Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC P O SALANPUR DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713357 | SALANPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713357 | ₹4.8 L | L1 | Accepted-AOC Being L1 bidder work is awarded. |
| 2 | L2₹5.1 LRejected-Finance CHITTRANJAN ROAD NEAMATPUR P O SITARAMPUR DIST PASCHIM BARDHAMAN PIN 713359 | SITARAMPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | ₹5.1 L | L2 | Rejected-Finance As per TC committee recommendation |
| 3 | L3₹5.1 LRejected-Finance LALGANJ PO LALGANJ SALANPUR 713359 WEST BENGAL INDIA | SALANPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | ₹5.1 L | L3 | Rejected-Finance As per TC committee recommendation |
| Sl No | Description | Qty | Unit | MAJI ENTERPRISE L2 | M/S SHASTI ENTERPRISE L3 | NEW SANTI CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Dismantling of 3 No.O.H Line from 11 KV Kasidanga S/S to 4 point junction at Gourangdi Begunia Colliery ,Salanpur Area. | ||||||
| 1.10 | Dismantling of 3 phase 4 wire 3.3 KV O.H Line from 11KV Kasidanga S/S to 4 point juntction (Highly skilled-1, Skilled-2, Unskilled-7) | 4 | Days | 7,229 ₹28,916 | 7,229 ₹28,916 | 7,229 ₹28,916 |
| 1.20 | Dismantling of 3 phase 5 wire 440 V O.H Line from 11 KV Kasidanga S/S to 4 point junction (Highly Skilled-1, Skilled-2, Unskilled-7) | 3 | Days | 7,229 ₹21,687 | 7,229 ₹21,687 | 7,229 ₹21,687 |
| 1.30 | Dismantling of 3 phase 4 wire 220 V O.H. Line from 11 KV Kasidanga S/S to 4 point junction (Highly Skilled-1
Skilled-2, Unskilled-7 ) | 2 | Days | 7,229 ₹14,458 | 7,229 ₹14,458 | 7,229 ₹14,458 |
| 2.00Re-erection & Drawing of 3 No. O.H. Line from 4 point Junction to extended coal depot of Gourangdi Begunia Colliery, Salanpur Area:- | ||||||
| 2.01 | Supply of 8 mtr. PCC Pole | 15 | Nos | 4,500 ₹67,500 | 4,500 ₹67,500 | 4,500 ₹67,500 |
| 2.02 | Supply of ACSR Rabbit Conductor for 3 phase of 3.3 KV line & 440 V line (200 Mtrs. x6) | 1,200 | Mtrs | 55 ₹66,000 | 55 ₹66,000 | 55 ₹66,000 |
| 2.03 | Supply of ACSR weasel Conductor for continious running Earth for 3.3 KV & 440 V line ,neutral conductor for 440 V & for 2 phase 220 V Line (200 Mtrs x 5) | 1,000 | Mtrs | 80 ₹80,000 | 80 ₹80,000 | 52 ₹52,000 |
| 2.04 | Supply of HT grade pin Insulator | 10 | Nos | 250 ₹2,500 | 250 ₹2,500 | 250 ₹2,500 |
| 2.05 | Supply of HT grade disc insulator | 8 | Nos | 650 ₹5,200 | 650 ₹5,200 | 650 ₹5,200 |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
17 Dec 2025, 11:00 amClosed
AE EandM
Office of AE EandM
Dismantling of 3 no OH line from 11 KV Kasidanga SS to 4 point junction at Gourangdi Begunia Colliery, Salanpur Area. Reerection and Drawing of 3 number OH line from 4 point junction to extend coal depot of Gourangdi Begunia colliery under Salanpur A
2025_ECL_348778_1
ECL/SLN/GM/EnM/ etender/25-26/36, dt. 02.12.25
Open Tender
Electrical and Maintenance Works
15 days
Bonjemihary ocp
6 documents required · 6 mandatory
₹7,000
15 Apr 2026
5 Dec 2025
18 Dec 2025
5 Dec 2025
17 Dec 2025
5 Dec 2025
5 Dec 2025 - 12 Dec 2025
Dismantling of 3 No.O.H Line from 11 KV Kasidanga S/S to 4 point junction at Gourangdi Begunia Colliery ,Salanpur Area.
Dismantling of 3 phase 4 wire 3.3 KV O.H Line from 11KV Kasidanga S/S to 4 point juntction (Highly skilled-1, Skilled-2, Unskilled-7)
Dismantling of 3 phase 5 wire 440 V O.H Line from 11 KV Kasidanga S/S to 4 point junction (Highly Skilled-1, Skilled-2, Unskilled-7)
Dismantling of 3 phase 4 wire 220 V O.H. Line from 11 KV Kasidanga S/S to 4 point junction (Highly Skilled-1 Skilled-2, Unskilled-7 )
Re-erection & Drawing of 3 No. O.H. Line from 4 point Junction to extended coal depot of Gourangdi Begunia Colliery, Salanpur Area:-
Supply of 8 mtr. PCC Pole
Supply of ACSR Rabbit Conductor for 3 phase of 3.3 KV line & 440 V line (200 Mtrs. x6)
Supply of ACSR weasel Conductor for continious running Earth for 3.3 KV & 440 V line ,neutral conductor for 440 V & for 2 phase 220 V Line (200 Mtrs x 5)
Supply of HT grade pin Insulator
Supply of HT grade disc insulator
Supply of Shackle insulator
Supply of MS channel/angle/flat etc for fabrication of MS bracket to hold insulator & wire
Supply of Stay set
Supply of different size MS nuts bolts and washers
Labour Cost in Erection of PCC pole ,Acsr Conductor ,fitting of insulator ,MS bracket
Supply & fitting of suitable grade lighting Arrestor (3 Nos. per set)
Add: Other Expenses
Add: Provident fund on Labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_361532.pdf
BOQ Comparative Chart
xlsx
finsummary_361532.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 1.77 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_361532.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid