Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Fee/PreQual/Technical/Finance | -30.01% | ₹2.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.2 L+₹8,729.97 (4.16%)Admitted-Fee/PreQual/Technical/Finance | -27.10% | ₹2.2 L+₹8,729.97 (4.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.4 L+₹30,029.91 (14.3%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2.4 L+₹30,029.91 (14.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹2.4 L+₹30,029.91 (14.3%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2.4 L+₹30,029.91 (14.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹2.4 L+₹33,599.90 (16.0%)Admitted-Fee/PreQual/Technical/Finance | -18.81% | ₹2.4 L+₹33,599.90 (16.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
8 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
CHAIN LINK FENCING ALONG WITH MAIN GATE T A SHAH
2026_RDPR_323243_7
NIT81
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹6,000
15 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
8 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P/F of steel (angle iron ( 40x40x5mm)/ flat iron (30x3mm)) for fixing of chain link fencing | 507.93 | Kg | 120.8 | ₹61,357.94 |
| 2 | P/F of chain link fencing 2"x2" mesh including cost of paint. | 104.83 | Sqm | 731.68 | ₹76,702.01 |
| 3 | Providing and fixing of 8mm thick ply board backside of panelling including cost of nails and 25mm thick wooden cornice but excluding cost of supporting structure | 74.91 | Sqm | 688.64 | ₹51,586.02 |
| 4 | Providing and fixing of PVC panelling pre laminated one side decorative lamination and other side balancing lamination including cost of necessary fixing arrangements and screws etc | 74.91 | Sqm | 1,076 | ₹80,603.16 |
| 5 | Providing and Fixing of Structural steel work welded in built up section, trusses and framed work included cutting, hoisting, fixing in position and applying a prming coat of approved steel primer all complete. | 200 | Kg | 138.5 | ₹27,700 |
| 6 | Add provision for Signboard & Photographs. | 1 | No | 2,050 | ₹2,050 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1087275.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .