Loading…
Loading…
Tender Value
₹42.5 L
EMD Value
₹85,063
Closing Date
15 Jun 2026, 4:00 pmClosed
Executive Engineer,
Buildings and Roads Division, PWD, Karaikal
Construction of Synthetic Tennis Court Asphalt base - 8 Layers at Karaikal District Stadium, Karaikal.
2026_PWDC3_22267_1
04/PW/BRK/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
karaikal
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹85,063
16 Jun 2026
3 Jun 2026
16 Jun 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil | 59 | 1 Cum (One Cubic Metre) | 272.13 | ₹16,055.67 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and all lift | 19.5 | 1 Cum (One Cubic Metre) | 165.29 | ₹3,223.15 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 180 | 1 Sqm (One Square Metre) | 16.2 | ₹2,916 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) | 12.5 | 1 Cum (One Cubic Metre) | 6,510.91 | ₹81,386.38 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns,piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping,bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) | 25.5 | 1 Cum (One Cubic Metre) | 9,234.28 | ₹2,35,474.14 |
| 6 | Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns | 24 | 1 Sqm (One Square Metre) | 409.56 | ₹9,829.44 |
| 7 | Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 380 | 1 Sqm (One Square Metre) | 847.05 | ₹3,21,879 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 fine aggregate : 3 graded stone aggregate 20 mm nominal size) | 14 | 1 Cum (One Cubic Metre) | 8,987.51 | ₹1,25,825.14 |
| 9 | Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more | 1,540 | 1 Kg (One Kilogram) | 111.27 | ₹1,71,355.8 |
| 10 | Providing and fixing of 65 mm Navatal lock of 7 levers with 3 keys etc complete | 2 | 1 No (One Number) | 692.1 | ₹1,384.2 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
Tendernotice_2.pdf
PDF • 2.33 MB
Tendernotice_3.pdf
PDF • 2.48 MB
BOQ_22729.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .