| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 LAccepted-AOC | L1 | Accepted-AOC Responsive | |
| 2 | L2₹51.4 L+₹3.8 L (7.93%)Rejected-AOC VILL JAMUGURI P O BANPUROI DIST LAKHIMPUR ASSAM | LAKHIMPUR | ASSAM | 784165 | L2 | Rejected-AOC Non-responsive | |
| 3 | Rejected-Technical | - | Rejected-Technical TECHNICALLY NON RESPONSIVE |
Tender Value
₹45.4 L
EMD Value
₹90,734
Closing Date
27 Feb 2024, 2:00 pmClosed
MISSION DIRECTOR, SAMAGRA SHIKSHA, ASSAM
Kahilipara, Guwahati-19
Design fabrication supply installation and commissioning of passenger lift 8 person including civil and structural works for construction of New Lift Structure at the State Mission Office Samagra Shiksha, Assam Kahilipara Guwahati
2024_SSA_36358_1
No. SS/CW/SMO/LIFT/50/2024/140
Open Tender
Civil Works - Building
Works
45 days
Kahilipara
As per bidding document
5 documents required · 5 mandatory
₹908
₹90,734
Yes
O/O THE MD, SS, ASSAM
20 Mar 2024
17 Feb 2024
27 Feb 2024
17 Feb 2024
27 Feb 2024
17 Feb 2024
17 Feb 2024 - 19 Feb 2024
19 Feb 2024
Amount
Dismantling works Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead: Of area 3 sq. metres and below
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Civil works for lift shaft SUB HEAD-I :- EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
SUB HEAD-II :- CONCRETE WORKS Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources)
SUB HEAD-III :- REINFORCED CEMENT CONCRETE WORK FORM WORK : Centring and shuttering including strutting,propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Suspended floors, roots, landings, balcnies and access platform.
STEEL REINFORCEMENT Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth & above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level: Concrete of M25 grade with minimum cement content of 330 kg /cum
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
SUB HEAD : BRICKWORK Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand)
SUB HEAD : STEEL WORK Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium item.s The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.
FLOORING WORK 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade pigment using white cement
FINISHING WORK 12 mm cement plaster of mix: 1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix: 1:6 (1 cement: 6 fine sand)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. Two or more coats on new work
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
8 Passenger lift Design, manufacture, supply, installation, testing and commissioning of following Passenger Lift of 8 Persons (544Kg) Gearless and Machine Roomless having speed (min) 1.0 m / s stainless steel body, automatic power operated, center opening stainless steel power door with vision panel, Granite flooring finish, variable voltage and variable frequency drive with microprocessor based simplex full collective control, fitted with direction and position indicator, emergency light & alarm bell, battery operated emergency rescue device and infra-red door safety system as per specification including the cost of cartage, labour, electrician etc. complete as per the direction of the department. Make: OTIS/ KONE/ SCHINDLER/ JOHNSON/ MITSUBISHI
RAJENDRA MALLA
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .