Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC NAI SARAI RAMGARH CANTT DISTT RAMGARH PIN 829122 | RAMGARH | JHARKHAND | 829122 | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 L+₹17,605.60 (3.52%)Rejected-Finance | ₹5.2 L+₹17,605.60 (3.52%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | M/S R N ENTERPRISES L1 | M/S NEW ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | A. 630KVA, 3.3KV/440VTran., Sl.No.185/TS, MakeA/Y, CheckPost Colony Cost of HT Bushing with stud and nut washer | 1 | No. | 11,329 ₹11,329 Lowest | 11,400 ₹11,400 |
| 2.00 | Cork Sheet | 1 | No. | 2,406 ₹2,406 Lowest | 2,450 ₹2,450 |
| 3.00 | Breather with silica Gel | 1 | No. | 10,790 ₹10,790 Lowest | 10,800 ₹10,800 |
| 4.00 | GI Pipe with accessories | 1 | No. | 2,751 ₹2,751 Lowest | 2,800 ₹2,800 |
| 5.00 | Complete painting & cleaning of Transformer | 1 | No. | 8,092 ₹8,092 Lowest | 8,100 ₹8,100 |
| 6.00 | Oil top-up (Oil supplied by departmental) | 1 | No. | 1,132 ₹1,132 Lowest | 1,160 ₹1,160 |
| 7.00 | Installation charge | 1 | No. | 4,091 ₹4,091 Lowest | 5,506 ₹5,506 |
| 8.00 | Overheads & Profit | 1 | No. | 4,059 ₹4,059 Lowest | 4,221 ₹4,221 |
| 9.00 | B. 630KVA, 3.3KV/440V Tran., Sl.No. TSE1029, Make ESPL, Jarjara Colony No.-1 Breather with silica Gel | 1 | No. | 10,790 ₹10,790 Lowest | 10,800 ₹10,800 |
| 10.00 | Cost of LT Bushing with stud and nut washer | 1 | No. | 10,358 ₹10,358 Lowest | 10,400 ₹10,400 |
Tender Value
₹4.6 L
EMD Value
₹5,800
Closing Date
13 Sept 2025, 3:00 pmClosed
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP,Barka Sayal Area, Pin 825311
Repairing and maintenance of 8 no distribution transformer(Outdoor type) installed at different location under Urimari Project.
2025_CCL_343006_1
PE(EnM)/Urimari/e Tender/25-26/19
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹5,800
4 Sept 2026
2 Sept 2025
15 Sept 2025
3 Sept 2025
13 Sept 2025
3 Sept 2025
3 Sept 2025 - 10 Sept 2025
Amount
A. 630KVA, 3.3KV/440VTran., Sl.No.185/TS, MakeA/Y, CheckPost Colony Cost of HT Bushing with stud and nut washer
Cork Sheet
Breather with silica Gel
GI Pipe with accessories
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
B. 630KVA, 3.3KV/440V Tran., Sl.No. TSE1029, Make ESPL, Jarjara Colony No.-1 Breather with silica Gel
Cost of LT Bushing with stud and nut washer
Cork Sheet
GI Pipe with accessories
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
C. 630KVA, 3.3KV/440V Tran., Sl.No.184/TS, MakeA/Y, Jarjara Colony No.-2 Breather with silica Gel
GI Pipe with accessories
Cork Sheet
Cost of HT Bushing with stud with nut washer
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
D. 500KVA, 3.3KV/440V Tran., Sl.No.179/TS, Make A/Y, C-Type Officer Colony Cost of LT Bushing with stud and nut washer
Cork Sheet
Breather with silica Gel
GI Pipe with accessories
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
E. 500KVA, 3.3KV/440V Tran., Sl.No. 180/TS, MakeA/Y, Check Post Colony Breather with silica Gel
Cost of LT Bushing with stud with nut washer
GI Pipe with accessories
Cork Sheet
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
F.250KVA,3.3KV/440V Tran., Sl.No. TSE/1025, Make ESPL, BaseWorkshop Cost of LT Bushing with stud and nut washer
Cost of HT Bushing with stud with nut washer
Cork Sheet
Breather with silica Gel
GI Pipe with accessories
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
G. 300KVA,11KV/440VTran., Sl.No.174/1, Make East Electrical Pvt.Ltd, Tipla Siding Cost of HT Bushing with stud and nut washer
Cost of LT Bushing with stud with nut washer
Breather with silica Gel
GI Pipe with accessories
Cork Sheet
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
H.250KVA, 11KV/440V Tran., Sl.No. 131529, Make Ujjaas Energy Ltd., Tipla Siding Cost of LT Bushing with stud and nut washer
Cork Sheet
Breather with silica Gel
GI Pipe with accessories
Complete painting & cleaning of Transformer
Oil top-up (Oil supplied by departmental)
Installation charge
Overheads & Profit
Total impact of GST for the purpose of CTC
M/S NEW ENTERPRISES (BID ID -1181088)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .