Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.8 LAccepted-AOC 52 H NEW COLONY ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹65.8 L Quoted ₹55.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹55.8 L+₹6,698.79 (0.12%)Rejected-Finance JAMUNIPUR SAKALDIHA CHANDAULI | CHANDAULI | CHANDAULI | UTTAR PRADESH | ₹55.8 L+₹6,698.79 (0.12%) | L2 | Rejected-Finance Rejected |
Tender Value
₹66.5 L
EMD Value
₹1.3 L
Closing Date
15 May 2026, 12:00 pmClosed
SE RED Ayodhya Circle
SE RED Ayodhya Circle, Bada Ramana, Reedganj, Ayodhya
Under District Sultanpur, Construction of CC road from house of Mr. Sanjay Verma to the Ayodhya border in village Ismailpur, Lot No 11
2026_REDUP_1146117_11
03/SE RED Ayodhya/Sultanpur/25-26 Dt 01/04/2026
Open Tender
Civil Works
Percentage
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.3 L
SE RED Ayodhya Circle
31 Jul 2026
7 May 2026
15 May 2026
7 May 2026
15 May 2026
7 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | - | Cum. | 181.81 | - |
| - | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements | 1 | Cum. | 182.87 | ₹182.69 |
| - | Excavation for roadway soil usig maual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per technical Specification Clause 302.3 | - | Cum. | 114 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of formwork | - | sqm. | 313.5 | - |
| - | Providing and laying plain concrete in open foundations complete as per drawings and technical specifications (1:4:8) | - | Cum. | 5,690.5 | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1½ coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | - | Cum. | 7,714 | - |
| - | Mild steel or iron in plain work shch as reinforced concrete work i/c cutting , bending for proper completion of the work . SI No. 504 | - | Qtl. | 7,957.2 | - |
| - | Brick Masonry Work in Cement Mortar 1:4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.600 &1200 | - | Cum. | 5,953.65 | - |
| - | Pointing with cement mortar (1:3) on brick work as per drawing and technical spacification clause 613.3 and 1204 | 1 | sqm. | 74.1 | ₹74.03 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
Tendernotice_2.pdf
PDF • 3.17 MB
BOQ_2143151.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .