Loading…
Loading…
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
16 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
With the submission of the certificate/affidavit as mentioned, the practice of verification of tenderer's documents by the Railway dispensed with. Instruction for bidders, in this regards are:
Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification of lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD),Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
With such a system of self-certification of credentials, tender finalization should also be speeded up. The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender.
149 conditions · 4 needing a document upload
Any payment required for E-Tendering is accepted through Net Banking or Payment Gateway only.
Credentials in support of fulfillment of eligibility criteria ( Without these documents the offer is liable to be rejected) as per details stipulated in Tender documents. Each and every pages of the supporting documents should be signed with proper seal and date.
Details of technical personnel with qualification and experience employed by the firm.
Details of special equipments , tools and plants, machinery etc available with the firm for execution of contract works.
If working through contract labour , the contractor must resgister with Labour Commissioner and necessary license to be submitted with tender or to be produced before signing of contract agreement.
Partnership deed, if any, constitution of the firm and copies of power of attorney and other connected legal documents to be submitted.
Submission of requisite information for Financial Eligibility criteria as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All required documents duly attested as per Para 14.0 of IRGCC must be submitted.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Execution of Signaling & Telecommunication work in connection with: (1) Construction of new 10 rooms (20 bedded) Running Room at Bhatapara in Raipur Division, (2) Construction of new 15 rooms (30 bedded) Running Room at Dallirajhara in Raipur Division, (3) Construction of new combined crew lobby at Dallirajhara, (4) Provision of deficiencies of MEA at KMI, MDH & SLH, (5) Augmentation of existing amenities to facilitate Re-Development work at passenger interface area of Raipur Station, (6) Improvement of Mandirhasaud (MNDH) Goods Shed, (7) Provision of MEA at DGS & DPH, (8) Improvement of facilities at RSD Goods Complex of Raipur Division, (9) Augmentation of facilities in Diesel Loco Shed, Raipur for homing of electric locomotives, (10) Provision of CCTV Cameras, Portable weighing Machine, Stacker Machine and Hand Pallet Trucks at Raipur and Durg Stations (PF No. 4 & 5) for Parcel Activities.
SNT-R-2026-15~SECR
SNT-R-2026-15
Open
Works - General
12 Months
Raipur, Chhattisgarh
₹0
₹6.3 L
19 Sept 2026
19 Sept 2026
2 Oct 2026
198 items across 2 schedules · ₹3,17,18,081.24 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trench Depth 1.0 Mtr. & width 0.3 Mtr and clearing of roots oftrees, bushes, ballast and reconditioning etc., including bailing out waterand disposal of extra soil in all soils including soft rocky area. | Kilometre | 3.30 | 76,590 | 2,52,747 |
| 2 | Excavation of trench in all kinds of soils including softrockyarea andclearing of roots of trees, bushes, rocks,ballastetc., to a depth of 1 Mtr. &width 0.3M for track/puccaroad/Platform crossing/ level crossing and anyother placeasadvised by the Engineer- inchargeincludingsupply,transportation and laying of RCC pipe withcollars(forjointing pipe) 150mm nominal dia to Spec.No:IS-458intrench anddrawing of Signalling/ Power/ Quadcablesthrough pipe including back fillingand ramming aftercablelaying as specified in Technical Circular No.2of1988issued by CSTE/S.E.Rly. This includes repairingandplastering ofplatform/pucca road after cable laying.RCCpipe shall be inspected by theRep.of Sr. DSTE /Rbeforelaying. NOTE:- Power cable,signalling cable,Quadcable asmentioned above,where required shall be laid in thesametrench as signalling cable but in a separate pipe. | Metre | 100.00 | 1,008.8 | 1,00,880 |
| 3 | Laying and Fixing of galvanised iron pipe (GI Pipe) withthreadedcollars (forjointing pipe) of 80 mm nominal diaSpec.No.IS-1239medium grade, onbridges, culverts, drainsincluding supply andtransportation of GI pipes andall othermaterials required forfixing the pipe to Drg.No.Con/SK/T/2anddrawing ofSignal/Power/Quad cables inside the pipewith masonaryworksover the entire length of the bridge andat entry and exit of theculvertand curing for 72 hrs, drillingof holes on the pipe at 10 cmapart to beclamped 2 Mtrsapart on culvert, for the Signalling,quad, power cable. | Metre | 258.00 | 761 | 1,96,338 |
| 4 | Excavation of trench and clearing of roots of trees, bushes,ballastandreconditioning etc., including bailing out waterand disposal ofextra soil inHard rocky area includingconcreting. Chase cuttingand smoothening ofinside surfaceof sizes 0.08 m deep and 0.17m width at platformandcemented floor area. | Metre | 630.00 | 115 | 72,450 |
| 5 | Excavation of trenches including clearing of roots oftreesetc. in hard rockysoil by chiseling up to a depth of0.5m to0.8 Mtr. At the bottom, supply andplacing half roundRCCpipe on sieved soil of 30 mm over cableandconcretingthroughout the lenght upto a layerof 75mmapproximately(1:2:4) , as advised by the site engineer &Guide linesonSignalling cable Laying issued by SignalDirectorateResearch,Design &Standards organisationMinistry ofRailways Manak Nagar Lucknow-226011,Version-1.0,Effective from dt 31.10.2011 . Thendigging andbackfillingthe trench by digging and carryingearth from a lead ofmaximum30Mtrs and then ramming thesoil after cablelaying. This includes supply ofhalf round RCCpipe. | Metre | 1450.00 | 274.32 | 3,97,764 |
| 6 | Excavation of trench and clearing of roots of trees, bushes,ballastandreconditioning etc., including bailing out waterand disposal ofextra soil.Track crossing, Road Crossing bypushing method(HDD method) at culverts/track / puccaroad crossing at a depthnot less than 1 meter withreferenceto bottom of rail/road surfaceincluding supply of GI pipe with76mm dia, Spec. No. - 1239medium grade (for the length ofpushing morethan 05 meters). | Metre | 285.00 | 2,246 | 6,40,110 |
| 7 | Brick wall with modular bricks with cement mortar 1:6 (1 cement: 6 fine sand) for protection of relay room and other service buildings of panel interlocking. | cum | 20.00 | 2,070.7 | 41,414 |
| 8 | Laying of Signalling Cable/Power/Quad cable / PIJF cableinthe excavatedtrench toDrg.No:CON/SK/T/5.Transportation,supply of 'U' clampsandanchoring of cable at every 10 Mtrswith 'U' clamptoDrg.No:CSTE/C/Cable/81 including backfilling withexcavated earth andramming of trenches aftercablelaying. Note: The contractor has to conductdetailedsitesurvey of the cable route, prepare a plan to get approvaloftheRailway, putting white lime powder markingbeforeexcavation of earthunder supervision ofrailways authorised representative. | Kilometre | 10.20 | 16,740 | 1,70,748 |
| 9 | The excavation of pit, casting of concrete foundationincludingsurroundingearthwork along the foundation,erection, installationand wiring of steelappartus case, fixingof terninals, fuse blocks,signal transformer,currenttransformer, filament switching unit,track batterychargers,adjustable/fixed resistances, choke coils,Fuses, Relays, Etypelocks , termination of cables, cableinsertion, wiring todraw 110V ACtherefore in the new apparatuscase asrequired, testing, commissioningincludingsubsequentalterations (if required), bunching of cables,earthing ofcable,armours etc. Painting of the apparatuscase inside and outsideafterclearing the surface thoroughlyand first coating of anti - corrosive paint andsubsequent twocoatings of Alluminium paintoutside and Red Oxideinsideand lettering. 18 mm Hylum sheetfor location box shelf and12 mmfor cable termination in locationbox.Steel appartus case (Large) to Drg.No.CON/SK/T/8 with 4Nos. of foundation bolts 20mm x 460mm to Drg.No. SA-112 A/M or latest. | Numbers | 8.00 | 17,067 | 1,36,536 |
| 10 | Physical tracing and opening/locating of existing workingcables byprecession digging for diversion of cables inconnection with cableclearance for engineering earth workwithout interfering the circuits as perthe advice of Railwaysite engineer. | Metre | 440.00 | 241 | 1,06,040 |
| 11 | Transportation & Execution of following kinds of joints on Quad Cable using thermoshrink jointing kit. Thisalso includes excavation of cable joint pit of size 1.2m x 1.2m x 1.0m in all types of soil for jointing of coppercables, back filling and ramming after jointing. (b) straight through joint on Quad cable/10-20-50 pairs PIJF Cable. | Numbers | 9.00 | 1,385 | 12,465 |
| 12 | Installation, testing and commissioning of Permanent andMaintenance Free Earth pits.Installation charges : Earthpit(1 Set) It includes: (1) Civil works related to earth pitdigging, PMF earth pit installation,,backfilling and chamber making, (2) Materials for chamber including Chamber Cover. | Numbers | 13.00 | 5,882 | 76,466 |
| 13 | Platform bed cutting for cabling.- Laying of 50 mm nominal bore size GI pipes (IS: 1239 -part-1 with latest amendments) after digging on platform bed ( or as decided by the Rly site engineer ) by 8" deep & replacing/ reconditioning back with cement /concrate for uncovered platform area. This includes the supply of 50 mm GI- pipe (IS:1239-part-1, medium ), cement,sand etc. The work to be executed as per the instruction &supervision of the railway site engineer. | Metre | 100.00 | 380 | 38,000 |
| 14 | Cement Concrete of proportion 1:3:6 withgraded aggregate of size 25mm. and below. | cum | 21.00 | 2,943 | 61,803 |
| 15 | Installation, Testing & Commissioning of IP based 4 mega pixel or higher color bullet camera along with Mount. All the accessories and fixing materials including mount required for this installation are to be supplied by contractor within the same cost. | Numbers | 50.00 | 313.55 | 15,677.5 |
| 16 | Track crossing, Road Crossing by pushingmethod (HDD method) at culverts/ track /pucca road crossing at a depth not lessthan 1 meterwith reference to bottom ofrail/road surface including supply ofGI/HDPE pipe. (a) HDPE pipe/DWC pipe(4inch dia) | Metre | 140.00 | 1,080 | 1,51,200 |
| 17 | Fixing of concrete cable route marker at30-40 meter andatdiversion point includingsupply & transportation ofcableroutemarker at site. Detail size & fixing ofcableroute marker should be followed asper drawing no.SDO/Cable laying/020. | Numbers | 80.00 | 415 | 33,200 |
| 18 | Installation, Testing & Commissioning of 32 Channel Network Video Recorder with RAID 5/6 configuration (with 30 days storage as per clause 2.8 of RDSO/SPN/TC/65/2021 Version6.0 or latest).All the accessories and fixing materials required for thisinstallation are to be supplied by contractor within the same cost. | Numbers | 1.00 | 1,589.39 | 1,589.39 |
| 19 | Transportation, installation of opticalfibrejoint closure and splicing of Opticalfibre cable(2 x 24 fibres) and testing,Optical fibre cablesplicing shall be done inthe presence ofRailway's representative.Only joint closureshall issued by theRailway. All othertools/test equipmentsrequired shall bearranged by theContractor. This also includesexcavation ofearth for construction ofmasonary pit ofbricks (inside completeplastered), the innersize of pit 1.2m x 1.2m(depth 0.75m) in alltypes of soils for keepingcable coils at thelocation of OFC joints, fillingthe pit withsand after jointing of cables, ramming andcovering with RCC slab as per Drg. andinstructions of site incharge of Railway. | Numbers | 19.00 | 19,019 | 3,61,361 |
| 20 | Transportation, installation of Optical Fibre termination box/LIU/FDMS/FMS and splicing of Optic Fibre Cable (24 fibre) inside the termination box with provision of taking out fibre of OFC as required. This includes supply of installation accessories (as required) as detailed in technical specification and advised by Railway's Engineer- at-site. This also includes End to End testing of all fibres of the optical fibre cable terminated between cable hut to cable hut of each station. | Numbers | 17.00 | 21,705 | 3,68,985 |
| 21 | Transportation, loading/unloading of OFCfromthe stores of railway to the work sitewithcare, pushing/pulling OFC through theHDPEpipes, sealing of the duct by sealling/capsplugs. The cable is to be laid bymechanisedmeans. At inaccessible placeswheremechanised laying is not possible,the cable isto be laid manually. This alsoincludes testingof cable drums in the storepremises beforetransportation andsubmissions of resultsthereof. Empty cabledrums to be returned bythe contractor. Thecable drums with unusedcable at site to bereturned by the contractorto the storesdepot of Consignee. | Kilometre | 6.20 | 18,672 | 1,15,766.4 |
| 22 | Transportation including loading/unloadingof HDPE pipe from the stores of railway tothework site, laying of the same inexcavatedtrench/already laid GI/RCCpipes/tubes,jointing, levelling and endsealing the pipes. | Kilometre | 7.20 | 7,762 | 55,886.4 |
| 23 | Splicing/Dropping/Termination ofeach fiber/pigtail in LIU/IOBOX/TERMINAL JOINTS throughfusion splicing for termination ofOFC cables. The Fibers terminatedshall be tested and test report(Hard copy and Soft copy ) shall besubmitted to the Railways site Incharge for records. Each fiber shall be properly marked with necessary ferrules/tags. | Numbers | 586.00 | 193.1 | 1,13,156.6 |
| 24 | Fixing of PVC pipes on wall,bridges,platforms etc complete with Uclamps & other necessary fixture,screw etc.This includes supply &fixing of T and otherbends flexible PVC pipes -25mm etc asrequired. | Metre 12550.00 | — | 3.79 | 47,564.5 |
| 25 | Laying of OFC/Power cable/CAT6Cable on wall/ roof/ FOB/ platform structure/ underground through (i)HDPE pipe/PVC conduit/GI pipe/PVC Tray /casing caping with proper clamping arrangement of HDPE /PVC Conduit /Cable or (ii) through underground DWC pipe and cutting of masonry wall to the depth of 0.75m at the entry of room as per instruction of Railway site incharge and repairing masonry wall cement plastering after cable laying, All fixing, clamping, patching, jointing etc. material like couplers,connectors, OFC patch chords,Power cable Joint Box, masonry materials etc. are to be supplied by contractor. The work is to be executed as per the instruction of Railway Site Engineer. | Metre 20845.00 | — | 6.48 | 1,35,075.6 |
| 26 | Installation, Testing & Comissioning of 19"6U Rack. All the accessories and fixingmaterials required for this installation areto be supplied by contractor within thesame cost. | Numbers | 7.00 | 71.94 | 503.58 |
| 27 | Installation, cable termination, testing andcommissioning of 10/20/50 Pair CT Boxes. | Numbers | 5.00 | 786 | 3,930 |
| 28 | Concealed wiring of cat-6 cable/telephonecable/ OFC cable etc in the PVCpipe/PVCchannel by making groove in the wall,fixing the PVC pipe withclamps, nails andplastering and distempering to make it as itwas earlieras per instructions of engineerin-charge. This includes laying and fixingofall the PVC pipes as per colour insystematic way as per instruction ofRly.Engg. at site. required for laying of alltypes of cables forrailnet,telephoneconnection etc., All thesundry items for the work has to besupplied by thecontractor. Railways willsupply telephone cables/Cat-6 cables andPVCpipe/channels. All the telecom cableswill be drawn from the specifiedlocation ,approved drawing. The payment would bemade as per layout ofgrove made in thewall, irrespective of how many pipe(maximum threepipes) are laid and howmany cables drawn through these pipes. | Metre | 700.00 | 63.72 | 44,604 |
| 29 | Laying & dressing of 6- core OFC cable.This includes supply of GI wire asperthesite condition. All other sandry itemsrequired for dressing of the cable tobesupplied by the contractor. The work isto be executed as per theinstruction ofrailway site engineer. | Metre 12800.00 | — | 21.5 | 2,75,200 |
| 30 | Supply and fixing of PVC casing caping25mm x 25mmsizefor indoor wiring. Thisincludes drawal of wires in thecasingcapingand termination of wire at endpoint.Thework shouldbe carried out as perthe instruction of Railway site Engineer. | Metre | 570.00 | 43 | 24,510 |
| 31 | Installation, fixing, wiring & Commissioningof I/O Box work to be executed as perinstruction of Railways representative. | Numbers | 108.00 | 14 | 1,512 |
| 32 | Transportation, Fixing & commissioning ofwall mounting Rack (9U) as per instructionsof site in- charge. | Numbers | 29.00 | 887.1 | 25,725.9 |
| 33 | Transportation, installation, testing and commissioning of CCTV (Non RDSO type) setup as per instruction of railway representative. | Job | 5.00 | 8,871 | 44,355 |
| 34 | Installation, Testing & Commissioning of Layer- 2 PoE/Ethernet Switch (minimum 8+2 port manageable) with 8 nos. 10/100/1000 Mbps Ethernet port,PoE and 2 nos. 1000BaseX SM SFP port with optical modules .All the accessories and fixing materials required for this installation are to be supplied by contractor within the same cost. | Numbers | 44.00 | 2,451.25 | 1,07,855 |
| 35 | Installation, Testing & Commissioning ofSingle mode 1G SFP module compatible toLayer 2 switch. | Numbers | 48.00 | 184.07 | 8,835.36 |
| 36 | Cutting the masonary wall to the depth of0.25m to 0.75m at the entry ofroomplacing of flexible HDPE pipe or G.I.Pipe(including suppply) ofsuitable size as perinstructions ofRailway site in charge andrepairing of masonary wall andcementplastering after the cable is takeninside the flexible HDPE pipe/G.I.Pipe withclamps as per drawingNo.RE/S&T/ALD/SK/161/81. | Numbers | 21.00 | 573 | 12,033 |
| 37 | Laying of RCC pipe including supply ofrequired quantity at site with collars(forjointing pipe) 150 mm nominal dia toSpec.No:IS-458 in excavatedtrench andlaying of Signalling/ Power cable/PIJF cable/Quadcables/HDPE pipe through RCC pipe.Power cable shall be laid in the sametrenchalongwith signalling/Quad cables but in aseparate pipe RCC pipe at track/puccaroad/ Platform crossing/ level crossing gateetc. | Metre | 80.00 | 775 | 62,000 |
| 38 | Provision of Earthing protectionarrangement as per RDSO drawing no. TCA565(Adv.). All the materials including earthelectrodes required for the work to besupplied by the contractor. | Numbers | 6.00 | 8,680 | 52,080 |
| 39 | Cutting the chase upto a depth of minimum 500 mm.and smoothening of inside surface in concrete and beds of rocks, cable laying/ placing HDPE pipe & concreting upto the ground level. | Metre | 150.00 | 540 | 81,000 |
| 40 | Shifting of existing location boxes to facilitate earthwork of Engg. This includes filling with sand and plastering inside location boxes. | Numbers | 2.00 | 3,580 | 7,160 |
| 41 | Supply and Fixing of Perforated GI pipes of 50 mm dia for entry of cable on girder bridges, RCCbridges, drains, culverts, rocky places, tunnels/ deep cuttings or at places as advised by the engineer in charge ofthe work. This includes trenching up to the required depth as decided by the Engineer at site and making holes of5 mm dia(approx.) at 20 cm intervals on the GI pipe. The pipes are to be fixed on the girder bridge by suitablebridge fixtures at an interval of 1.0 mts. (min) or directives of Railway Engineer. On RCC/masonry bridges or inrocky places, if required the entire length of the pipe is to be concreted up to a height of 100mm above the pipe.GI pipe shall be TATA or Jindal make. | Metre | 100.00 | 635.46 | 63,546 |
| 42 | Installation, Testing & Commissioning ofOnline UPS with complete set ofsuitablebatteries quantity 3 KVA with batterybackup of 60 minutes. The work is tobeexecuted as per the instruction of RailwayEngineer. | Numbers | 1.00 | 3,583.87 | 3,583.87 |
| 43 | Installation, Configuration ,Testing & Commissioning of LAN Extender with all accessories as per RDSO specification No.RDSO/SPN/TC/82/2020 Rev.2.0 or latest. | Numbers | 4.00 | 369 | 1,476 |
| 44 | Installation, Testing & Commissioning of rackmountable 12 port Loaded LIU. Alltheaccessories and fixingmaterials requiredfor this installation are to be supplied bycontractor within the same cost | Numbers | 45.00 | 693.75 | 31,218.75 |
| 45 | Termination / splicing of 6- core OFC cable.This includes supply & mounting ofthe termination box. All other sundry itemsrequired for the execution of the work is tobe supplied by the contractor. The work is tobe executed as per the instruction of railwaysite engineer. Inspection by representative ofSr.DSTE/R | Numbers | 20.00 | 764.35 | 15,287 |
| 46 | Horizontal directional drilling HDD/Borewithout damage of surface with the boreshallbe 150 mm dia .This includes theinsertion of 2 nos HDPE (outer dia 50mm,inner dia -42mm thickness - 4mm)/DWC pipealong with couplings etc. The depth willbe minimum 1.20 m or more from ground levelas per site requirement below the formationlevel of the earth.Note:-HDPE/DWC PipeSupply & OFC pulling/pushing are not coveredunder this item. | Metre | 700.00 | 245 | 1,71,500 |
| 47 | Cutting of the platform with tile/granite/concrete cutting machine or manually to 30cm depth and 12 cm width approximately(including cutting of tiles neatly if provided)by removing slabs/tiles if any and laying ofcables/pipes and filling the trench with riversand and replacing the top surface withsmoothing finished shaped slabs after puttinga laying of cement mortar to the surroundinglevel as per instruction of site in charge. Thesurface have to be made as it was before startof the work duly grinding of surface to make itplane and final satisfaction of representativeof engineering department. The debris is to becleared fromplatform to outside stationpremises and also outsideRailway boundary.Note:- All the sundry materials required for theinstallation ,wiring, testing andcommissioning of above work will be supplied bycontractor. | Metre | 1700.00 | 119.73 | 2,03,541 |
| 48 | Installation, Testing & Comissioning of Single mode Single Fibre 10G SFP module compitable to Layer 3 core switch .The work is to be executed as per the instruction of Railway Site Engineer . | Numbers | 22.00 | 74.35 | 1,635.7 |
| 49 | Cost of Design, survey & submission of drawings for permissions from Authorities (including handmade diagram of the network). (Detailed Specification attached in Annexure-I). | Lumpsum | 4.00 | 23,583.25 | 94,333 |
| 50 | Installation, Testing & Commissioning of 4K UHD Bullet Type IP Colour camera along with Mount. All the accessories and fixing materials including mount requiredfor this installation are to be supplied by contractor within the same cost. | Numbers | 17.00 | 2,899.7 | 49,294.9 |
| 51 | Installation, Testing & Comissioning of Digital Keyboard (Joystick).Thework is to be executed as per the instruction of Railway Site Engineer . | Numbers | 2.00 | 151.44 | 302.88 |
| 52 | Installation, Testing & Commissioning of Server for Video Management and recording along with all accessories as per RDSO Specification No RDSO/SPN/TC/65/2021 Version 6.0 or latest. | Numbers | 3.00 | 545 | 1,635 |
| 53 | Installation, Testing & Commissioning of Server for Video Analytics with required accessories as per RDSO Specification No RDSO/SPN/TC/65/2021 Version 6.0 or latest. | Numbers | 1.00 | 2,180 | 2,180 |
| 54 | Installation, Testing & Comissioning of Panic Switch (IK10 and IP66 rated) with Mushroom Cap Push- Button in Red Color, DPDT contact 2Amps 24 VDC, Stain- less Steel Face Plate with GI Junction Box of suitable size and flasher cum strobe of min. 100dB including all accessories required for installation on platforms at stations.The work is to be executed as per the instruction of Railway Site Engineer . | Numbers | 7.00 | 303.34 | 2,123.38 |
| 55 | Transportation, installation, testing and commissioning of CCTV (RDSO type) setup at Raipur Station as per instruction of railway representative. | Job | 2.00 | 13,098 | 26,196 |
| 56 | Installation, Testing & Commissioning of 64 Channel Network Video Recorder and 64 TB storage after RAID 5/6configuration. All the accessories and fixing materials required for this installation are to be supplied bycontractor within the same cost | Numbers | 1.00 | 3,098.75 | 3,098.75 |
| 57 | Supply, Transportation, fabrication and fixing of Hylum sheet of 12 mm thickness as per site requirement. | Sqm | 1.00 | 2,525 | 2,525 |
| 58 | Deployment of Prokline/ Hydra operation at site for exposing the burried cables or relocation the Location Box/ Signal Post with foundation as perthe advice of Railway site engineer. | Hour | 5.00 | 603 | 3,015 |
| 59 | Transportation, installation, testing & commissioning of Horn Speaker as per instruction of site in-charge. This includes supply of all necessary materials for installation. | Numbers | 27.00 | 307.44 | 8,300.88 |
| 60 | Supply, Installation and commissioning of Surge & Lightning protection arrangement in the cable huts for all the equipments including all the circuits derived from MUX at the stations and Ring Earth (Six Earth pits). Each earth shall be as per RDSO Specification No.RDSO/SPN/197/2008 or latest. | Numbers | 1.00 | 49,643 | 49,643 |
| 61 | Shifting of existing cables by providing location boxes and pieces of signalling cables as required in the yard to facilitate the engineeringdepartment for earth work for laying new lines. (work will be executed in presence of Railway representative). The cost towards new locationfoundation shall be given vide item No.10(a/b/c) of SOR SCH-A when the length of trench is less than 150 meters. | Numbers | 1.00 | 30,189 | 30,189 |
| 62 | Excavation of earth pit, transportation, placingand fixing of earth electrode with constructionof cement encloser to Drg.No.CON/SK/T/9 andCON/SK/T/9A and drawal of GI wire wrapped onMS strip (35 x 6 mm) from earth electrode toall signalling equipments, including fixing andsoldering of lugs at both end of the wire. | Each | 6.00 | 1,941 | 11,646 |
| 63 | Alteration/ Modifications in the existinglocation boxes, fixing ofequipments, cableinsertion, termination, wiring, testing&commissioning, two coat painting, letteringto suit the circuits asper approved wiringdiagrams. This includes filling with sand andplastering the same. | Numbers | 2.00 | 2,548 | 5,096 |
| 64 | Location survey of cable route and preparation of tentative and final cable route plan as perapproved format in the section including supply of final route plan after the cables are laidand commissioned indicating clearly the exact position of the cable, joints and other criticalitems with reference to OHE mast & other fixed point, etc. in 12( twelve) Nos. hard boundcopies on white bond paper of maximum A-3 size (well documented and bound with plasticcovers). | Route Kilo Meter (RKM) | 3.00 | 950 | 2,850 |
| Schedule total | ₹52,38,744.34 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-J.pdf
ATTACHMENT
AnnexureAtoI.pdf
ATTACHMENT
GCCACSs.pdf
ATTACHMENT
letterTTPrailwayboard.pdf
ATTACHMENT
Annexure-2LC.pdf
ATTACHMENT
TAN3006Ver3_1dated30_06_2025Earthing.pdf RDSO TAN
ATTACHMENT
IRGCCApril-2022.pdf
ATTACHMENT
Annexure-VIAVIB.pdf
ATTACHMENT
TAN3006Ver3_1dated30_06_2025Earthing.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .