| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 LRejected-Finance | ₹3.0 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | R. KUMAR L2 | N RAJENDRAN L1 |
|---|---|---|---|---|---|
| 1.00Providing Compund wall around | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B) | 17 | m3 | 115.5 ₹1,963.50 | 109.6 ₹1,863.20 |
| 1.02 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 3 | m3 | 5,688.32 ₹17,064.96 | 5,397.95 ₹16,193.85 |
| 1.03 | R.R.Masonry in Cement mortar 1 : 5 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers. | 13 | m3 | 6,044.96 ₹78,584.48 | 5,736.37 ₹74,572.81 |
| 1.04 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 18 | m2 | 662.6 ₹11,926.80 | 628.78 ₹11,318.04 |
| 1.05 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 100 | Kg | 97.62 ₹9,762 | 92.64 ₹9,264 |
| 1.06 | Reinforced Cement concrete 1:2 :4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 3 | m3 | 9,133.43 ₹27,400.29 | 8,667.19 ₹26,001.57 |
| 1.07 | Brick work in CM 1:5 (one cement & five sand) using II class ground moulded bricks of size 9"X43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification. | 9 | m3 | 6,736.38 ₹60,627.42 | 6,392.5 ₹57,532.50 |
| 1.08 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 162 | m2 | 300.46 ₹48,674.52 | 285.12 ₹46,189.44 |
| 1.09 | White washing one coat with freshly burnt white shell lime in all floors including cost
of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers. | 162 | m2 | 28.67 ₹4,644.54 | 27.2 ₹4,406.40 |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
22 Jan 2026, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Providing Compund wall around at UPHC in Kalaignar Nagar, Ward No.52
2026_MAWS_642377_1
494/2025-26/AEE
Open Tender
Civil Works
90 days
Nagercoil Corporation Providing Compund wall aroun
Registered Contractor
3 documents required · 3 mandatory
₹0
₹3,500
15 Jun 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B)
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
R.R.Masonry in Cement mortar 1 : 5 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers.
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforced Cement concrete 1:2 :4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Brick work in CM 1:5 (one cement & five sand) using II class ground moulded bricks of size 9"X43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers.
Painting New Plastered Wall Surface with One finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_769587.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
BOQ_769587.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid