etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2022 PAGE NO 47 SI NO 17.02 ITEM NO 692.) | 24.6 | CUM | 600 | ₹14,762.55 |
| 3 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 | 640 | CUM | 110 | ₹70,400 |
| 4 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231( a). | 320 | CUM | 195.1 | ₹62,432 |
| 5 | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } | 51.2 | CUM | 4,000 | ₹2,04,800 |
| 6 | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) | 248.8 | CUM | 8,640 | ₹21,49,632 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars DSR 2023 ITEM N. 5.22.1 | 195.31 | QTL | 8,166 | ₹15,94,885.13 |
| 8 | Scraping old painted surface including disposal of all scraped material to a distance of 30 meters (100 ft.) as directed by Enginer in-charge. (by machnical) | 24,000 | SQM | 15 | ₹3,60,000 |
| 9 | Providing laying spreading and compecting graded stone aggregate to wet mix macadam specification including premixing the material with at OMC in machenical mix plant carriage of mix material by tipper to site laying in uniform layers of each 100mm thick with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 512 | CUM | 4,066.2 | ₹20,81,894.4 |
| 10 | Construction of un-reinforced, dowl jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 40(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine. Technical Specification Clause
1501 ( SOR 2022/20.12) | 972.8 | CUM | 8,580 | ₹83,46,624 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.44 MB
BOQ_2254649.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .