Loading…
Loading…
Tender Value
₹13.2 L
EMD Value
₹1.3 L
Closing Date
11 Aug 2026, 5:00 pm
EEMI JHANSI
KANPUR ROAD JHANSI
CHECKDAM REPAIR BASARIYA VILLAGE BASARIYA MAURANIPUR GEN 7
2026_UPMID_1172608_7
03/CDR/MMLSY/2026-27
Open Tender
Civil Works
Percentage
60 days
JHANSI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,266
EEMI DIVISION JHANSI
₹1.3 L
Yes
28 Jul 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description | - | - | - | - |
| 1 | DEWATERING BT 8 HP DIESEL PUMP ST | - | HRS. | 1 | - |
| - | DISMENTALLING OF CC & RCR/RR STONE MASONARY WORK (IRR.CHA.6.6, 12&6.14) | 1 | cum | 1 | ₹1 |
| - | EARTH WORK EXCAVATION IN MAR KABAR RANKAR & KANKAR MIXED HAD SOIL UP TO 1.50 MT LIFT & 3.0 MT LEAD I/C ALL. | - | cum | - | - |
| - | CONCRETE WITH CEMENT.SAND AND 40MM GAVGE STONE BALLAST PROPORTION OF 1;3;6 IN FOUNDATION AND FLOOR INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | - | cum | - | - |
| - | RANDOM COURSED RUBBLE STONE MASONARY WITH APPRROVED QUARRY STONE KHANDA, SAND AND CEMENT IN PROPORTION OF 1:4CEMENT SADN MORTER IN FOUNDATION INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK. | 1 | cum | 1 | ₹1 |
| - | R.R. STONE MASONARY WORK WIIH HARD STONE BOLDAR IN 1:4 CEMENT AND COARSE SAND MORTAR | 1 | cum | 1 | ₹1 |
| - | CONCRETE WITH CEMENT,SAND & 20 MM GAUGE STONE GRIT IN PROPORTION OF 1:2:4 ON FLOOR INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | - | cum | - | - |
| - | PLASRER WITH CEMENT SAND MORTAR IN 1:2 (ONE CEMENT AND TWO LOCAL SAND ) INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | - | sqm | 1 | - |
| - | RAISED CEMENT POINTING WITH CEMENT SAND MORTAR CONSISTING 1 PART CEMENT AND 2 PARTS OF APPROVED SAND ON STONE WORK INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK | 1 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.14 MB
Tendernotice_2.pdf
PDF • 1.24 MB
BOQ_2202067.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].