Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.7 L+₹72,893.20 (2.52%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance L2 | |
| 3 | L3₹30.3 L+₹1.4 L (4.93%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BABLU SINHA L1 | SABIR CONSTRUCTION L3 | NANDI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Salavging of 1000mm,180 mtr length 1x110kW belt conveyor of B19C panel of RVI seam. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Dismantling, Loading , carrying, transportation of discharge unit with required girders from mentioned belt conveyor to surface -3MT using DA and Oxygen | 3 | MT | 14,168 ₹42,504 Lowest | 14,861 ₹44,583 | 14,526 ₹43,578 |
| 1.02 | Dismantling, Loading, carrying, transportation of heavy duty drive head from mentioned belt conveyor to surfac -10.5MT using DA and Oxygen | 10.5 | MT | 14,168 ₹1,48,764 Lowest | 14,861 ₹1,56,040.5 | 14,526 ₹1,52,523 |
| 1.03 | Dismantling, Loading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from mentioned belt conveyor to surfac -1MT using DA and Oxygen | 1 | MT | 14,168 ₹14,168 Lowest | 14,861 ₹14,861 | 14,526 ₹14,526 |
| 1.04 | Dismantling, Loading, carrying, transportation of 180 mtr structure frommentioned belt conveyor to surfac -@ 110 kg per mtr | 19.8 | MT | 14,168 ₹2,80,526.4 Lowest | 14,861 ₹2,94,247.8 | 14,526 ₹2,87,614.8 |
| 1.05 | Dismantling, Loading, carrying, transportation of belting from mentioned belt conveyor to surface | 360 | Meter | 202 ₹72,720 Lowest | 212 ₹76,320 | 207 ₹74,520 |
| 1.06 | Dismantling, Loading, carrying, transportation of loop take up from mentioned belt conveyor to surfac-4.75MT using DA and Oxygen | 4.75 | MT | 14,168 ₹67,298 Lowest | 14,861 ₹70,589.75 | 14,526 ₹68,998.5 |
| 1.07 | Dismantling, Loading, transportation of control cable & assy from mentioned belt conveyor to surfac | 1 | nos | 30,360 ₹30,360 Lowest | 31,845 ₹31,845 | 31,128 ₹31,128 |
| 1.08 | Dismantling, Loading, carrying, transportation electrical ACB, starter, cable (power and control) from mentioned belt conveyor to surfac | 1 | sets | 50,602 ₹50,602 Lowest | 53,076 ₹53,076 | 51,882 ₹51,882 |
| 1.09 | Cleaning of coal for Discharge, Drive, Hopper & Tail end set from 37WL belt conveyor | 40 | Head | 1,280.95 ₹51,238 Lowest | 1,350 ₹54,000 | 1,313 ₹52,520 |
Tender Value
₹28.9 L
EMD Value
₹36,200
Closing Date
24 Oct 2025, 5:00 pmClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Salvaging of three nos. of Belt Conveyors of B20C, B20B and B19C panel of RVI seam of Khottadih Colliery under Pandaveswar Area.
2025_ECL_345290_1
GM-PND/EandM/25-26/149/799 dated 09/10/2025
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹36,200
23 Dec 2025
9 Oct 2025
25 Oct 2025
9 Oct 2025
24 Oct 2025
9 Oct 2025
9 Oct 2025 - 17 Oct 2025
Amount
Salavging of 1000mm,180 mtr length 1x110kW belt conveyor of B19C panel of RVI seam. (Inclusive of EPF/CMPF)
Dismantling, Loading , carrying, transportation of discharge unit with required girders from mentioned belt conveyor to surface -3MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of heavy duty drive head from mentioned belt conveyor to surfac -10.5MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from mentioned belt conveyor to surfac -1MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of 180 mtr structure frommentioned belt conveyor to surfac -@ 110 kg per mtr
Dismantling, Loading, carrying, transportation of belting from mentioned belt conveyor to surface
Dismantling, Loading, carrying, transportation of loop take up from mentioned belt conveyor to surfac-4.75MT using DA and Oxygen
Dismantling, Loading, transportation of control cable & assy from mentioned belt conveyor to surfac
Dismantling, Loading, carrying, transportation electrical ACB, starter, cable (power and control) from mentioned belt conveyor to surfac
Cleaning of coal for Discharge, Drive, Hopper & Tail end set from 37WL belt conveyor
salavging of 1000mm,240 mtr length 1x110kW belt conveyor of B20C panel of RVI seam. (Inclusive of EPF/CMPF)
Dismantling, Loading , carrying, transportation of discharge unit with required girders from mentioned belt conveyor to surface -3MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of heavy duty drive head from mentioned belt conveyor to surfac -10.5MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from mentioned belt conveyor to surfac -1MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of 240 mtr structure frommentioned belt conveyor to surfac -@ 110 kg per mtr
Dismantling, Loading, carrying, transportation of belting from mentioned belt conveyor to surface
Dismantling, Loading, carrying, transportation of loop take up from mentioned belt conveyor to surfac-4.75MT using DA and Oxygen
Dismantling, Loading, transportation of control cable & assy from mentioned belt conveyor to surfac
Dismantling, Loading, carrying, transportation electrical ACB, starter, cable (power and control) from mentioned belt conveyor to surfac
Cleaning of coal for Discharge, Drive, Hopper & Tail end set from 37WL belt conveyor
Salavging of 1000mm,210 mtr length 1x110kW belt conveyor of B20B panel of RVI seam. (Inclusive of EPF/CMPF)
Dismantling, Loading , carrying, transportation of discharge unit with required girders from mentioned belt conveyor to surface -3MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of heavy duty drive head from mentioned belt conveyor to surfac -10.5MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of tail end assuy along with V scapper tail end guard decking plate from mentioned belt conveyor to surfac -1MT using DA and Oxygen
Dismantling, Loading, carrying, transportation of 210 mtr structure frommentioned belt conveyor to surfac -@ 110 kg per mtr
Dismantling, Loading, carrying, transportation of belting from mentioned belt conveyor to surface
Dismantling, Loading, carrying, transportation of loop take up from mentioned belt conveyor to surfac-4.75MT using DA and Oxygen
Dismantling, Loading, transportation of control cable & assy from mentioned belt conveyor to surfac
Dismantling, Loading, carrying, transportation electrical ACB, starter, cable (power and control) from mentioned belt conveyor to surfac
Cleaning of coal for Discharge, Drive, Hopper & Tail end set from 37WL belt conveyor
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE (BID ID -1190977)
SABIR CONSTRUCTION (BID ID -1190986)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .